If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0664260109000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.682415,"lon":-113.791151,"icon":""}]} |
Location: 00/09-01-066-26W4/0 | |
Location Alias: 00/09-01-66-26 W4M | |
Location Alias 2: 00/09-01-066-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 066 | |
Meridian: 4 | |
Range: 26 | |
Section: 01 | |
County/Municipality: Municipal District of Lesser Slave River No. 124 | |
Well Name: SEQUOIA BIGB 9-1-66-26 | |
Operator Name: Sequoia Resources Corp. | |
License Number: 0239509 | |
License Date: 2000-07-05 | |
License Status: Suspension | |
Spud Date: 2000-07-26 | |
Final Drill Date: 2000-08-02 | |
Well Total Depth: 1015.00 m | |
Surface Hole Latitude: 54.682415 | |
Surface Hole Longitude: -113.791151 |
Date | Event |
---|---|
2000-07-05 | Obtained License |
2000-07-27 | Surface Casing Operation Performed |
2000-07-29 | Lost Circulation Occurred |
2000-07-30 | Well Log Performed |
2000-07-31 | Intermediate Casing Operation Performed |
2000-08-01 | Lost Circulation Occurred |
2000-08-02 | Finished Drilling |
2000-08-02 | Well Log Performed |
2000-08-03 | Drill Stem Test Performed |
2000-08-04 | Drill Stem Test Performed |
2000-08-04 | Production Casing Operation Performed |
2000-08-04 | Rig Released |
2000-08-04 | Well Mode changed to Drilled and Cased |
2000-08-16 | Perforation Treatment Performed - Jet Perforation |
2000-08-16 | Well Log Performed |
2000-08-20 | Well Began Production |
2000-08-20 | Well Fluid changed to Crude Oil |
2000-08-20 | Well Mode changed to Pumping |
2001-02-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-02-20 | Plug Back Performed |
2001-02-20 | Well Fluid changed to Crude Oil |
2001-02-20 | Well Log Performed |
2001-02-20 | Well Mode changed to Abandoned Zone |
2001-02-21 | Perforation Treatment Performed - Jet Perforation |
2001-09-12 | Perforation Treatment Performed - Jet Perforation |
2001-09-12 | Well Log Performed |
2002-03-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-03-09 | Plug Back Performed |
2002-03-09 | Well Log Performed |
2002-03-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-03-10 | Perforation Treatment Performed - Jet Perforation |
2002-03-10 | Plug Back Performed |
2004-08-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-08-17 | Perforation Treatment Performed - Jet Perforation |
2004-08-17 | Plug Back Performed |
2004-08-18 | Perforation Treatment Performed - Jet Perforation |
2004-08-18 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2000-08-16 | Perforation | 943.50 | 945.00 | 13 |
2002-03-10 | Perforation | 792.00 | 792.50 | 17 |
2004-08-17 | Packing Device Capped w/Cement | 772.00 | 780.00 | 0 |
2004-08-17 | Perforation | 623.00 | 624.00 | 17 |
2004-08-18 | Perforation | 619.00 | 620.00 | 17 |
2001-02-20 | Packing Device Capped w/Cement | 927.00 | 935.00 | 0 |
2001-02-21 | Perforation | 820.00 | 821.00 | 13 |
2001-09-12 | Perforation | 813.00 | 814.00 | 20 |
2001-09-12 | Perforation | 815.00 | 815.50 | 20 |
2002-03-09 | Packing Device Capped w/Cement | 815.00 | 818.00 | 0 |
2002-03-10 | Packing Device Capped w/Cement | 802.00 | 810.00 | 0 |
2002-03-10 | Perforation | 788.00 | 790.50 | 17 |
2002-03-10 | Perforation | 791.50 | 792.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2000 | 1456 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2000-07-29 | Lost Circulation | 884.00 | 907.00 |
2000-08-01 | Lost Circulation | 1015.00 | 1015.00 |
For data sources see[6]