X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0664242807003

Well Details

Well ID: 0664242807003
Loading map...
Location: 00/07-28-066-24W4/3
Location Alias: 00/07-28-66-24 W4M
Location Alias 2: 00/07-28-066-24 W4/03
Country: Canada
Province: Alberta
Township: 066
Meridian: 4
Range: 24
Section: 28
County/Municipality: Athabasca County
Well Name: CNRL STEELE 7-28-66-24
Operator Name: Canadian Natural Resources Limited
License Number: 0062818
License Date: 1977-02-17
License Status: Suspension
Spud Date: 1977-02-21
Final Drill Date: 1977-02-26
Well Total Depth: 676.70 m
Surface Hole Latitude: 54.739539
Surface Hole Longitude: -113.568102

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-02-17 Obtained License
1977-02-24 Drill Stem Test Performed
1977-02-24 Well Log Performed
1977-02-25 Drill Stem Test Performed
1977-02-26 Drill Stem Test Performed
1977-02-26 Finished Drilling
1977-02-26 Production Casing Operation Performed
1977-02-26 Well Log Performed
1977-02-26 Well Mode changed to Drilled and Cased
1977-03-10 Perforation Treatment Performed - Jet Perforation
1977-03-11 Perforation Treatment Performed - Jet Perforation
1977-03-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-03-16 Perforation Treatment Performed - Cement Squeeze
1977-03-18 Perforation Treatment Performed - Jet Perforation
1990-05-29 Well Log Performed
1990-06-20 Well Log Performed
1990-07-19 Well Log Performed
1990-07-24 Well Log Performed
1990-08-17 Well Log Performed
1990-08-18 Well Log Performed
1990-09-08 Well Log Performed
1994-02-27 Perforation Treatment Performed - Jet Perforation
1994-02-27 Well Log Performed
1994-03-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-02 Perforation Treatment Performed - Jet Perforation
1994-03-02 Well Log Performed
1994-03-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-03-03 Perforation Treatment Performed - Jet Perforation
1994-03-03 Plug Back Performed
1994-03-07 Perforation Treatment Performed - Jet Perforation
1994-05-07 Well Log Performed
1995-07-01 Well Began Production
1995-07-01 Well Fluid changed to Gas
1995-07-01 Well Mode changed to Flowing
2003-04-01 Well Fluid changed to Gas
2003-04-01 Well Mode changed to Suspended
2012-09-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-11-09 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-03-10 Perforation 629.70 630.30 7
1994-03-03 Packing Device Capped w/Cement 619.00 627.00 0
1994-03-03 Perforation 469.40 470.60 13
1994-03-07 Perforation 473.60 475.20 13
1994-03-07 Perforation 475.80 476.70 13
2012-09-21 Packing Device Capped w/Cement 502.50 510.50 0
1977-03-10 Perforation 632.50 634.00 7
1977-03-11 Perforation 474.00 475.20 7
1977-03-13 Acid Treatment 474.00 475.20 0
1977-03-16 Cement Squeeze 474.00 475.20 0
1977-03-18 Perforation 524.00 525.20 7
1994-02-27 Perforation 648.70 649.70 13
1994-03-01 Acid Treatment 629.70 649.70 0
1994-03-02 Perforation 642.10 643.10 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 1711 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-09-22 No Incident Encountered 0.00 0.00
2012-09-22 No Incident Encountered 0.00 0.00

For data sources see[6]

References