X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0664222416002

Well Details

Well ID: 0664222416002
Loading map...
Location: 00/16-24-066-22W4/2
Location Alias: 00/16-24-66-22 W4M
Location Alias 2: 00/16-24-066-22 W4/02
Country: Canada
Province: Alberta
Township: 066
Meridian: 4
Range: 22
Section: 24
County/Municipality: Athabasca County
Well Name: RENAISSANCE ATHAE 16-24-66-22
Operator Name: Husky Oil Operations Limited
License Number: 0172546
License Date: 1994-11-16
License Status: Abandoned
Spud Date: 1994-11-30
Final Drill Date: 1994-12-02
Well Total Depth: 627.00 m
Surface Hole Latitude: 54.731543
Surface Hole Longitude: -113.187975

For data sources see[1][2]

Well History

Date Event
1994-11-16 Obtained License
1994-12-01 Surface Casing Operation Performed
1994-12-02 Finished Drilling
1994-12-02 Well Log Performed
1994-12-02 Well Mode changed to Drilled and Cased
1994-12-03 Production Casing Operation Performed
1994-12-03 Rig Released
1994-12-10 Perforation Treatment Performed - Jet Perforation
1994-12-12 Perforation Treatment Performed - Jet Perforation
1994-12-15 Perforation Treatment Performed - Fractured
1994-12-17 Perforation Treatment Performed - Jet Perforation
1995-05-24 Perforation Treatment Performed - Jet Perforation
1995-11-01 Well Began Production
1995-11-01 Well Fluid changed to Gas
1995-11-01 Well Mode changed to Flowing
1997-08-06 Perforation Treatment Performed - Jet Perforation
1998-08-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-08-10 Perforation Treatment Performed - Jet Perforation
1998-08-10 Plug Back Performed
1999-05-31 Well Fluid changed to Gas
1999-05-31 Well Mode changed to Suspended
2000-10-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-10-12 Plug Back Performed
2000-10-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-10-13 Plug Back Performed
2005-11-03 Perforation Treatment Performed - Jet Perforation
2005-11-03 Well Log Performed
2011-11-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-11-05 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2011-11-05 Plug Back Performed
2011-11-05 Well Fluid changed to Gas
2011-11-05 Well Mode changed to Abandoned Zone
2011-11-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-11-07 Perforation Treatment Performed - Remedial Casing
2018-07-06 Well Log Performed
2018-08-16 Perforation Treatment Performed - Jet Perforation
2018-08-16 Well Log Performed
2018-08-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-08-17 Perforation Treatment Performed - Cement Plug
2018-08-17 Perforation Treatment Performed - Remedial Casing
2018-08-18 Perforation Treatment Performed - Jet Perforation
2018-08-18 Well Log Performed
2018-08-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-08-23 Perforation Treatment Performed - Cement Plug
2018-08-23 Perforation Treatment Performed - Remedial Casing
2018-08-28 Perforation Treatment Performed - Cement Plug
2018-09-05 Well Log Performed
2018-09-07 Perforation Treatment Performed - Jet Perforation
2018-09-07 Well Log Performed
2018-09-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-09-10 Perforation Treatment Performed - Cement Plug
2018-09-10 Perforation Treatment Performed - Remedial Casing
2018-10-09 Well Abandoned
2018-10-09 Well Fluid changed to Gas
2018-10-09 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-12-10 Perforation 596.50 598.00 13
1998-08-10 Packing Device Capped w/Cement 579.00 587.00 0
1998-08-10 Perforation 469.00 469.50 13
2000-10-12 Packing Device Capped w/Cement 501.80 509.80 0
2000-10-13 Packing Device Capped w/Cement 469.80 477.80 0
2005-11-03 Perforation 446.00 448.00 17
2011-11-05 Packing Device Capped w/Cement 457.00 465.00 0
2011-11-05 Packing Dev Cpd w/Res-Gyp Cem 440.00 443.00 0
2011-11-06 Acid Treatment 436.00 437.00 0
2011-11-07 Remedial Casing Cementing 436.00 437.00 0
2018-08-16 Perforation 397.50 400.50 20
1994-12-10 Perforation 599.00 600.50 13
2018-08-17 Remedial Casing Cementing 397.50 400.50 0
2018-08-17 Cement Plug 393.80 400.50 0
2018-08-17 Packing Device Capped w/Cement 384.90 393.80 0
2018-08-18 Perforation 240.00 243.00 20
2018-08-18 Perforation 240.00 243.00 17
2018-08-23 Remedial Casing Cementing 240.00 243.00 0
2018-08-23 Cement Plug 235.00 243.00 0
2018-08-23 Packing Device Capped w/Cement 230.00 235.00 0
2018-08-28 Cement Plug 225.00 230.00 0
2018-09-07 Perforation 163.00 166.00 20
1994-12-12 Perforation 596.50 598.00 13
2018-09-10 Remedial Casing Cementing 163.00 166.00 0
2018-09-10 Cement Plug 158.60 166.00 0
2018-09-10 Packing Device Capped w/Cement 146.70 158.60 0
1994-12-12 Perforation 599.00 600.50 13
1994-12-15 Fracture 596.50 600.50 0
1994-12-17 Perforation 517.50 518.50 13
1995-05-24 Perforation 445.00 446.00 13
1995-05-24 Perforation 483.00 484.00 13
1997-08-06 Perforation 436.00 437.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 1460 0.0 0.0 0.0
1996 8720 0.0 0.0 0.0
1997 3912 0.0 0.0 0.0
1998 8440 0.0 0.0 0.0
1999 1629 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-09-11 No Incident Encountered 0.00 0.00

For data sources see[6]

References