X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0656141409000

Well Details

Well ID: 0656141409000
Loading map...
Location: 00/09-14-065-14W6/0
Location Alias: 00/09-14-65-14 W6M
Location Alias 2: 00/09-14-065-14 W6/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 6
Range: 14
Section: 14
County/Municipality: Municipal District of Greenview No. 16
Well Name: MAPAN ENERGY CHINOOKR 9-14-65-14
Operator Name: Tourmaline Oil Corp.
License Number: 0413862
License Date: 2009-11-12
License Status: Issued
Spud Date: 2010-01-07
Final Drill Date: 2010-11-20
Well Total Depth: 4537.00 m
Surface Hole Latitude: 54.631039
Surface Hole Longitude: -119.969775

For data sources see[1][2]

Well History

Date Event
2009-11-12 Obtained License
2010-01-14 Surface Casing Operation Performed
2010-01-25 Direction Drilling Operation Performed - Horizontal
2010-01-26 Lost Circulation Occurred
2010-02-01 Lost Circulation Occurred
2010-02-08 Lost Circulation Occurred
2010-02-10 Intermediate Casing Operation Performed
2010-06-24 Well Log Performed
2010-10-28 Well Log Performed
2010-10-31 Well Log Performed
2010-11-20 Finished Drilling
2010-11-20 Well Log Performed
2010-11-20 Well Mode changed to Drilled and Cased
2010-11-23 Well Log Performed
2010-11-29 Production Casing Operation Performed
2010-12-02 Rig Released
2011-02-03 Perforation Treatment Performed - Multi-Stage Fracture
2011-02-11 Well Fluid changed to Gas
2011-02-11 Well Mode changed to Testing
2011-03-16 Well Began Production
2011-03-16 Well Fluid changed to Gas
2011-03-16 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-01-25 1980.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-02-03 Multi-Stage Fracture 4340.00 4362.10 0
2011-02-03 Multi-Stage Fracture 4233.00 4340.00 0
2011-02-03 Multi-Stage Fracture 4114.00 4233.00 0
2011-02-03 Multi-Stage Fracture 4006.00 4114.00 0
2011-02-03 Multi-Stage Fracture 3927.00 4006.00 0
2011-02-03 Multi-Stage Fracture 3836.00 3927.00 0
2011-02-03 Multi-Stage Fracture 3719.00 3836.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 6957 0.0 0.0 0.0
2012 6861 0.0 0.0 0.0
2013 8229 0.0 0.0 0.0
2014 8306 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8664 0.0 0.0 0.0
2017 8592 0.0 0.0 0.0
2018 7391 0.0 0.0 0.0
2019 8595 0.0 0.0 0.0
2020 2160 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-01-26 Lost Circulation 2018.00 2044.00
2010-02-01 Lost Circulation 2487.00 2520.00
2010-02-08 Lost Circulation 2640.00 2650.00

For data sources see[7]

References