X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0656132203032

Well Details

Well ID: 0656132203032
Loading map...
Location: 03/03-22-065-13W6/2
Location Alias: 03/03-22-65-13 W6M
Location Alias 2: 03/03-22-065-13 W6/02
Country: Canada
Province: Alberta
Township: 065
Meridian: 6
Range: 13
Section: 22
County/Municipality: Municipal District of Greenview No. 16
Well Name: MAPAN ENERGY CHINOOKR 3-22-65-13
Operator Name: Tourmaline Oil Corp.
License Number: 0358987
License Date: 2006-06-15
License Status: Amended
Spud Date: 2006-07-21
Final Drill Date: 2006-09-17
Well Total Depth: 3435.00 m
Surface Hole Latitude: 54.637484
Surface Hole Longitude: -119.875942

For data sources see[1][2]

Well History

Date Event
2006-06-15 Obtained License
2006-07-26 Surface Casing Operation Performed
2006-08-06 Direction Drilling Operation Performed - Deviate
2006-08-13 Well Log Performed
2006-08-14 Intermediate Casing Operation Performed
2006-09-17 Finished Drilling
2006-09-17 Well Log Performed
2006-09-17 Well Mode changed to Drilled and Cased
2006-09-20 Production Casing Operation Performed
2006-09-22 Rig Released
2006-12-17 Perforation Treatment Performed - Jet Perforation
2006-12-18 Perforation Treatment Performed - Fractured
2006-12-20 Perforation Treatment Performed - Jet Perforation
2007-01-04 Perforation Treatment Performed - Fractured
2007-01-04 Perforation Treatment Performed - Jet Perforation
2007-01-05 Perforation Treatment Performed - Fractured
2007-01-05 Perforation Treatment Performed - Jet Perforation
2007-01-16 Perforation Treatment Performed - Fractured
2007-05-01 Well Structure changed to Commingled
2009-11-14 Perforation Treatment Performed - Jet Perforation
2009-11-16 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2006-08-06 1948.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-12-17 Perforation 3293.00 3293.70 10
2007-01-05 Fracture 3164.00 3180.70 0
2007-01-05 Perforation 3132.00 3136.00 20
2007-01-16 Fracture 3132.00 3136.00 0
2009-11-14 Perforation 3280.00 3280.90 10
2009-11-14 Perforation 3275.00 3275.90 10
2009-11-14 Perforation 3265.00 3265.90 10
2009-11-14 Perforation 3255.00 3255.90 10
2009-11-14 Perforation 3251.00 3251.60 10
2009-11-14 Perforation 3249.00 3249.60 10
2009-11-14 Perforation 3240.00 3240.90 10
2006-12-17 Perforation 3268.00 3269.50 10
2009-11-14 Perforation 3230.00 3230.60 10
2009-11-14 Perforation 3220.00 3220.60 10
2009-11-14 Perforation 3213.00 3213.60 10
2009-11-14 Perforation 3205.00 3205.30 10
2009-11-14 Perforation 3200.00 3200.60 10
2009-11-14 Perforation 3190.00 3190.60 10
2009-11-14 Perforation 3185.00 3185.60 10
2009-11-14 Perforation 3170.00 3170.30 10
2009-11-14 Perforation 3160.00 3160.30 10
2009-11-14 Perforation 3155.00 3155.30 10
2006-12-18 Fracture 3268.00 3293.70 0
2009-11-14 Perforation 3145.00 3145.30 10
2009-11-14 Perforation 3135.00 3135.90 10
2009-11-16 Fracture 3135.00 3280.90 0
2006-12-20 Perforation 3245.00 3245.80 10
2006-12-20 Perforation 3222.00 3222.80 10
2006-12-20 Perforation 3202.00 3202.60 10
2007-01-04 Fracture 3202.00 3245.80 0
2007-01-04 Perforation 3180.00 3180.70 10
2007-01-05 Perforation 3164.00 3165.90 10

For data sources see[5]



References