If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0656131203000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.604791,"lon":-119.830098,"icon":""}]} |
Location: 00/03-12-065-13W6/0 | |
Location Alias: 00/03-12-65-13 W6M | |
Location Alias 2: 00/03-12-065-13 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 065 | |
Meridian: 6 | |
Range: 13 | |
Section: 12 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: PAN AM CHINOOK RIDGE A-1 | |
Operator Name: BP Canada Energy Group ULC | |
License Number: 0008795 | |
License Date: 1954-11-26 | |
License Status: RecExempt | |
Spud Date: 1954-12-20 | |
Final Drill Date: 1956-01-15 | |
Well Total Depth: 3496.40 m | |
Surface Hole Latitude: 54.604791 | |
Surface Hole Longitude: -119.830098 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1954-11-26 | Obtained License |
1955-01-04 | Drill Stem Test Performed |
1955-01-07 | Drill Stem Test Performed |
1955-01-13 | Drill Stem Test Performed |
1955-01-28 | Drill Stem Test Performed |
1955-01-28 | Lost Circulation Occurred |
1955-01-29 | Drill Stem Test Performed |
1955-02-06 | Drill Stem Test Performed |
1955-03-13 | Perforation Treatment Performed - Bullet Perforation |
1955-03-23 | Perforation Treatment Performed - Fractured |
1955-08-22 | Perforation Treatment Performed - Cement Squeeze |
1955-09-10 | Drill Stem Test Performed |
1955-09-21 | Lost Circulation Occurred |
1955-10-12 | Drill Stem Test Performed |
1955-10-29 | Drill Stem Test Performed |
1956-01-01 | Perforation Treatment Performed - Bullet Perforation |
1956-01-15 | Finished Drilling |
1956-01-22 | Production Casing Operation Performed |
1956-02-02 | Perforation Treatment Performed - Bullet Perforation |
1956-02-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1956-02-04 | Perforation Treatment Performed - Bullet Perforation |
1956-02-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1956-02-06 | Perforation Treatment Performed - Bullet Perforation |
1956-02-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1956-02-12 | Perforation Treatment Performed - Jet Perforation |
1956-02-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1956-02-16 | Perforation Treatment Performed - Jet Perforation |
1956-02-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1956-03-01 | Perforation Treatment Performed - Jet Perforation |
1956-03-26 | Well Mode changed to Drilled and Cased |
1968-01-25 | Perforation Treatment Performed - Cement Plug |
1968-01-25 | Well Abandoned |
1968-01-25 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1955-03-13 | Bullet Perforation | 1354.50 | 1364.30 | 13 |
1956-02-06 | Packing Device Capped w/Cement | 2868.20 | 2868.20 | 0 |
1956-02-06 | Bullet Perforation | 2785.90 | 2799.60 | 26 |
1956-02-12 | Packing Device Capped w/Cement | 2868.20 | 2868.20 | 0 |
1956-02-12 | Perforation | 2804.20 | 2816.40 | 26 |
1956-02-15 | Packing Device Capped w/Cement | 2782.80 | 2782.80 | 0 |
1956-02-16 | Perforation | 2770.60 | 2778.30 | 26 |
1956-02-29 | Acid Treatment | 2770.60 | 2778.30 | 0 |
1956-03-01 | Perforation | 2770.60 | 2778.30 | 20 |
1968-01-25 | Cement Plug | 2661.50 | 2781.30 | 0 |
1955-03-13 | Bullet Perforation | 1463.00 | 1467.30 | 13 |
1955-03-13 | Bullet Perforation | 1472.20 | 1482.50 | 13 |
1955-03-23 | Fracture | 1354.50 | 1482.50 | 0 |
1955-08-22 | Cement Squeeze | 1354.50 | 1482.50 | 0 |
1956-01-01 | Bullet Perforation | 3365.00 | 3371.10 | 26 |
1956-02-02 | Bullet Perforation | 3337.00 | 3343.70 | 26 |
1956-02-04 | Packing Device Capped w/Cement | 3322.30 | 3322.30 | 0 |
1956-02-04 | Bullet Perforation | 2874.90 | 2891.00 | 26 |
For data sources see[4]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1955-01-28 | Lost Circulation | 1353.90 | 1353.90 |
1955-09-21 | Lost Circulation | 2397.30 | 2397.30 |
For data sources see[5]