X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0656061414020

Well Details

Well ID: 0656061414020
Loading map...
Location: 02/14-14-065-06W6/0
Location Alias: 02/14-14-65-06 W6M
Location Alias 2: 02/14-14-065-06 W6/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 6
Range: 06
Section: 14
County/Municipality: Municipal District of Greenview No. 16
Well Name: PARA HZ 102 WAPITI 14-14-65-6
Operator Name: Paramount Resources Ltd.
License Number: 0480373
License Date: 2016-09-20
License Status: Issued
Spud Date: 2016-09-29
Final Drill Date: 2017-01-18
Well Total Depth: 6227.00 m
Surface Hole Latitude: 54.602752
Surface Hole Longitude: -118.791816

For data sources see[1][2]

Well History

Date Event
2016-09-20 Obtained License
2016-09-29 Lost Circulation Occurred
2016-10-01 Surface Casing Operation Performed
2016-10-25 Direction Drilling Operation Performed - Deviate
2016-11-06 Intermediate Casing Operation Performed
2017-01-05 Direction Drilling Operation Performed - Horizontal
2017-01-05 Well Log Performed
2017-01-18 Finished Drilling
2017-01-18 Well Log Performed
2017-01-18 Well Mode changed to Drilled and Cased
2017-01-25 Liner Casing Operation Performed
2017-01-25 Rig Released
2017-06-28 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-29 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-04 Perforation Treatment Performed - Jet Perforation
2017-07-07 Perforation Treatment Performed - Jet Perforation
2017-07-07 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-08 Perforation Treatment Performed - Jet Perforation
2017-07-08 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-09 Perforation Treatment Performed - Jet Perforation
2017-07-09 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-10 Perforation Treatment Performed - Jet Perforation
2017-07-10 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-11 Perforation Treatment Performed - Jet Perforation
2017-07-11 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-12 Perforation Treatment Performed - Jet Perforation
2017-07-12 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-13 Perforation Treatment Performed - Jet Perforation
2017-07-13 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-14 Perforation Treatment Performed - Jet Perforation
2017-07-14 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-15 Perforation Treatment Performed - Jet Perforation
2017-07-15 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-16 Perforation Treatment Performed - Jet Perforation
2017-07-16 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-17 Perforation Treatment Performed - Jet Perforation
2017-07-17 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-18 Perforation Treatment Performed - Jet Perforation
2017-07-18 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-19 Perforation Treatment Performed - Jet Perforation
2017-07-19 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-20 Perforation Treatment Performed - Jet Perforation
2017-07-20 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-21 Perforation Treatment Performed - Jet Perforation
2017-07-21 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-22 Perforation Treatment Performed - Jet Perforation
2017-07-22 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-23 Perforation Treatment Performed - Jet Perforation
2017-07-23 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-24 Perforation Treatment Performed - Jet Perforation
2017-07-24 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-25 Perforation Treatment Performed - Jet Perforation
2017-07-25 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-26 Perforation Treatment Performed - Jet Perforation
2017-07-26 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-27 Perforation Treatment Performed - Jet Perforation
2017-07-27 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-28 Perforation Treatment Performed - Jet Perforation
2017-07-28 Perforation Treatment Performed - Multi-Stage Fracture
2017-09-20 Well Began Production
2017-09-20 Well Fluid changed to Gas
2017-09-20 Well Mode changed to Flowing
2017-09-28 Well Log Performed
2018-06-01 Well Fluid changed to Gas
2018-06-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-01-03 Fox Drilling Inc. 7 N/A Resumption
2016-10-24 Fox Drilling Inc. 7 N/A Resumption
2016-09-29 Fox Drilling Inc. 7 N/A Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-10-25 781.10 Deviate (5 - 79 degrees)
2017-01-05 3299.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-06-28 Multi-Stage Fracture 6143.30 6159.90 0
2017-06-28 Multi-Stage Fracture 5771.10 5771.20 0
2017-07-16 Perforation 4658.00 4659.00 21
2017-07-16 Perforation 4644.00 4645.00 21
2017-07-16 Multi-Stage Fracture 4644.00 4672.00 0
2017-07-16 Perforation 4631.00 4632.00 21
2017-07-16 Perforation 4619.00 4620.00 21
2017-07-16 Perforation 4606.00 4607.00 21
2017-07-16 Multi-Stage Fracture 4606.00 4632.00 0
2017-07-17 Perforation 4590.00 4591.00 21
2017-07-17 Perforation 4577.00 4578.00 21
2017-07-17 Perforation 4565.00 4566.00 21
2017-06-29 Multi-Stage Fracture 5729.60 5729.70 0
2017-07-17 Multi-Stage Fracture 4565.00 4591.00 0
2017-07-17 Perforation 4551.00 4552.00 21
2017-07-17 Perforation 4538.00 4539.00 21
2017-07-17 Perforation 4525.00 4526.00 21
2017-07-17 Multi-Stage Fracture 4525.00 4552.00 0
2017-07-17 Perforation 4511.00 4512.00 21
2017-07-17 Perforation 4498.00 4499.00 21
2017-07-17 Perforation 4485.00 4486.00 21
2017-07-18 Multi-Stage Fracture 4485.00 4512.00 0
2017-07-18 Perforation 4471.00 4472.00 21
2017-06-29 Multi-Stage Fracture 5688.20 5688.30 0
2017-07-18 Perforation 4458.00 4459.00 21
2017-07-18 Perforation 4445.00 4446.00 21
2017-07-18 Multi-Stage Fracture 4445.00 4472.00 0
2017-07-18 Perforation 4431.00 4432.00 21
2017-07-18 Perforation 4418.00 4419.00 21
2017-07-18 Perforation 4405.00 4406.00 21
2017-07-18 Multi-Stage Fracture 4405.00 4432.00 0
2017-07-19 Perforation 4391.00 4392.00 21
2017-07-19 Perforation 4378.00 4379.00 21
2017-07-19 Perforation 4365.00 4366.00 21
2017-06-29 Multi-Stage Fracture 5646.70 5646.80 0
2017-07-19 Multi-Stage Fracture 4365.00 4392.00 0
2017-07-19 Perforation 4351.00 4352.00 21
2017-07-19 Perforation 4338.00 4339.00 21
2017-07-19 Perforation 4325.00 4326.00 21
2017-07-19 Multi-Stage Fracture 4325.00 4352.00 0
2017-07-19 Perforation 4311.00 4312.00 21
2017-07-19 Perforation 4298.00 4299.00 21
2017-07-19 Perforation 4285.00 4286.00 21
2017-07-20 Multi-Stage Fracture 4285.00 4312.00 0
2017-07-20 Perforation 4271.00 4272.00 21
2017-06-29 Multi-Stage Fracture 5605.50 5605.60 0
2017-07-20 Perforation 4258.00 4259.00 21
2017-07-20 Perforation 4245.00 4246.00 21
2017-07-20 Multi-Stage Fracture 4245.00 4272.00 0
2017-07-20 Perforation 4231.00 4232.00 21
2017-07-20 Perforation 4218.00 4219.00 21
2017-07-20 Perforation 4205.00 4206.00 21
2017-07-20 Multi-Stage Fracture 4205.00 4232.00 0
2017-07-21 Perforation 4191.00 4192.00 21
2017-07-21 Perforation 4178.00 4179.00 21
2017-07-21 Perforation 4165.00 4166.00 21
2017-06-29 Multi-Stage Fracture 5564.00 5564.10 0
2017-07-21 Multi-Stage Fracture 4165.00 4192.00 0
2017-07-21 Perforation 4151.00 4152.00 21
2017-07-21 Perforation 4138.00 4139.00 21
2017-07-21 Perforation 4125.00 4126.00 21
2017-07-21 Multi-Stage Fracture 4125.00 4152.00 0
2017-07-21 Perforation 4111.00 4112.00 21
2017-07-21 Perforation 4098.00 4099.00 21
2017-07-21 Perforation 4085.00 4086.00 21
2017-07-21 Multi-Stage Fracture 4085.00 4112.00 0
2017-07-21 Perforation 4071.00 4072.00 21
2017-06-29 Multi-Stage Fracture 5522.60 5522.70 0
2017-07-21 Perforation 4058.00 4059.00 21
2017-07-21 Perforation 4045.00 4046.00 21
2017-07-22 Multi-Stage Fracture 4045.00 4072.00 0
2017-07-22 Perforation 4031.00 4032.00 21
2017-07-22 Perforation 4018.00 4019.00 21
2017-07-22 Perforation 4005.00 4006.00 21
2017-07-22 Multi-Stage Fracture 4005.00 4032.00 0
2017-07-22 Perforation 3991.00 3992.00 21
2017-07-22 Perforation 3978.00 3979.00 21
2017-07-22 Perforation 3965.00 3966.00 21
2017-07-04 Perforation 5501.00 5502.00 20
2017-07-22 Multi-Stage Fracture 3965.00 3992.00 0
2017-07-22 Perforation 3951.00 3952.00 21
2017-07-22 Perforation 3938.00 3939.00 21
2017-07-22 Perforation 3925.00 3926.00 21
2017-07-23 Multi-Stage Fracture 3925.00 3952.00 0
2017-07-23 Perforation 3911.00 3912.00 21
2017-07-23 Perforation 3898.00 3899.00 21
2017-07-23 Perforation 3885.00 3886.00 21
2017-07-23 Multi-Stage Fracture 3885.00 3912.00 0
2017-07-23 Perforation 3871.00 3872.00 21
2017-07-04 Perforation 5495.00 5496.00 20
2017-07-23 Perforation 3858.00 3859.00 21
2017-07-23 Perforation 3845.00 3846.00 21
2017-07-23 Multi-Stage Fracture 3845.00 3872.00 0
2017-07-23 Perforation 3831.00 3832.00 21
2017-07-23 Perforation 3818.00 3819.00 21
2017-07-23 Perforation 3805.00 3806.00 21
2017-07-23 Multi-Stage Fracture 3805.00 3832.00 0
2017-07-23 Perforation 3791.00 3792.00 21
2017-07-23 Perforation 3778.00 3779.00 21
2017-07-23 Perforation 3765.00 3766.00 21
2017-07-07 Multi-Stage Fracture 5495.00 5502.00 0
2017-07-24 Multi-Stage Fracture 3765.00 3792.00 0
2017-07-24 Perforation 3751.00 3752.00 21
2017-07-24 Perforation 3738.00 3739.00 21
2017-07-24 Perforation 3725.00 3726.00 21
2017-07-24 Multi-Stage Fracture 3725.00 3752.00 0
2017-07-24 Perforation 3711.00 3712.00 21
2017-07-24 Perforation 3698.00 3699.00 21
2017-07-24 Perforation 3685.00 3686.00 21
2017-07-24 Multi-Stage Fracture 3685.00 3712.00 0
2017-07-25 Perforation 3670.00 3671.00 21
2017-06-28 Multi-Stage Fracture 6101.90 6102.00 0
2017-07-07 Perforation 5461.00 5462.00 21
2017-07-25 Perforation 3657.00 3658.00 21
2017-07-25 Perforation 3645.00 3646.00 21
2017-07-25 Multi-Stage Fracture 3645.00 3671.00 0
2017-07-25 Perforation 3631.00 3632.00 21
2017-07-25 Perforation 3618.00 3619.00 21
2017-07-25 Perforation 3605.00 3606.00 21
2017-07-25 Multi-Stage Fracture 3605.00 3632.00 0
2017-07-25 Perforation 3591.00 3592.00 21
2017-07-25 Perforation 3578.00 3579.00 21
2017-07-25 Perforation 3565.00 3566.00 21
2017-07-07 Perforation 5455.00 5456.00 21
2017-07-26 Multi-Stage Fracture 3565.00 3592.00 0
2017-07-26 Perforation 3551.00 3552.00 21
2017-07-26 Perforation 3538.00 3539.00 21
2017-07-26 Perforation 3525.00 3526.00 21
2017-07-26 Multi-Stage Fracture 3525.00 3552.00 0
2017-07-26 Perforation 3511.00 3512.00 21
2017-07-26 Perforation 3498.00 3499.00 21
2017-07-26 Perforation 3485.00 3486.00 21
2017-07-26 Multi-Stage Fracture 3485.00 3512.00 0
2017-07-26 Perforation 3471.00 3472.00 21
2017-07-07 Multi-Stage Fracture 5455.00 5462.00 0
2017-07-26 Perforation 3458.00 3459.00 21
2017-07-26 Perforation 3445.00 3446.00 21
2017-07-27 Multi-Stage Fracture 3445.00 3472.00 0
2017-07-27 Perforation 3431.00 3432.00 21
2017-07-27 Perforation 3418.00 3419.00 21
2017-07-27 Perforation 3405.00 3406.00 21
2017-07-27 Multi-Stage Fracture 3405.00 3432.00 0
2017-07-27 Perforation 3391.00 3392.00 21
2017-07-27 Perforation 3378.00 3379.00 21
2017-07-27 Perforation 3365.00 3366.00 21
2017-07-08 Perforation 5431.00 5432.00 21
2017-07-27 Multi-Stage Fracture 3365.00 3392.00 0
2017-07-27 Perforation 3351.00 3352.00 21
2017-07-27 Perforation 3338.00 3339.00 21
2017-07-27 Perforation 3325.00 3326.00 21
2017-07-28 Multi-Stage Fracture 3325.00 3352.00 0
2017-07-28 Perforation 3311.00 3312.00 21
2017-07-28 Perforation 3298.00 3299.00 21
2017-07-28 Perforation 3285.00 3286.00 21
2017-07-28 Multi-Stage Fracture 3285.00 3312.00 0
2017-07-08 Perforation 5418.00 5419.00 21
2017-07-08 Perforation 5405.00 5406.00 21
2017-07-08 Multi-Stage Fracture 5405.00 5432.00 0
2017-07-08 Perforation 5391.00 5392.00 21
2017-07-08 Perforation 5378.00 5379.00 21
2017-07-08 Perforation 5365.00 5366.00 21
2017-06-28 Multi-Stage Fracture 6060.40 6060.50 0
2017-07-08 Multi-Stage Fracture 5365.00 5392.00 0
2017-07-08 Perforation 5351.00 5352.00 20
2017-07-08 Perforation 5338.00 5339.00 20
2017-07-08 Perforation 5325.00 5326.00 20
2017-07-08 Multi-Stage Fracture 5325.00 5352.00 0
2017-07-09 Perforation 5311.00 5312.00 21
2017-07-09 Perforation 5299.00 5300.00 21
2017-07-09 Perforation 5286.00 5287.00 21
2017-07-09 Multi-Stage Fracture 5286.00 5312.00 0
2017-07-09 Perforation 5271.00 5272.00 21
2017-06-28 Multi-Stage Fracture 6019.00 6019.10 0
2017-07-09 Perforation 5258.00 5259.00 21
2017-07-09 Perforation 5245.00 5246.00 21
2017-07-09 Multi-Stage Fracture 5245.00 5272.00 0
2017-07-10 Perforation 5231.00 5232.00 21
2017-07-10 Perforation 5218.00 5219.00 21
2017-07-10 Perforation 5205.00 5206.00 21
2017-07-10 Multi-Stage Fracture 5205.00 5232.00 0
2017-07-10 Perforation 5191.00 5192.00 21
2017-07-10 Perforation 5178.00 5179.00 21
2017-07-10 Perforation 5165.00 5166.00 21
2017-06-28 Multi-Stage Fracture 5978.20 5978.30 0
2017-07-10 Multi-Stage Fracture 5165.00 5192.00 0
2017-07-11 Perforation 5151.00 5152.00 21
2017-07-11 Perforation 5138.00 5139.00 21
2017-07-11 Perforation 5125.00 5126.00 21
2017-07-11 Multi-Stage Fracture 5125.00 5152.00 0
2017-07-11 Perforation 5111.00 5112.00 21
2017-07-11 Perforation 5098.00 5099.00 21
2017-07-11 Perforation 5085.00 5086.00 21
2017-07-12 Multi-Stage Fracture 5085.00 5112.00 0
2017-07-12 Perforation 5070.00 5071.00 21
2017-06-28 Multi-Stage Fracture 5936.90 5937.00 0
2017-07-12 Perforation 5057.00 5058.00 21
2017-07-12 Perforation 5045.00 5046.00 21
2017-07-12 Multi-Stage Fracture 5045.00 5071.00 0
2017-07-12 Perforation 5031.00 5032.00 21
2017-07-12 Perforation 5018.00 5019.00 21
2017-07-12 Perforation 5005.00 5006.00 21
2017-07-13 Multi-Stage Fracture 5005.00 5032.00 0
2017-07-13 Perforation 4991.00 4992.00 21
2017-07-13 Perforation 4978.00 4979.00 21
2017-07-13 Perforation 4966.00 4967.00 21
2017-06-28 Multi-Stage Fracture 5895.40 5895.50 0
2017-07-13 Multi-Stage Fracture 4966.00 4992.00 0
2017-07-13 Perforation 4951.00 4952.00 21
2017-07-13 Perforation 4938.00 4939.00 21
2017-07-13 Perforation 4925.00 4926.00 21
2017-07-13 Multi-Stage Fracture 4925.00 4952.00 0
2017-07-14 Perforation 4911.00 4912.00 21
2017-07-14 Perforation 4898.00 4899.00 21
2017-07-14 Perforation 4885.00 4886.00 21
2017-07-14 Multi-Stage Fracture 4885.00 4912.00 0
2017-07-14 Perforation 4871.00 4872.00 21
2017-06-28 Multi-Stage Fracture 5854.00 5854.10 0
2017-07-14 Perforation 4858.00 4859.00 21
2017-07-14 Perforation 4845.00 4846.00 21
2017-07-14 Multi-Stage Fracture 4845.00 4872.00 0
2017-07-14 Perforation 4831.00 4832.00 21
2017-07-14 Perforation 4818.00 4819.00 21
2017-07-14 Perforation 4805.00 4806.00 21
2017-07-15 Multi-Stage Fracture 4805.00 4832.00 0
2017-07-15 Perforation 4791.00 4792.00 21
2017-07-15 Perforation 4778.00 4779.00 21
2017-07-15 Perforation 4765.00 4766.00 21
2017-06-28 Multi-Stage Fracture 5812.60 5812.70 0
2017-07-15 Multi-Stage Fracture 4765.00 4792.00 0
2017-07-15 Perforation 4751.00 4752.00 21
2017-07-15 Perforation 4738.00 4739.00 21
2017-07-15 Perforation 4725.00 4726.00 21
2017-07-15 Multi-Stage Fracture 4725.00 4752.00 0
2017-07-15 Perforation 4711.00 4712.00 21
2017-07-15 Perforation 4698.00 4699.00 21
2017-07-15 Perforation 4685.00 4686.00 21
2017-07-16 Multi-Stage Fracture 4685.00 4712.00 0
2017-07-16 Perforation 4671.00 4672.00 21

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-06-28 2017-07-28 3,147 43,570 N/A
2 2017-07-26 2017-07-28 3,147 0 N/A
3 2017-06-28 2017-06-29 3,147 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 85.2915 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 14.0202 N/A
15% HCl Calfrac Acid Hydrochloric acid 7647-01-0 100 0.3301 N/A
Water 7732-18-5 100 0.3301 N/A
DWP-944 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0117 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0117 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.0418 N/A
CI-9100G Calfrac Corrosion Inhibitor Alcohols. C12-15. ethoxylated 68131-39-5 100 0.0001 N/A
Cinnamaldehyde 104-55-2 100 0.0001 N/A
Dipropylene glycol monomethyl ether 34590-94-8 100 0.0001 N/A
Ethylene Glycol 107-21-1 100 0.0001 N/A
Formic acid 64-18-6 100 0.0001 N/A
Isopropyl alcohol 67-63-0 100 0.0001 N/A
Tar bases. quinoline derivs. 68513-87-1 100 0.0001 N/A
Tar bases. quinolone derivs.. benzyl chloride-quarternized 72480-70-7 100 0.0001 N/A
DWP-959 Calfrac Demulsifier Methanol 67-56-1 100 0.0776 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0776 N/A
CalVisc Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0878 N/A
2 50/140 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 1.405 N/A
3 Nitrogen Calfrac Energizing Fluid Nitrogen 7727-37-9 100 0.0099 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-04-04 2017-06-14 Surface Water - River 45935

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 1693 0.0 0.0 0.0
2018 6469 0.0 0.0 0.0
2019 8305 0.0 0.0 0.0
2020 1535 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-09-29 Lost Circulation 36.00 188.00
2017-07-28 No Incident Encountered 0.00 0.00

For data sources see[10]

References