X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0656053413000

Well Details

Well ID: 0656053413000
Loading map...
Location: 00/13-34-065-05W6/0
Location Alias: 00/13-34-65-05 W6M
Location Alias 2: 00/13-34-065-05 W6/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 6
Range: 05
Section: 34
County/Municipality: Municipal District of Greenview No. 16
Well Name: PARA ET AL HZ KARR 13-34-65-5
Operator Name: Paramount Resources Ltd.
License Number: 0425517
License Date: 2010-11-04
License Status: Amended
Spud Date: 2010-11-10
Final Drill Date: 2010-12-23
Well Total Depth: 4570.00 m
Surface Hole Latitude: 54.687672
Surface Hole Longitude: -118.680325

For data sources see[1][2]

Well History

Date Event
2010-11-04 Obtained License
2010-11-15 Surface Casing Operation Performed
2010-11-24 Well Log Performed
2010-11-27 Direction Drilling Operation Performed - Horizontal
2010-12-06 Well Log Performed
2010-12-07 Well Log Performed
2010-12-08 Intermediate Casing Operation Performed
2010-12-23 Finished Drilling
2010-12-23 Well Log Performed
2010-12-23 Well Mode changed to Drilled and Cased
2010-12-24 Well Log Performed
2010-12-27 Liner Casing Operation Performed
2010-12-29 Rig Released
2011-01-23 Perforation Treatment Performed - Multi-Stage Fracture
2011-01-24 Perforation Treatment Performed - Multi-Stage Fracture
2011-01-25 Perforation Treatment Performed - Multi-Stage Fracture
2011-04-30 Well Log Performed
2011-06-17 Well Began Production
2011-06-17 Well Fluid changed to Crude Oil
2011-06-17 Well Mode changed to Flowing
2014-01-31 Well Fluid changed to Crude Oil
2014-01-31 Well Mode changed to Suspended
2014-10-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-10-31 Plug Back Performed
2014-10-31 Well Fluid changed to Crude Oil
2014-10-31 Well Mode changed to Abandoned Zone
2014-11-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-11-03 Plug Back Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-11-27 2823.20 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-01-23 Multi-Stage Fracture 4541.70 4542.50 0
2011-01-25 Multi-Stage Fracture 3960.40 3961.20 0
2011-01-25 Multi-Stage Fracture 3885.70 3886.50 0
2011-01-25 Multi-Stage Fracture 3822.80 3823.60 0
2011-01-25 Multi-Stage Fracture 3760.50 3761.30 0
2011-01-25 Multi-Stage Fracture 3697.40 3698.20 0
2011-01-25 Multi-Stage Fracture 3646.00 3646.80 0
2011-01-25 Multi-Stage Fracture 3571.60 3572.40 0
2011-01-25 Multi-Stage Fracture 3508.60 3509.40 0
2011-01-25 Multi-Stage Fracture 3319.60 3320.40 0
2011-01-25 Multi-Stage Fracture 3257.10 3257.90 0
2011-01-23 Multi-Stage Fracture 4461.30 4462.10 0
2011-01-25 Multi-Stage Fracture 3194.00 3194.80 0
2014-10-31 Packing Device Capped w/Cement 2917.00 2925.00 0
2014-11-03 Packing Device Capped w/Cement 2865.00 2873.00 0
2011-01-24 Multi-Stage Fracture 4400.00 4400.80 0
2011-01-24 Multi-Stage Fracture 4326.00 4326.80 0
2011-01-24 Multi-Stage Fracture 4274.50 4275.30 0
2011-01-24 Multi-Stage Fracture 4211.80 4212.60 0
2011-01-24 Multi-Stage Fracture 4149.10 4149.90 0
2011-01-24 Multi-Stage Fracture 4086.30 4087.10 0
2011-01-24 Multi-Stage Fracture 4023.20 4024.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 2401 0.0 0.0 0.0
2012 1840 0.0 0.0 0.0
2013 1368 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-07-08 No Incident Encountered 0.00 0.00
2014-11-03 No Incident Encountered 0.00 0.00

For data sources see[7]

References