X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0656053301000

Well Details

Well ID: 0656053301000
Loading map...
Location: 00/01-33-065-05W6/0
Location Alias: 00/01-33-65-05 W6M
Location Alias 2: 00/01-33-065-05 W6/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 6
Range: 05
Section: 33
County/Municipality: Municipal District of Greenview No. 16
Well Name: PARA HZ KARR 1-33-65-5
Operator Name: Paramount Resources Ltd.
License Number: 0481439
License Date: 2016-11-14
License Status: Issued
Spud Date: 2017-01-27
Final Drill Date: 2017-03-07
Well Total Depth: 5628.00 m
Surface Hole Latitude: 54.687672
Surface Hole Longitude: -118.680442

For data sources see[1][2]

Well History

Date Event
2016-11-14 Obtained License
2017-01-27 Surface Casing Operation Performed
2017-02-01 Direction Drilling Operation Performed - Deviate
2017-02-10 Intermediate Casing Operation Performed
2017-02-25 Well Log Performed
2017-02-26 Direction Drilling Operation Performed - Horizontal
2017-02-26 Well Log Performed
2017-03-07 Finished Drilling
2017-03-07 Well Log Performed
2017-03-07 Well Mode changed to Drilled and Cased
2017-03-14 Production Casing Operation Performed
2017-03-14 Rig Released
2017-04-24 Well Log Performed
2017-05-01 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-02 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-04 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-05 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-06 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-07 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-08 Perforation Treatment Performed - Multi-Stage Fracture
2017-05-23 Well Began Production
2017-05-23 Well Fluid changed to Gas
2017-05-23 Well Mode changed to Flowing
2018-03-25 Well Fluid changed to Gas
2018-03-25 Well Mode changed to Pumping
2019-07-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2020-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-02-24 Fox Drilling Inc. 4 N/A Drill To LD
2017-01-27 Fox Drilling Inc. 4 N/A Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-02-01 1251.40 Deviate (5 - 79 degrees)
2017-02-26 3025.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-05-01 Multi-Stage Fracture 5555.00 5555.10 0
2017-05-02 Multi-Stage Fracture 5169.40 5169.50 0
2017-05-02 Multi-Stage Fracture 5128.00 5128.10 0
2017-05-02 Multi-Stage Fracture 5086.60 5086.70 0
2017-05-02 Multi-Stage Fracture 5045.00 5045.10 0
2017-05-02 Multi-Stage Fracture 5003.50 5003.60 0
2017-05-02 Multi-Stage Fracture 4962.00 4962.10 0
2017-05-02 Multi-Stage Fracture 4920.90 4921.00 0
2017-05-04 Multi-Stage Fracture 4878.10 4878.20 0
2017-05-04 Multi-Stage Fracture 4835.40 4835.50 0
2017-05-04 Multi-Stage Fracture 4792.80 4792.90 0
2017-05-01 Multi-Stage Fracture 5500.50 5500.60 0
2017-05-04 Multi-Stage Fracture 4750.10 4750.20 0
2017-05-04 Multi-Stage Fracture 4707.40 4707.50 0
2017-05-04 Multi-Stage Fracture 4664.90 4665.00 0
2017-05-04 Multi-Stage Fracture 4622.40 4662.50 0
2017-05-04 Multi-Stage Fracture 4579.90 4580.00 0
2017-05-04 Multi-Stage Fracture 4537.20 4537.30 0
2017-05-05 Multi-Stage Fracture 4494.60 4494.70 0
2017-05-05 Multi-Stage Fracture 4452.10 4452.20 0
2017-05-05 Multi-Stage Fracture 4409.30 4409.40 0
2017-05-05 Multi-Stage Fracture 4366.60 4366.70 0
2017-05-01 Multi-Stage Fracture 5459.10 5459.20 0
2017-05-05 Multi-Stage Fracture 4323.90 4324.00 0
2017-05-05 Multi-Stage Fracture 4281.20 4281.30 0
2017-05-05 Multi-Stage Fracture 4238.50 4238.60 0
2017-05-05 Multi-Stage Fracture 4195.80 4195.90 0
2017-05-06 Multi-Stage Fracture 4153.30 4153.40 0
2017-05-06 Multi-Stage Fracture 4110.80 4110.90 0
2017-05-06 Multi-Stage Fracture 4068.20 4068.30 0
2017-05-06 Multi-Stage Fracture 4025.50 4025.60 0
2017-05-06 Multi-Stage Fracture 3982.90 3983.00 0
2017-05-06 Multi-Stage Fracture 3940.10 3940.20 0
2017-05-02 Multi-Stage Fracture 5418.00 5418.10 0
2017-05-06 Multi-Stage Fracture 3897.50 3897.60 0
2017-05-06 Multi-Stage Fracture 3854.80 3854.90 0
2017-05-06 Multi-Stage Fracture 3812.10 3812.20 0
2017-05-07 Multi-Stage Fracture 3769.40 3769.50 0
2017-05-07 Multi-Stage Fracture 3726.60 3726.70 0
2017-05-07 Multi-Stage Fracture 3683.90 3684.00 0
2017-05-07 Multi-Stage Fracture 3641.20 3641.30 0
2017-05-07 Multi-Stage Fracture 3598.40 3598.50 0
2017-05-07 Multi-Stage Fracture 3555.70 3555.80 0
2017-05-07 Multi-Stage Fracture 3513.00 3513.10 0
2017-05-02 Multi-Stage Fracture 5376.40 5376.50 0
2017-05-07 Multi-Stage Fracture 3470.40 3470.50 0
2017-05-07 Multi-Stage Fracture 3427.70 3427.80 0
2017-05-07 Multi-Stage Fracture 3385.30 3385.40 0
2017-05-08 Multi-Stage Fracture 3342.60 3342.70 0
2017-05-08 Multi-Stage Fracture 3299.90 3300.00 0
2017-05-08 Multi-Stage Fracture 3257.20 3257.30 0
2017-05-08 Multi-Stage Fracture 3214.50 3214.60 0
2017-05-08 Multi-Stage Fracture 3171.90 3172.00 0
2017-05-08 Multi-Stage Fracture 3129.20 3129.30 0
2017-05-08 Multi-Stage Fracture 3086.50 3086.60 0
2017-05-02 Multi-Stage Fracture 5334.90 5335.00 0
2017-05-08 Multi-Stage Fracture 3043.80 3043.90 0
2017-05-08 Multi-Stage Fracture 3001.10 3001.20 0
2017-05-08 Multi-Stage Fracture 2958.40 2958.50 0
2019-07-27 Acid Treatment 2958.40 5555.10 0
2020-01-23 Acid Treatment 2958.40 5555.10 0
2017-05-02 Multi-Stage Fracture 5293.40 5293.50 0
2017-05-02 Multi-Stage Fracture 5251.90 5252.00 0
2017-05-02 Multi-Stage Fracture 5210.70 5210.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-05-01 2017-05-08 2,970 38,011 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 85.4947 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 14.0334 N/A
15% HCl Calfrac Acid Hydrochloric acid 7647-01-0 100 0.3021 N/A
Water 7732-18-5 100 0.3021 N/A
DWP-944 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.01 N/A
Non-Hazardous Ingredients Trade Secret 100 0.01 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.0724 N/A
CI-9100G Calfrac Corrosion Inhibitor Alcohols. C12-15. ethoxylated 68131-39-5 100 0.0009 N/A
Cinnamaldehyde 104-55-2 100 0.0009 N/A
Dipropylene glycol monomethyl ether 34590-94-8 100 0.0009 N/A
Ethylene Glycol 107-21-1 100 0.0009 N/A
Formic acid 64-18-6 100 0.0009 N/A
Isopropyl alcohol 67-63-0 100 0.0009 N/A
Tar bases. quinoline derivs. 68513-87-1 100 0.0009 N/A
Tar bases. quinolone derivs.. benzyl chloride-quarternized 72480-70-7 100 0.0009 N/A
CalVisc Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0861 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-09-21 2016-10-12 Surface Water - River 38078

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 4505 0.0 0.0 0.0
2018 6761 0.0 0.0 0.0
2019 7610 0.0 0.0 0.0
2020 2015 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-03-14 No Incident Encountered 0.00 0.00
2017-05-08 No Incident Encountered 0.00 0.00
2019-08-03 No Incident Encountered 0.00 0.00
2020-01-26 No Incident Encountered 0.00 0.00

For data sources see[10]

References