If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0655240412020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.595252,"lon":-117.544374,"icon":""}]} |
| Location: 02/12-04-065-24W5/0 | |
| Location Alias: 02/12-04-65-24 W5M | |
| Location Alias 2: 02/12-04-065-24 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 065 | |
| Meridian: 5 | |
| Range: 24 | |
| Section: 04 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: ACL 102 HZ ANTEN 12-4-65-24 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0474072 | |
| License Date: 2015-01-06 | |
| License Status: Issued | |
| Spud Date: 2015-02-04 | |
| Final Drill Date: 2015-02-21 | |
| Well Total Depth: 4540.00 m | |
| Surface Hole Latitude: 54.595252 | |
| Surface Hole Longitude: -117.544374 |
| Date | Event |
|---|---|
| 2015-01-06 | Obtained License |
| 2015-02-06 | Surface Casing Operation Performed |
| 2015-02-08 | Direction Drilling Operation Performed - Deviate |
| 2015-02-13 | Intermediate Casing Operation Performed |
| 2015-02-15 | Direction Drilling Operation Performed - Horizontal |
| 2015-02-21 | Finished Drilling |
| 2015-02-21 | Well Log Performed |
| 2015-02-21 | Well Mode changed to Drilled and Cased |
| 2015-02-24 | Liner Casing Operation Performed |
| 2015-02-24 | Perforation Treatment Performed - Open-Hole Completion |
| 2015-02-25 | Rig Released |
| 2015-03-02 | Well Log Performed |
| 2015-03-08 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-03-10 | Well Began Production |
| 2015-03-10 | Well Fluid changed to Crude Oil |
| 2015-03-10 | Well Mode changed to Flowing |
| 2015-12-15 | Well Fluid changed to Crude Oil |
| 2015-12-15 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2015-02-04 | Horizon Drilling Inc. | 37 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2015-02-08 | 702.10 | Deviate (5 - 79 degrees) |
| 2015-02-15 | 2478.20 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2015-02-24 | Open Hole/Barefoot Completion | 4521.00 | 4540.00 | 0 |
| 2015-03-08 | Multi-Stage Fracture | 3077.50 | 3077.60 | 0 |
| 2015-03-08 | Multi-Stage Fracture | 3173.10 | 3173.20 | 0 |
| 2015-03-08 | Multi-Stage Fracture | 3255.20 | 3255.30 | 0 |
| 2015-03-08 | Multi-Stage Fracture | 3323.90 | 3324.00 | 0 |
| 2015-03-08 | Multi-Stage Fracture | 3419.30 | 3419.40 | 0 |
| 2015-03-08 | Multi-Stage Fracture | 3501.30 | 3501.40 | 0 |
| 2015-03-08 | Multi-Stage Fracture | 3556.50 | 3556.60 | 0 |
| 2015-03-08 | Multi-Stage Fracture | 3638.60 | 3638.70 | 0 |
| 2015-03-08 | Multi-Stage Fracture | 3720.70 | 3720.80 | 0 |
| 2015-03-08 | Multi-Stage Fracture | 3802.40 | 3802.50 | 0 |
| 2015-03-08 | Multi-Stage Fracture | 2503.30 | 2503.40 | 0 |
| 2015-03-08 | Multi-Stage Fracture | 3884.50 | 3884.60 | 0 |
| 2015-03-08 | Multi-Stage Fracture | 3939.90 | 3940.00 | 0 |
| 2015-03-08 | Multi-Stage Fracture | 4008.60 | 4008.70 | 0 |
| 2015-03-08 | Multi-Stage Fracture | 4077.30 | 4077.40 | 0 |
| 2015-03-08 | Multi-Stage Fracture | 4132.70 | 4132.80 | 0 |
| 2015-03-08 | Multi-Stage Fracture | 4241.50 | 4241.60 | 0 |
| 2015-03-08 | Multi-Stage Fracture | 4310.00 | 4310.10 | 0 |
| 2015-03-08 | Multi-Stage Fracture | 4391.80 | 4391.90 | 0 |
| 2015-03-08 | Multi-Stage Fracture | 4490.40 | 4490.50 | 0 |
| 2015-03-08 | Multi-Stage Fracture | 2558.60 | 2558.70 | 0 |
| 2015-03-08 | Multi-Stage Fracture | 2640.10 | 2640.20 | 0 |
| 2015-03-08 | Multi-Stage Fracture | 2722.10 | 2722.20 | 0 |
| 2015-03-08 | Multi-Stage Fracture | 2790.50 | 2790.60 | 0 |
| 2015-03-08 | Multi-Stage Fracture | 2858.00 | 2858.10 | 0 |
| 2015-03-08 | Multi-Stage Fracture | 2940.10 | 2940.20 | 0 |
| 2015-03-08 | Multi-Stage Fracture | 3022.20 | 3022.30 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2015-03-08 | 2015-03-08 | 2,190 | 644 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 48.7751 | N/A | |||
| 20/40 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 21.1926 | N/A | ||
| DWP-317 | Calfrac | Activator | Alkyl Amine | 8458 | 100 | 0.2236 | N/A | |
| Non-Hazardous Ingredients | Trade Secret | 100 | 0.2251 | N/A | ||||
| DWP-981 | Calfrac | Breaker | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0338 | N/A | |
| Nitrogen | Calfrac | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 36.319 | N/A | |
| DWP-315 | Calfrac | Foamer | 1.2.3-Propanetriol | 56-81-5 | 100 | 0.1494 | N/A | |
| 1.2-Ethanediol | 107-21-1 | 100 | 0.1295 | N/A | ||||
| 2.4-Pentanediol. 2-methyl- | 107-41-5 | 100 | 0.1367 | N/A | ||||
| Alcohols. C8-C10 ethoxylated | 71060-57-6 | 100 | 0.2076 | N/A | ||||
| Amides. coco. N.N-bis(hydroxyethyl) | 68603-42-9 | 100 | 0.1295 | N/A | ||||
| Ammonium Alkyl Ether Sulfate | 68891-29-2 | 100 | 0.129 | N/A | ||||
| Ethanol. 2.2'-iminobis- | 111-42-2 | 100 | 0.1494 | N/A | ||||
| Non-Hazardous Ingredients | Trade Secret | 100 | 0.1295 | N/A | ||||
| DWP-321 | Calfrac | Gelling Agent | Amides. coco. N.N-bis(hydroxyethyl) | 68603-42-9 | 100 | 0.5485 | N/A | |
| Non-Hazardous Ingredients | Trade Secret | 100 | 0.4726 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2015-02-16 | 2015-02-18 | Groundwater - Non-saline less than or equal to 150m deep | 616 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2015 | 1086 | 0.0 | 0.0 | 0.0 |
| 2016 | 8595 | 0.0 | 0.0 | 0.0 |
| 2017 | 7880 | 0.0 | 0.0 | 0.0 |
| 2018 | 8013 | 0.0 | 0.0 | 0.0 |
| 2019 | 7494 | 0.0 | 0.0 | 0.0 |
| 2020 | 2044 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2015-02-25 | No Incident Encountered | 0.00 | 0.00 |
| 2015-03-15 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]