X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0655212103000

Well Details

Well ID: 0655212103000
Loading map...
Location: 00/03-21-065-21W5/0
Location Alias: 00/03-21-65-21 W5M
Location Alias 2: 00/03-21-065-21 W5/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 5
Range: 21
Section: 21
County/Municipality: Municipal District of Greenview No. 16
Well Name: PARA ET AL GIROUX LAKE 3-21-65-21
Operator Name: Sequoia Resources Corp.
License Number: 0211804
License Date: 1998-01-12
License Status: Suspension
Spud Date: 1998-05-28
Final Drill Date: 1998-06-11
Well Total Depth: 1955.00 m
Surface Hole Latitude: 54.634103
Surface Hole Longitude: -117.113029

For data sources see[1][2]

Well History

Date Event
1998-01-12 Obtained License
1998-05-29 Surface Casing Operation Performed
1998-05-31 Direction Drilling Operation Performed - Deviate
1998-06-09 Well Log Performed
1998-06-11 Finished Drilling
1998-06-11 Well Log Performed
1998-06-11 Well Mode changed to Drilled and Cased
1998-06-14 Production Casing Operation Performed
1998-06-14 Rig Released
1998-07-06 Well Log Performed
1998-07-08 Well Log Performed
1998-07-09 Perforation Treatment Performed - Jet Perforation
1998-07-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-07-10 Plug Back Performed
1998-07-10 Well Log Performed
1998-07-11 Perforation Treatment Performed - Jet Perforation
1998-07-11 Well Log Performed
1998-07-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-07-12 Plug Back Performed
1998-07-12 Well Log Performed
1998-07-13 Perforation Treatment Performed - Jet Perforation
1998-07-13 Well Log Performed
1998-07-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-07-14 Plug Back Performed
1998-07-14 Well Log Performed
1998-07-15 Perforation Treatment Performed - Jet Perforation
1998-07-15 Well Log Performed
1998-07-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-07-16 Plug Back Performed
1998-07-16 Well Log Performed
1998-07-17 Perforation Treatment Performed - Jet Perforation
1998-07-17 Well Log Performed
1998-07-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-07-18 Plug Back Performed
1998-07-18 Well Log Performed
1998-07-19 Perforation Treatment Performed - Jet Perforation
1998-07-19 Well Log Performed
1998-07-22 Well Began Production
1998-07-22 Well Fluid changed to Crude Oil
1998-07-22 Well Mode changed to Flowing
1999-12-09 Well Log Performed
1999-12-13 Perforation Treatment Performed - Chemical Squeeze
2000-10-24 Well Fluid changed to Crude Oil
2000-10-24 Well Mode changed to Pumping
2006-09-01 Well Fluid changed to Crude Oil
2006-09-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1998-05-31 530.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-07-09 Perforation 1900.00 1906.00 17
1998-07-17 Perforation 1485.00 1486.00 17
1998-07-18 Packing Device Capped w/Cement 1467.00 1475.00 0
1998-07-19 Perforation 1467.50 1470.00 17
1999-12-13 Chemical Squeeze 1467.50 1470.00 0
1998-07-10 Packing Device Capped w/Cement 1882.00 1890.00 0
1998-07-11 Perforation 1794.00 1795.00 17
1998-07-12 Packing Device Capped w/Cement 1777.00 1785.00 0
1998-07-13 Perforation 1749.00 1753.00 17
1998-07-13 Perforation 1756.00 1759.00 17
1998-07-14 Packing Device Capped w/Cement 1734.00 1742.00 0
1998-07-15 Perforation 1552.00 1557.00 17
1998-07-16 Packing Device Capped w/Cement 1537.00 1545.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 2326 0.0 0.0 0.0
1999 944 0.0 0.0 0.0
2000 3883 0.0 0.0 0.0
2001 3172 0.0 0.0 0.0
2002 1257 0.0 0.0 0.0

For data sources see[6]

References