If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0655202006000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.637526,"lon":-116.991131,"icon":""}]} |
Location: 00/06-20-065-20W5/0 | |
Location Alias: 00/06-20-65-20 W5M | |
Location Alias 2: 00/06-20-065-20 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 065 | |
Meridian: 5 | |
Range: 20 | |
Section: 20 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: PAN AM GIROUX LAKE NO. 1 | |
Operator Name: BP Canada Energy Group ULC | |
License Number: 0008796 | |
License Date: 1954-11-26 | |
License Status: RecExempt | |
Spud Date: 1954-12-12 | |
Final Drill Date: 1955-03-25 | |
Well Total Depth: 3234.50 m | |
Surface Hole Latitude: 54.637526 | |
Surface Hole Longitude: -116.991131 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1954-11-26 | Obtained License |
1954-12-19 | Drill Stem Test Performed |
1954-12-20 | Drill Stem Test Performed |
1954-12-21 | Drill Stem Test Performed |
1954-12-25 | Drill Stem Test Performed |
1954-12-29 | Drill Stem Test Performed |
1954-12-30 | Drill Stem Test Performed |
1955-01-04 | Drill Stem Test Performed |
1955-01-06 | Drill Stem Test Performed |
1955-01-12 | Drill Stem Test Performed |
1955-03-06 | Drill Stem Test Performed |
1955-03-13 | Drill Stem Test Performed |
1955-03-20 | Drill Stem Test Performed |
1955-03-25 | Finished Drilling |
1955-03-25 | Well Mode changed to Drilled and Cased |
1955-03-28 | Production Casing Operation Performed |
1955-03-29 | Perforation Treatment Performed - Jet Perforation |
1955-09-16 | Perforation Treatment Performed - Bullet Perforation |
1955-09-19 | Perforation Treatment Performed - Bullet Perforation |
1955-09-26 | Perforation Treatment Performed - Cement Squeeze |
1955-09-27 | Perforation Treatment Performed - Cement Squeeze |
1955-09-27 | Perforation Treatment Performed - Jet Perforation |
1955-10-05 | Perforation Treatment Performed - Jet Perforation |
1955-10-10 | Well Began Production |
1955-10-10 | Well Fluid changed to Crude Oil |
1955-10-10 | Well Mode changed to Flowing |
1956-09-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1956-09-12 | Perforation Treatment Performed - Cement Squeeze |
1957-03-13 | Perforation Treatment Performed - Cement Plug |
1957-03-13 | Perforation Treatment Performed - Jet Perforation |
1957-03-19 | Well Fluid changed to Crude Oil |
1957-03-19 | Well Mode changed to Suspended |
1958-03-17 | Well Abandoned |
1958-03-17 | Well Fluid changed to Crude Oil |
1958-03-17 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1955-03-29 | Perforation | 3087.60 | 3102.90 | 13 |
1957-03-13 | Perforation | 3066.30 | 3066.90 | 26 |
1957-03-13 | Cement Plug | 3037.30 | 3066.90 | 0 |
1955-09-16 | Bullet Perforation | 3079.40 | 3090.70 | 13 |
1955-09-19 | Bullet Perforation | 3079.40 | 3090.70 | 13 |
1955-09-26 | Cement Squeeze | 3079.40 | 3090.70 | 0 |
1955-09-27 | Perforation | 1950.40 | 1950.70 | 20 |
1955-09-27 | Cement Squeeze | 1950.40 | 1950.70 | 0 |
1955-10-05 | Perforation | 3066.30 | 3070.60 | 13 |
1956-09-12 | Acid Treatment | 3066.30 | 3070.60 | 0 |
1956-09-12 | Cement Squeeze | 3066.30 | 3070.60 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]