X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0655131002000

Well Details

Well ID: 0655131002000
Loading map...
Location: 00/02-10-065-13W5/0
Location Alias: 00/02-10-65-13 W5M
Location Alias 2: 00/02-10-065-13 W5/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 5
Range: 13
Section: 10
County/Municipality: Big Lakes County
Well Name: 1976082 VIRG 2-10-65-13
Operator Name: Razor Energy Corp.
License Number: 0018731
License Date: 1960-02-18
License Status: Suspension
Spud Date: 1960-02-23
Final Drill Date: 1960-03-23
Well Total Depth: 2849.90 m
Surface Hole Latitude: 54.604940
Surface Hole Longitude: -115.875434

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-02-18 Obtained License
1960-03-23 Finished Drilling
1960-03-23 Well Mode changed to Drilled and Cased
1960-03-25 Production Casing Operation Performed
1960-03-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-03-27 Perforation Treatment Performed - Jet Perforation
1960-03-30 Well Began Production
1960-03-30 Well Fluid changed to Crude Oil
1960-03-30 Well Mode changed to Flowing
1962-08-14 Perforation Treatment Performed - Jet Perforation
1963-03-07 Well Fluid changed to Crude Oil
1963-03-07 Well Mode changed to Pumping
1974-09-05 Well Log Performed
1974-11-17 Perforation Treatment Performed - Cement Squeeze
1974-11-18 Perforation Treatment Performed - Cement Squeeze
1974-11-26 Perforation Treatment Performed - Jet Perforation
1974-12-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-12-04 Perforation Treatment Performed - Cement Squeeze
1975-12-09 Perforation Treatment Performed - Cement Squeeze
1979-02-01 Well Fluid changed to Crude Oil
1979-02-01 Well Mode changed to Suspended
1988-10-29 Perforation Treatment Performed - Jet Perforation
1988-11-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-05-03 Well Began Injection
1989-05-03 Well Fluid changed to Water
1989-05-03 Well Type changed to Injection
1989-10-28 Well Log Performed
1996-11-01 Well Fluid changed to Solvent
1996-11-01 Well Type changed to Injection
1999-09-09 Perforation Treatment Performed - Acid Wash - No Pressure
2015-09-01 Well Fluid changed to Water
2015-09-01 Well Type changed to Injection
2015-10-25 Well Log Performed
2015-10-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-10-27 Perforation Treatment Performed - Cement Squeeze
2015-10-27 Plug Back Performed
2015-10-27 Well Fluid changed to Water
2015-10-27 Well Mode changed to Abandoned Zone
2015-10-27 Well Type changed to Injection
2015-10-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-03-27 Perforation 2801.10 2805.40 7
1962-08-14 Perforation 2818.50 2821.50 7
1962-08-14 Perforation 2822.40 2824.30 7
1962-08-14 Perforation 2824.60 2825.80 7
1962-08-14 Perforation 2829.50 2830.70 7
1974-11-17 Cement Squeeze 2786.50 2814.20 0
1974-11-18 Cement Squeeze 2786.50 2814.20 0
1974-11-26 Perforation 2786.50 2787.70 3
1974-11-26 Perforation 2788.60 2789.80 3
1974-11-26 Perforation 2790.40 2792.00 7
1974-11-26 Perforation 2793.20 2793.80 3
1960-03-27 Acid Treatment 2801.10 2805.40 0
1974-11-26 Perforation 2815.40 2816.40 3
1974-11-26 Perforation 2818.50 2821.50 3
1974-11-26 Perforation 2822.40 2824.30 3
1974-11-26 Perforation 2824.60 2825.80 3
1974-11-26 Perforation 2826.70 2827.60 7
1974-11-26 Perforation 2829.50 2830.70 3
1974-12-01 Acid Treatment 2786.50 2830.70 0
1975-12-04 Cement Squeeze 2773.70 2813.90 0
1975-12-09 Cement Squeeze 2773.70 2813.90 0
1988-10-29 Perforation 2786.50 2792.90 7
1962-08-14 Perforation 2786.50 2787.70 7
1988-10-29 Perforation 2792.90 2793.80 7
1988-10-29 Perforation 2795.60 2798.70 7
1988-10-29 Perforation 2801.00 2813.00 7
1988-11-03 Acid Treatment 2786.50 2830.70 0
1999-09-09 Acid Wash 2786.50 2830.70 0
2015-10-27 Cement Squeeze 2786.50 2830.70 0
2015-10-27 Packing Device Capped w/Cement 2683.00 2685.00 0
2015-10-28 Packing Device Capped w/Cement 2675.00 2683.00 0
1962-08-14 Perforation 2788.60 2789.80 7
1962-08-14 Perforation 2793.20 2793.80 7
1962-08-14 Perforation 2795.60 2798.70 7
1962-08-14 Perforation 2804.50 2806.90 7
1962-08-14 Perforation 2807.50 2813.00 7
1962-08-14 Perforation 2815.40 2816.40 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 2640 0.0 0.0 0.0
1968 2470 0.0 0.0 0.0
1969 7989 0.0 0.0 0.0
1970 7706 0.0 0.0 0.0
1971 6058 0.0 0.0 0.0
1972 6789 0.0 0.0 0.0
1973 8088 0.0 0.0 0.0
1974 5417 0.0 0.0 0.0
1975 2091 0.0 0.0 0.0
1976 656 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1988-11-09 No Incident Encountered 0.00 0.00
2015-10-28 No Incident Encountered 0.00 0.00

For data sources see[6]

References