X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0655130710000

Well Details

Well ID: 0655130710000
Loading map...
Location: 00/10-07-065-13W5/0
Location Alias: 00/10-07-65-13 W5M
Location Alias 2: 00/10-07-065-13 W5/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 5
Range: 13
Section: 07
County/Municipality: Big Lakes County
Well Name: 1976082 VIRG 10-7-65-13
Operator Name: Razor Energy Corp.
License Number: 0021112
License Date: 1961-07-27
License Status: RecCertified
Spud Date: 1961-07-31
Final Drill Date: 1961-08-31
Well Total Depth: 2880.40 m
Surface Hole Latitude: 54.611960
Surface Hole Longitude: -115.951419

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-07-27 Obtained License
1961-08-31 Finished Drilling
1961-08-31 Well Mode changed to Drilled and Cased
1961-09-01 Production Casing Operation Performed
1961-09-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-09-02 Perforation Treatment Performed - Jet Perforation
1961-09-14 Well Began Production
1961-09-14 Well Fluid changed to Crude Oil
1961-09-14 Well Mode changed to Flowing
1962-04-02 Well Fluid changed to Crude Oil
1962-04-02 Well Mode changed to Pumping
1979-08-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-09-01 Perforation Treatment Performed - Jet Perforation
1979-09-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-06-19 Well Fluid changed to Crude Oil
1990-06-19 Well Mode changed to Suspended
1999-06-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-06-18 Plug Back Performed
1999-06-20 Perforation Treatment Performed - Jet Perforation
1999-06-21 Perforation Treatment Performed - Remedial Casing
1999-06-26 Well Abandoned
1999-06-26 Well Fluid changed to Crude Oil
1999-06-26 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-09-02 Perforation 2827.90 2829.80 7
1979-09-04 Acid Treatment 2857.50 2864.00 0
1999-06-18 Packing Device Capped w/Cement 2804.00 2812.00 0
1999-06-20 Perforation 350.50 351.00 13
1999-06-21 Remedial Casing Cementing 350.50 351.00 0
1961-09-02 Perforation 2831.00 2833.10 7
1961-09-02 Perforation 2833.70 2834.60 7
1961-09-02 Perforation 2837.70 2838.30 7
1961-09-02 Acid Treatment 2827.90 2838.30 0
1979-08-18 Acid Treatment 2827.90 2838.30 0
1979-09-01 Perforation 2857.50 2858.70 7
1979-09-01 Perforation 2861.10 2862.10 7
1979-09-01 Perforation 2863.00 2864.20 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1970 4680 0.0 0.0 0.0
1971 1041 0.0 0.0 0.0
1972 696 0.0 0.0 0.0
1973 4698 0.0 0.0 0.0
1980 2038 0.0 0.0 0.0

For data sources see[5]

References