X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0655111310000

Well Details

Well ID: 0655111310000
Loading map...
Location: 00/10-13-065-11W5/0
Location Alias: 00/10-13-65-11 W5M
Location Alias 2: 00/10-13-065-11 W5/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 5
Range: 11
Section: 13
County/Municipality: Big Lakes County
Well Name: 1976082 SWANHS 10-13-65-11
Operator Name: Razor Energy Corp.
License Number: 0017221
License Date: 1959-06-10
License Status: Suspension
Spud Date: 1959-06-18
Final Drill Date: 1959-07-27
Well Total Depth: 2545.10 m
Surface Hole Latitude: 54.626862
Surface Hole Longitude: -115.522968

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-06-10 Obtained License
1959-07-18 Drill Stem Test Performed
1959-07-19 Drill Stem Test Performed
1959-07-21 Drill Stem Test Performed
1959-07-22 Drill Stem Test Performed
1959-07-23 Drill Stem Test Performed
1959-07-24 Drill Stem Test Performed
1959-07-25 Drill Stem Test Performed
1959-07-27 Finished Drilling
1959-07-27 Well Mode changed to Drilled and Cased
1959-07-29 Production Casing Operation Performed
1959-08-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-08-01 Perforation Treatment Performed - Jet Perforation
1959-08-02 Well Began Production
1959-08-02 Well Fluid changed to Crude Oil
1959-08-02 Well Mode changed to Flowing
1959-11-21 Perforation Treatment Performed - Jet Perforation
1959-11-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-05-16 Perforation Treatment Performed - Jet Perforation
1966-05-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-01-19 Well Fluid changed to Crude Oil
1980-01-19 Well Mode changed to Pumping
1991-04-10 Well Log Performed
1991-04-11 Perforation Treatment Performed - Jet Perforation
1991-04-11 Well Log Performed
1991-04-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-01-18 Perforation Treatment Performed - Jet Perforation
1997-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2017-05-01 Well Fluid changed to Crude Oil
2017-05-01 Well Mode changed to Suspended
2018-06-05 Well Fluid changed to Crude Oil
2018-06-05 Well Mode changed to Pumping
2019-08-01 Well Fluid changed to Crude Oil
2019-08-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-08-01 Perforation 2512.20 2513.70 13
1959-11-22 Acid Treatment 2488.10 2500.90 0
1966-05-16 Perforation 2475.60 2484.70 7
1966-05-16 Perforation 2505.50 2507.30 7
1966-05-22 Acid Treatment 2475.60 2507.30 0
1991-04-11 Perforation 2480.80 2489.60 13
1991-04-11 Perforation 2491.40 2507.60 13
1991-04-11 Perforation 2510.30 2518.30 13
1991-04-15 Acid Treatment 2475.60 2520.10 0
1997-01-18 Perforation 2509.70 2511.60 13
1997-01-18 Perforation 2514.00 2518.90 13
1959-08-01 Perforation 2516.40 2517.00 13
1997-01-20 Acid Treatment 2505.20 2518.90 0
1959-08-01 Perforation 2517.60 2518.90 13
1959-08-01 Perforation 2519.50 2520.10 13
1959-08-01 Acid Treatment 2512.20 2520.10 0
1959-11-21 Perforation 2488.10 2489.30 13
1959-11-21 Perforation 2490.20 2491.40 13
1959-11-21 Perforation 2494.20 2497.20 13
1959-11-21 Perforation 2499.70 2500.90 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7550 0.0 0.0 0.0
1968 8183 0.0 0.0 0.0
1969 8135 0.0 0.0 0.0
1970 8205 0.0 0.0 0.0
1971 7392 0.0 0.0 0.0
1972 7717 0.0 0.0 0.0
1973 4781 0.0 0.0 0.0
1974 8322 0.0 0.0 0.0
1975 8529 0.0 0.0 0.0
1976 8398 0.0 0.0 0.0
1977 8261 0.0 0.0 0.0
1978 6619 0.0 0.0 0.0
1979 8160 0.0 0.0 0.0
1980 7860 0.0 0.0 0.0
1981 6908 0.0 0.0 0.0
1982 8455 0.0 0.0 0.0
1983 8295 0.0 0.0 0.0
1984 8276 0.0 0.0 0.0
1985 8518 0.0 0.0 0.0
1986 8524 0.0 0.0 0.0
1987 8434 0.0 0.0 0.0
1988 8648 0.0 0.0 0.0
1989 8733 0.0 0.0 0.0
1990 8718 0.0 0.0 0.0
1991 7886 0.0 0.0 0.0
1992 7890 0.0 0.0 0.0
1993 8706 0.0 0.0 0.0
1994 8247 0.0 0.0 0.0
1995 8270 0.0 0.0 0.0
1996 8672 0.0 0.0 0.0
1997 8005 0.0 0.0 0.0
1998 8585 0.0 0.0 0.0
1999 8600 0.0 0.0 0.0
2000 8663 0.0 0.0 0.0
2001 8564 0.0 0.0 0.0
2002 8681 0.0 0.0 0.0
2003 8741 0.0 0.0 0.0
2004 8672 0.0 0.0 0.0
2005 8691 0.0 0.0 0.0
2006 8698 0.0 0.0 0.0
2007 8719 0.0 0.0 0.0
2008 8329 0.0 0.0 0.0
2009 8309 0.0 0.0 0.0
2010 7926 0.0 0.0 0.0
2011 6997 0.0 0.0 0.0
2012 7349 0.0 0.0 0.0
2013 7751 0.0 0.0 0.0
2014 8171 0.0 0.0 0.0
2015 7733 0.0 0.0 0.0
2016 770 0.0 0.0 0.0
2018 2 0.0 0.0 0.0

For data sources see[5]

References