X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0655111110000

Well Details

Well ID: 0655111110000
Loading map...
Location: 00/10-11-065-11W5/0
Location Alias: 00/10-11-65-11 W5M
Location Alias 2: 00/10-11-065-11 W5/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 5
Range: 11
Section: 11
County/Municipality: Big Lakes County
Well Name: 1976082 SWANHS 10-11-65-11
Operator Name: Razor Energy Corp.
License Number: 0021342
License Date: 1961-09-11
License Status: Suspension
Spud Date: 1961-09-14
Final Drill Date: 1961-10-07
Well Total Depth: 2537.50 m
Surface Hole Latitude: 54.612682
Surface Hole Longitude: -115.548169

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-09-11 Obtained License
1961-10-07 Finished Drilling
1961-10-07 Well Mode changed to Drilled and Cased
1961-10-09 Production Casing Operation Performed
1961-10-21 Perforation Treatment Performed - Jet Perforation
1961-10-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-10-24 Well Began Production
1961-10-24 Well Fluid changed to Crude Oil
1961-10-24 Well Mode changed to Flowing
1979-06-12 Well Fluid changed to Crude Oil
1979-06-12 Well Mode changed to Pumping
1991-12-19 Perforation Treatment Performed - Jet Perforation
1991-12-30 Perforation Treatment Performed - Chemical Squeeze
1991-12-31 Perforation Treatment Performed - Acid Squeeze - Press Used
2009-07-17 Well Fluid changed to Crude Oil
2009-07-17 Well Mode changed to Suspended
2015-12-01 Well Log Performed
2015-12-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-12-03 Plug Back Performed
2015-12-03 Well Fluid changed to Crude Oil
2015-12-03 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-10-21 Perforation 2500.00 2501.20 13
1961-10-21 Perforation 2496.30 2498.10 13
1961-10-22 Acid Treatment 2496.30 2501.20 0
1991-12-19 Perforation 2486.60 2501.20 13
1991-12-19 Perforation 2502.40 2506.10 13
1991-12-30 Chemical Squeeze 2486.60 2506.10 0
1991-12-31 Acid Treatment 2486.60 2506.10 0
2015-12-03 Packing Device Capped w/Cement 2472.00 2480.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 394 0.0 0.0 0.0
1977 7696 0.0 0.0 0.0
1978 8554 0.0 0.0 0.0
1979 8401 0.0 0.0 0.0
1980 5939 0.0 0.0 0.0
1981 5079 0.0 0.0 0.0
1982 7598 0.0 0.0 0.0
1983 7619 0.0 0.0 0.0
1984 7762 0.0 0.0 0.0
1985 8462 0.0 0.0 0.0
1986 7536 0.0 0.0 0.0
1987 8412 0.0 0.0 0.0
1988 8702 0.0 0.0 0.0
1989 8305 0.0 0.0 0.0
1990 8648 0.0 0.0 0.0
1991 8193 0.0 0.0 0.0
1992 8355 0.0 0.0 0.0
1993 8247 0.0 0.0 0.0
1994 8100 0.0 0.0 0.0
1995 8309 0.0 0.0 0.0
1996 8541 0.0 0.0 0.0
1997 8429 0.0 0.0 0.0
1998 8560 0.0 0.0 0.0
1999 8689 0.0 0.0 0.0
2000 8602 0.0 0.0 0.0
2001 8719 0.0 0.0 0.0
2002 7909 0.0 0.0 0.0
2003 8742 0.0 0.0 0.0
2004 8541 0.0 0.0 0.0
2005 4226 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-12-03 No Incident Encountered 0.00 0.00

For data sources see[6]

References