X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0655101810000

Well Details

Well ID: 0655101810000
Loading map...
Location: 00/10-18-065-10W5/0
Location Alias: 00/10-18-65-10 W5M
Location Alias 2: 00/10-18-065-10 W5/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 5
Range: 10
Section: 18
County/Municipality: Big Lakes County
Well Name: 1976082 SWANHS 10-18-65-10
Operator Name: Razor Energy Corp.
License Number: 0018503
License Date: 1960-01-14
License Status: Issued
Spud Date: 1960-01-17
Final Drill Date: 1960-02-08
Well Total Depth: 2604.50 m
Surface Hole Latitude: 54.626867
Surface Hole Longitude: -115.497746

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-01-14 Obtained License
1960-02-04 Lost Circulation Occurred
1960-02-08 Finished Drilling
1960-02-08 Well Mode changed to Drilled and Cased
1960-02-10 Production Casing Operation Performed
1960-02-11 Perforation Treatment Performed - Jet Perforation
1960-02-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-02-16 Well Began Production
1960-02-16 Well Fluid changed to Crude Oil
1960-02-16 Well Mode changed to Flowing
1971-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-02-10 Perforation Treatment Performed - Jet Perforation
1980-04-20 Well Fluid changed to Crude Oil
1980-04-20 Well Mode changed to Pumping
1981-05-16 Perforation Treatment Performed - Chemical Squeeze
1996-01-02 Well Log Performed
1996-12-04 Well Log Performed
2017-09-01 Well Fluid changed to Crude Oil
2017-09-01 Well Mode changed to Suspended
2018-08-27 Well Fluid changed to Crude Oil
2018-08-27 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-02-11 Perforation 2511.60 2514.60 7
1981-05-16 Chemical Squeeze 2488.40 2532.00 0
1960-02-11 Perforation 2529.80 2532.00 7
1960-02-13 Acid Treatment 2511.60 2532.00 0
1971-02-10 Perforation 2488.40 2493.60 7
1971-02-10 Perforation 2495.40 2496.00 7
1971-02-10 Perforation 2497.50 2499.40 7
1971-02-10 Perforation 2502.40 2506.10 7
1971-02-10 Perforation 2513.70 2514.30 7
1971-02-10 Acid Treatment 2488.40 2532.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1971 4391 0.0 0.0 0.0
1972 8369 0.0 0.0 0.0
1973 3085 0.0 0.0 0.0
1974 7049 0.0 0.0 0.0
1975 8126 0.0 0.0 0.0
1976 6397 0.0 0.0 0.0
1977 7913 0.0 0.0 0.0
1978 8287 0.0 0.0 0.0
1979 8488 0.0 0.0 0.0
1980 8574 0.0 0.0 0.0
1981 7979 0.0 0.0 0.0
1982 7981 0.0 0.0 0.0
1983 8229 0.0 0.0 0.0
1984 8255 0.0 0.0 0.0
1985 8551 0.0 0.0 0.0
1986 8495 0.0 0.0 0.0
1987 8446 0.0 0.0 0.0
1988 8558 0.0 0.0 0.0
1989 8345 0.0 0.0 0.0
1990 7933 0.0 0.0 0.0
1991 7457 0.0 0.0 0.0
1992 8513 0.0 0.0 0.0
1993 7348 0.0 0.0 0.0
1994 6488 0.0 0.0 0.0
1995 7889 0.0 0.0 0.0
1996 7554 0.0 0.0 0.0
1997 8569 0.0 0.0 0.0
1998 8503 0.0 0.0 0.0
1999 8009 0.0 0.0 0.0
2000 8547 0.0 0.0 0.0
2001 8749 0.0 0.0 0.0
2002 8536 0.0 0.0 0.0
2003 8752 0.0 0.0 0.0
2004 8699 0.0 0.0 0.0
2005 8674 0.0 0.0 0.0
2006 7737 0.0 0.0 0.0
2007 7929 0.0 0.0 0.0
2008 8675 0.0 0.0 0.0
2009 7950 0.0 0.0 0.0
2010 7743 0.0 0.0 0.0
2011 8016 0.0 0.0 0.0
2012 7996 0.0 0.0 0.0
2013 8639 0.0 0.0 0.0
2014 8739 0.0 0.0 0.0
2015 3580 0.0 0.0 0.0
2018 2985 0.0 0.0 0.0
2019 8304 0.0 0.0 0.0
2020 2145 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1960-02-04 Lost Circulation 2204.30 2579.20

For data sources see[6]

References