X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0655101105000

Well Details

Well ID: 0655101105000
Loading map...
Location: 00/05-11-065-10W5/0
Location Alias: 00/05-11-65-10 W5M
Location Alias 2: 00/05-11-065-10 W5/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 5
Range: 10
Section: 11
County/Municipality: Big Lakes County
Well Name: CPEC HZ SWANHS 5-11-65-10
Operator Name: Crescent Point Energy Corp.
License Number: 0442519
License Date: 2012-01-09
License Status: Amended
Spud Date: 2012-04-11
Final Drill Date: 2012-04-28
Well Total Depth: 4357.90 m
Surface Hole Latitude: 54.606964
Surface Hole Longitude: -115.378126

For data sources see[1][2]

Well History

Date Event
2012-01-09 Obtained License
2012-04-13 Surface Casing Operation Performed
2012-04-17 Direction Drilling Operation Performed - Deviate
2012-04-20 Direction Drilling Operation Performed - Horizontal
2012-04-21 Intermediate Casing Operation Performed
2012-04-28 Finished Drilling
2012-04-28 Well Log Performed
2012-04-28 Well Mode changed to Drilled and Cased
2012-04-30 Liner Casing Operation Performed
2012-05-01 Rig Released
2012-05-01 Well Log Performed
2012-09-01 Well Began Production
2012-09-01 Well Fluid changed to Crude Oil
2012-09-01 Well Mode changed to Pumping
2012-09-13 Perforation Treatment Performed - Multi-Stage Fracture
2012-09-13 Perforation Treatment Performed - Open-Hole Completion

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-04-11 Savanna Drilling Corp. S611 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-04-17 2205.70 Deviate (5 - 79 degrees)
2012-04-20 2530.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-09-13 Open Hole/Barefoot Completion 4353.00 4357.00 0
2012-09-13 Multi-Stage Fracture 3440.60 3440.70 0
2012-09-13 Multi-Stage Fracture 3323.30 3323.40 0
2012-09-13 Multi-Stage Fracture 3023.60 3023.70 0
2012-09-13 Multi-Stage Fracture 2865.10 2865.20 0
2012-09-13 Multi-Stage Fracture 2748.00 2748.10 0
2012-09-13 Multi-Stage Fracture 2644.50 2644.60 0
2012-09-13 Multi-Stage Fracture 2597.10 2597.20 0
2012-09-13 Multi-Stage Fracture 4330.20 4330.30 0
2012-09-13 Multi-Stage Fracture 4265.80 4265.90 0
2012-09-13 Multi-Stage Fracture 4166.10 4166.20 0
2012-09-13 Multi-Stage Fracture 4066.00 4066.10 0
2012-09-13 Multi-Stage Fracture 3993.60 3993.70 0
2012-09-13 Multi-Stage Fracture 3778.20 3778.30 0
2012-09-13 Multi-Stage Fracture 3647.10 3647.20 0
2012-09-13 Multi-Stage Fracture 3544.10 3544.20 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 509 0.0 0.0 0.0
2013 7465 0.0 0.0 0.0
2014 7533 0.0 0.0 0.0
2015 7576 0.0 0.0 0.0
2016 8155 0.0 0.0 0.0
2017 8690 0.0 0.0 0.0
2018 7469 0.0 0.0 0.0
2019 6349 0.0 0.0 0.0
2020 1721 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-05-01 No Incident Encountered 0.00 0.00
2012-09-13 No Incident Encountered 0.00 0.00

For data sources see[8]

References