If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0655090613000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.59883,"lon":-115.381499,"icon":""}]} |
Location: 00/13-06-065-09W5/0 | |
Location Alias: 00/13-06-65-09 W5M | |
Location Alias 2: 00/13-06-065-09 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 065 | |
Meridian: 5 | |
Range: 09 | |
Section: 06 | |
County/Municipality: Big Lakes County | |
Well Name: CPEC HZ SWANHS 13-6-65-9 | |
Operator Name: Crescent Point Energy Corp. | |
License Number: 0433301 | |
License Date: 2011-05-04 | |
License Status: Suspension | |
Spud Date: 2011-07-19 | |
Final Drill Date: 2011-08-06 | |
Well Total Depth: 4010.00 m | |
Surface Hole Latitude: 54.598830 | |
Surface Hole Longitude: -115.381499 |
Date | Event |
---|---|
2011-05-04 | Obtained License |
2011-07-20 | Surface Casing Operation Performed |
2011-07-25 | Direction Drilling Operation Performed - Horizontal |
2011-07-30 | Intermediate Casing Operation Performed |
2011-08-06 | Finished Drilling |
2011-08-06 | Well Log Performed |
2011-08-06 | Well Mode changed to Drilled and Cased |
2011-08-08 | Liner Casing Operation Performed |
2011-08-09 | Rig Released |
2011-08-27 | Well Log Performed |
2011-09-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-09-17 | Perforation Treatment Performed - Open-Hole Completion |
2011-09-20 | Well Began Production |
2011-09-20 | Well Fluid changed to Crude Oil |
2011-09-20 | Well Mode changed to Flowing |
2019-03-01 | Well Fluid changed to Crude Oil |
2019-03-01 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-07-25 | 2205.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-09-17 | Multi-Stage Fracture | 3983.20 | 3983.30 | 0 |
2011-09-17 | Multi-Stage Fracture | 3129.60 | 3129.70 | 0 |
2011-09-17 | Multi-Stage Fracture | 3030.10 | 3030.20 | 0 |
2011-09-17 | Multi-Stage Fracture | 2919.20 | 2919.30 | 0 |
2011-09-17 | Multi-Stage Fracture | 2820.60 | 2820.70 | 0 |
2011-09-17 | Multi-Stage Fracture | 2721.50 | 2721.60 | 0 |
2011-09-17 | Multi-Stage Fracture | 2608.30 | 2608.40 | 0 |
2011-09-17 | Open Hole/Barefoot Completion | 4006.00 | 4010.00 | 0 |
2011-09-17 | Multi-Stage Fracture | 3889.70 | 3889.80 | 0 |
2011-09-17 | Multi-Stage Fracture | 3764.30 | 3764.40 | 0 |
2011-09-17 | Multi-Stage Fracture | 3719.60 | 3719.70 | 0 |
2011-09-17 | Multi-Stage Fracture | 3622.80 | 3622.90 | 0 |
2011-09-17 | Multi-Stage Fracture | 3511.00 | 3511.10 | 0 |
2011-09-17 | Multi-Stage Fracture | 3425.70 | 3425.80 | 0 |
2011-09-17 | Multi-Stage Fracture | 3326.30 | 3326.40 | 0 |
2011-09-17 | Multi-Stage Fracture | 3227.80 | 3227.90 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 2104 | 0.0 | 0.0 | 0.0 |
2012 | 6706 | 0.0 | 0.0 | 0.0 |
2013 | 7807 | 0.0 | 0.0 | 0.0 |
2014 | 7754 | 0.0 | 0.0 | 0.0 |
2015 | 7038 | 0.0 | 0.0 | 0.0 |
2016 | 5544 | 0.0 | 0.0 | 0.0 |
For data sources see[6]