X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0655090605000

Well Details

Well ID: 0655090605000
Loading map...
Location: 00/05-06-065-09W5/0
Location Alias: 00/05-06-65-09 W5M
Location Alias 2: 00/05-06-065-09 W5/00
Country: Canada
Province: Alberta
Township: 065
Meridian: 5
Range: 09
Section: 06
County/Municipality: Big Lakes County
Well Name: CPEC HZ SWANHS 5-6-65-9
Operator Name: Crescent Point Energy Corp.
License Number: 0444962
License Date: 2012-03-16
License Status: Suspension
Spud Date: 2012-03-22
Final Drill Date: 2012-04-07
Well Total Depth: 4148.00 m
Surface Hole Latitude: 54.590512
Surface Hole Longitude: -115.384019

For data sources see[1][2]

Well History

Date Event
2012-03-16 Obtained License
2012-03-22 Well Log Performed
2012-03-23 Surface Casing Operation Performed
2012-03-27 Direction Drilling Operation Performed - Deviate
2012-03-30 Direction Drilling Operation Performed - Horizontal
2012-03-31 Intermediate Casing Operation Performed
2012-04-07 Finished Drilling
2012-04-07 Well Mode changed to Drilled and Cased
2012-04-09 Liner Casing Operation Performed
2012-04-09 Well Log Performed
2012-04-10 Rig Released
2012-06-04 Perforation Treatment Performed - Multi-Stage Fracture
2012-06-04 Perforation Treatment Performed - Open-Hole Completion
2012-06-06 Well Began Production
2012-06-06 Well Fluid changed to Crude Oil
2012-06-06 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-03-22 Savanna Drilling Corp. 619 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-03-27 2155.90 Deviate (5 - 79 degrees)
2012-03-30 2527.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-06-04 Open Hole/Barefoot Completion 4144.00 4148.00 0
2012-06-04 Multi-Stage Fracture 3238.70 3238.80 0
2012-06-04 Multi-Stage Fracture 3121.00 3121.10 0
2012-06-04 Multi-Stage Fracture 2991.70 2991.80 0
2012-06-04 Multi-Stage Fracture 2902.30 2902.40 0
2012-06-04 Multi-Stage Fracture 2812.80 2812.90 0
2012-06-04 Multi-Stage Fracture 2695.70 2695.80 0
2012-06-04 Multi-Stage Fracture 2578.50 2578.60 0
2012-06-04 Multi-Stage Fracture 4134.70 4134.80 0
2012-06-04 Multi-Stage Fracture 4083.70 4083.80 0
2012-06-04 Multi-Stage Fracture 3942.90 3943.00 0
2012-06-04 Multi-Stage Fracture 3845.90 3846.00 0
2012-06-04 Multi-Stage Fracture 3759.30 3759.40 0
2012-06-04 Multi-Stage Fracture 3589.40 3589.50 0
2012-06-04 Multi-Stage Fracture 3445.60 3445.70 0
2012-06-04 Multi-Stage Fracture 3328.30 3328.40 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 2618 0.0 0.0 0.0
2013 7514 0.0 0.0 0.0
2014 7783 0.0 0.0 0.0
2015 7177 0.0 0.0 0.0
2016 3067 0.0 0.0 0.0
2017 7684 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-04-10 No Incident Encountered 0.00 0.00
2012-06-03 No Incident Encountered 0.00 0.00

For data sources see[8]

References