If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0655063105000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.666758,"lon":-114.90579,"icon":""}]} |
Location: 00/05-31-065-06W5/0 | |
Location Alias: 00/05-31-65-06 W5M | |
Location Alias 2: 00/05-31-065-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 065 | |
Meridian: 5 | |
Range: 06 | |
Section: 31 | |
County/Municipality: Woodlands County | |
Well Name: HUDSON'S BAY EAST VIRGINIA HILLS 1 | |
Operator Name: Plains Midstream Canada ULC | |
License Number: 0013472 | |
License Date: 1957-05-31 | |
License Status: Re-Entered | |
Spud Date: 1957-06-06 | |
Final Drill Date: 1957-07-18 | |
Well Total Depth: 2567.00 m | |
Surface Hole Latitude: 54.666758 | |
Surface Hole Longitude: -114.905790 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1957-05-31 | Obtained License |
1957-07-18 | Finished Drilling |
1957-07-26 | Drill Stem Test Performed |
1957-07-27 | Drill Stem Test Performed |
1957-07-28 | Production Casing Operation Performed |
1957-07-31 | Perforation Treatment Performed - Jet Perforation |
1957-08-01 | Drill Stem Test Performed |
1957-08-01 | Perforation Treatment Performed - Cement Plug |
1957-08-01 | Perforation Treatment Performed - Jet Perforation |
1957-08-02 | Perforation Treatment Performed - Jet Perforation |
1957-08-03 | Drill Stem Test Performed |
1957-08-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1957-08-03 | Perforation Treatment Performed - Cement Plug |
1957-08-03 | Perforation Treatment Performed - Jet Perforation |
1957-08-08 | Perforation Treatment Performed - Jet Perforation |
1957-09-25 | Well Mode changed to Drilled and Cased |
1957-10-01 | Well Fluid changed to Gas |
1957-10-01 | Well Mode changed to Testing |
1960-02-21 | Perforation Treatment Performed - Cement Plug |
1960-02-21 | Well Fluid changed to Gas |
1960-02-21 | Well Mode changed to Abandoned |
1960-02-22 | Well Abandoned |
1960-02-22 | Well Fluid changed to Gas |
1960-02-22 | Well Mode changed to Abandoned and Re-entered |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1957-07-31 | Perforation | 1475.20 | 1478.30 | 13 |
1960-02-21 | Cement Plug | 2051.30 | 2157.40 | 0 |
1957-07-31 | Perforation | 1460.60 | 1463.60 | 13 |
1957-08-01 | Cement Plug | 1460.60 | 1478.30 | 0 |
1957-08-01 | Perforation | 1284.40 | 1287.50 | 13 |
1957-08-02 | Perforation | 1292.40 | 1295.40 | 13 |
1957-08-03 | Cement Plug | 1284.40 | 1295.40 | 0 |
1957-08-03 | Perforation | 1155.80 | 1158.80 | 13 |
1957-08-03 | Acid Treatment | 1155.80 | 1158.80 | 0 |
1957-08-08 | Perforation | 2164.10 | 2167.10 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]