If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0654262002004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.634004,"lon":-113.89919,"icon":""}]} |
Location: 00/02-20-065-26W4/4 | |
Location Alias: 00/02-20-65-26 W4M | |
Location Alias 2: 00/02-20-065-26 W4/04 | |
Country: Canada | |
Province: Alberta | |
Township: 065 | |
Meridian: 4 | |
Range: 26 | |
Section: 20 | |
County/Municipality: Municipal District of Lesser Slave River No. 124 | |
Well Name: SEQUOIA BIGB 2-20-65-26 | |
Operator Name: Sequoia Resources Corp. | |
License Number: 0152462 | |
License Date: 1992-05-13 | |
License Status: Suspension | |
Spud Date: 1992-07-03 | |
Final Drill Date: 1992-07-06 | |
Well Total Depth: 873.00 m | |
Surface Hole Latitude: 54.634004 | |
Surface Hole Longitude: -113.899190 |
Date | Event |
---|---|
1992-05-13 | Obtained License |
1992-07-04 | Surface Casing Operation Performed |
1992-07-06 | Finished Drilling |
1992-07-06 | Lost Circulation Occurred |
1992-07-06 | Well Log Performed |
1992-07-06 | Well Mode changed to Drilled and Cased |
1992-07-08 | Lost Circulation Occurred |
1992-07-09 | Production Casing Operation Performed |
1992-07-09 | Rig Released |
1992-07-13 | Perforation Treatment Performed - Jet Perforation |
1992-08-27 | Perforation Treatment Performed - Cement Squeeze |
1992-08-28 | Perforation Treatment Performed - Jet Perforation |
1993-11-12 | Perforation Treatment Performed - Jet Perforation |
1996-02-16 | Perforation Treatment Performed - Jet Perforation |
1997-08-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-08-19 | Perforation Treatment Performed - Jet Perforation |
1997-08-19 | Plug Back Performed |
1997-08-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-08-20 | Perforation Treatment Performed - Jet Perforation |
1997-08-20 | Plug Back Performed |
1998-08-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-08-13 | Perforation Treatment Performed - Jet Perforation |
1998-10-01 | Well Began Production |
1998-10-01 | Well Fluid changed to Gas |
1998-10-01 | Well Mode changed to Flowing |
1999-07-21 | Perforation Treatment Performed - Jet Perforation |
2004-08-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-08-21 | Perforation Treatment Performed - Jet Perforation |
2004-08-21 | Plug Back Performed |
2004-08-21 | Well Fluid changed to Gas |
2004-08-21 | Well Log Performed |
2004-08-21 | Well Mode changed to Abandoned Zone |
2007-07-29 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1992-07-13 | Perforation | 819.50 | 821.00 | 13 |
1997-08-20 | Packing Device Capped w/Cement | 676.50 | 684.50 | 0 |
1997-08-20 | Perforation | 670.00 | 672.00 | 13 |
1998-08-13 | Packing Device Capped w/Cement | 657.00 | 665.00 | 0 |
1998-08-13 | Perforation | 635.00 | 636.00 | 13 |
1998-08-13 | Perforation | 632.00 | 633.00 | 13 |
1999-07-21 | Perforation | 628.00 | 629.00 | 13 |
2004-08-21 | Packing Device Capped w/Cement | 618.00 | 626.00 | 0 |
2004-08-21 | Perforation | 617.00 | 617.50 | 17 |
2007-07-29 | Perforation | 614.00 | 614.50 | 17 |
1992-08-27 | Cement Squeeze | 819.50 | 821.00 | 0 |
1992-08-28 | Perforation | 814.50 | 816.50 | 13 |
1992-08-28 | Perforation | 817.50 | 818.50 | 13 |
1993-11-12 | Perforation | 789.00 | 792.50 | 13 |
1996-02-16 | Perforation | 686.00 | 687.00 | 13 |
1997-08-19 | Packing Device Capped w/Cement | 803.00 | 811.00 | 0 |
1997-08-19 | Packing Device Capped w/Cement | 777.00 | 785.00 | 0 |
1997-08-19 | Perforation | 687.00 | 689.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1997 | 3208 | 0.0 | 0.0 | 0.0 |
1998 | 8641 | 0.0 | 0.0 | 0.0 |
1999 | 7790 | 0.0 | 0.0 | 0.0 |
2000 | 8754 | 0.0 | 0.0 | 0.0 |
2001 | 8359 | 0.0 | 0.0 | 0.0 |
2002 | 1409 | 0.0 | 0.0 | 0.0 |
2003 | 148 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1992-07-06 | Lost Circulation | 873.00 | 873.00 |
1992-07-08 | Lost Circulation | 873.00 | 873.00 |
For data sources see[6]