X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0654220809002

Well Details

Well ID: 0654220809002
Loading map...
Location: 00/09-08-065-22W4/2
Location Alias: 00/09-08-65-22 W4M
Location Alias 2: 00/09-08-065-22 W4/02
Country: Canada
Province: Alberta
Township: 065
Meridian: 4
Range: 22
Section: 08
County/Municipality: Athabasca County
Well Name: HORSESHOE BAY MEANOOK 9-8-65-22
Operator Name: Horseshoe Bay Resources Limited
License Number: 0181758
License Date: 1995-11-01
License Status: Suspension
Spud Date: 1995-11-13
Final Drill Date: 1995-11-16
Well Total Depth: 745.00 m
Surface Hole Latitude: 54.613201
Surface Hole Longitude: -113.287746

For data sources see[1][2]

Well History

Date Event
1995-11-01 Obtained License
1995-11-14 Direction Drilling Operation Performed - Deviate
1995-11-14 Surface Casing Operation Performed
1995-11-16 Finished Drilling
1995-11-16 Production Casing Operation Performed
1995-11-16 Well Log Performed
1995-11-16 Well Mode changed to Drilled and Cased
1995-11-17 Rig Released
1995-11-25 Perforation Treatment Performed - Jet Perforation
1995-12-06 Well Log Performed
1998-06-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-06-13 Perforation Treatment Performed - Jet Perforation
1998-06-13 Plug Back Performed
1998-07-13 Well Began Production
1998-07-13 Well Fluid changed to Gas
1998-07-13 Well Mode changed to Flowing
1998-08-14 Perforation Treatment Performed - Jet Perforation
2000-11-01 Well Fluid changed to Gas
2000-11-01 Well Mode changed to Suspended
2001-10-06 Well Fluid changed to Gas
2001-10-06 Well Mode changed to Flowing
2004-08-31 Well Fluid changed to Gas
2004-08-31 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-11-14 191.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-11-25 Perforation 716.50 717.50 14
1998-06-13 Packing Device Capped w/Cement 703.50 711.50 0
1998-06-13 Perforation 586.50 587.00 13
1998-08-14 Perforation 583.50 584.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 4515 0.0 0.0 0.0
1999 2473 0.0 0.0 0.0
2000 1272 0.0 0.0 0.0
2001 707 0.0 0.0 0.0
2002 4872 0.0 0.0 0.0
2003 7431 0.0 0.0 0.0

For data sources see[6]

References