X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0654181908003

Well Details

Well ID: 0654181908003
Loading map...
Location: 00/08-19-065-18W4/3
Location Alias: 00/08-19-65-18 W4M
Location Alias 2: 00/08-19-065-18 W4/03
Country: Canada
Province: Alberta
Township: 065
Meridian: 4
Range: 18
Section: 19
County/Municipality: Athabasca County
Well Name: PEOC FLAT 8-19-65-18
Operator Name: Sequoia Resources Corp.
License Number: 0196635
License Date: 1997-01-13
License Status: Suspension
Spud Date: 1997-12-12
Final Drill Date: 1997-12-14
Well Total Depth: 616.00 m
Surface Hole Latitude: 54.635031
Surface Hole Longitude: -112.708080

For data sources see[1][2]

Well History

Date Event
1997-01-13 Obtained License
1997-12-13 Surface Casing Operation Performed
1997-12-14 Finished Drilling
1997-12-14 Well Log Performed
1997-12-14 Well Mode changed to Drilled and Cased
1997-12-15 Production Casing Operation Performed
1997-12-15 Rig Released
1997-12-20 Well Log Performed
1997-12-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-12-21 Perforation Treatment Performed - Jet Perforation
1997-12-21 Well Log Performed
1997-12-23 Perforation Treatment Performed - Jet Perforation
1997-12-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-02-02 Well Log Performed
1998-02-03 Well Log Performed
1998-02-04 Perforation Treatment Performed - Jet Perforation
2009-01-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-01-20 Perforation Treatment Performed - Jet Perforation
2009-01-20 Plug Back Performed
2009-01-20 Well Log Performed
2009-01-21 Perforation Treatment Performed - Jet Perforation
2009-02-13 Well Began Production
2009-02-13 Well Fluid changed to Gas
2009-02-13 Well Mode changed to Flowing
2012-10-01 Well Fluid changed to Gas
2012-10-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-12-21 Perforation 235.00 235.30 24
2009-01-21 Perforation 456.00 458.00 20
1997-12-21 Packing Device Capped w/Cement 235.00 235.30 0
1997-12-23 Perforation 598.20 600.00 14
1997-12-29 Acid Treatment 598.20 600.00 0
1998-02-04 Perforation 492.00 493.00 13
1998-02-04 Perforation 495.50 497.00 13
1998-02-04 Perforation 450.80 452.80 13
2009-01-20 Packing Device Capped w/Cement 588.00 596.00 0
2009-01-20 Perforation 476.00 476.50 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 7000 0.0 0.0 0.0
2010 4921 0.0 0.0 0.0
2011 3321 0.0 0.0 0.0

For data sources see[5]

References