If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0646123110020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.584214,"lon":-119.785727,"icon":""}]} |
Location: 02/10-31-064-12W6/0 | |
Location Alias: 02/10-31-64-12 W6M | |
Location Alias 2: 02/10-31-064-12 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 064 | |
Meridian: 6 | |
Range: 12 | |
Section: 31 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: MAPAN ENERGY CHINOOKR 10-31-64-12 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0331466 | |
License Date: 2005-05-24 | |
License Status: Suspension | |
Spud Date: 2005-08-15 | |
Final Drill Date: 2005-11-08 | |
Well Total Depth: 3806.00 m | |
Surface Hole Latitude: 54.584214 | |
Surface Hole Longitude: -119.785727 |
Date | Event |
---|---|
2005-05-24 | Obtained License |
2005-08-21 | Lost Circulation Occurred |
2005-09-02 | Surface Casing Operation Performed |
2005-09-07 | Direction Drilling Operation Performed - Deviate |
2005-09-18 | Kick Occurred |
2005-09-26 | Well Log Performed |
2005-09-28 | Intermediate Casing Operation Performed |
2005-09-29 | Perforation Treatment Performed - Jet Perforation |
2005-09-30 | Perforation Treatment Performed - Remedial Casing |
2005-10-06 | Kick Occurred |
2005-11-08 | Finished Drilling |
2005-11-08 | Well Mode changed to Drilled and Cased |
2005-11-09 | Well Log Performed |
2005-11-12 | Production Casing Operation Performed |
2005-11-14 | Rig Released |
2006-01-12 | Perforation Treatment Performed - Jet Perforation |
2006-01-13 | Perforation Treatment Performed - Fractured |
2006-01-17 | Perforation Treatment Performed - Jet Perforation |
2006-01-19 | Perforation Treatment Performed - Fractured |
2006-01-25 | Perforation Treatment Performed - Jet Perforation |
2006-01-26 | Perforation Treatment Performed - Fractured |
2006-02-02 | Perforation Treatment Performed - Jet Perforation |
2006-02-03 | Perforation Treatment Performed - Fractured |
2006-07-06 | Perforation Treatment Performed - Jet Perforation |
2006-07-08 | Perforation Treatment Performed - Fractured |
2006-07-17 | Perforation Treatment Performed - Jet Perforation |
2006-07-18 | Perforation Treatment Performed - Fractured |
2006-11-09 | Well Began Production |
2006-11-09 | Well Fluid changed to Gas |
2006-11-09 | Well Mode changed to Flowing |
2011-02-01 | Well Fluid changed to Gas |
2011-02-01 | Well Mode changed to Flowing |
2016-04-01 | Well Fluid changed to Gas |
2016-04-01 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2005-09-07 | 1135.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-09-29 | Perforation | 161.50 | 162.00 | 13 |
2006-01-26 | Fracture | 3644.00 | 3647.00 | 0 |
2006-02-02 | Perforation | 3604.00 | 3607.00 | 20 |
2006-02-03 | Fracture | 3604.00 | 3607.00 | 0 |
2006-07-06 | Perforation | 2966.50 | 2969.50 | 20 |
2006-07-08 | Fracture | 2966.50 | 2969.50 | 0 |
2006-07-17 | Perforation | 2494.00 | 2497.00 | 20 |
2006-07-18 | Fracture | 2494.00 | 2497.00 | 0 |
2005-09-29 | Perforation | 111.50 | 112.00 | 13 |
2005-09-30 | Remedial Casing Cementing | 161.50 | 162.00 | 0 |
2005-09-30 | Remedial Casing Cementing | 111.50 | 112.00 | 0 |
2006-01-12 | Perforation | 3771.00 | 3774.00 | 20 |
2006-01-13 | Fracture | 3771.00 | 3774.00 | 0 |
2006-01-17 | Perforation | 3712.00 | 3731.00 | 20 |
2006-01-19 | Fracture | 3712.00 | 3731.00 | 0 |
2006-01-25 | Perforation | 3644.00 | 3647.00 | 20 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 365 | 0.0 | 0.0 | 0.0 |
2007 | 4144 | 0.0 | 0.0 | 0.0 |
2008 | 3018 | 0.0 | 0.0 | 0.0 |
2009 | 7752 | 0.0 | 0.0 | 0.0 |
2010 | 8639 | 0.0 | 0.0 | 0.0 |
2011 | 8280 | 0.0 | 0.0 | 0.0 |
2012 | 5928 | 0.0 | 0.0 | 0.0 |
2013 | 4104 | 0.0 | 0.0 | 0.0 |
2014 | 1225 | 0.0 | 0.0 | 0.0 |
2015 | 719 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2005-08-21 | Lost Circulation | 573.00 | 1032.00 |
2005-09-18 | Kick | 2367.00 | 2367.00 |
2005-10-06 | Kick | 2939.00 | 2939.00 |
For data sources see[7]