X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0646100707000

Well Details

Well ID: 0646100707000
Loading map...
Location: 00/07-07-064-10W6/0
Location Alias: 00/07-07-64-10 W6M
Location Alias 2: 00/07-07-064-10 W6/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 6
Range: 10
Section: 07
County/Municipality: Municipal District of Greenview No. 16
Well Name: AMOCO CUTBANK 7-7-64-10
Operator Name: BP Canada Energy Group ULC
License Number: 0077292
License Date: 1979-08-03
License Status: RecCertified
Spud Date: 1979-08-23
Final Drill Date: 1979-12-05
Well Total Depth: 3532.00 m
Surface Hole Latitude: 54.520686
Surface Hole Longitude: -119.493652

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-08-03 Obtained License
1979-08-25 Lost Circulation Occurred
1979-10-24 Well Log Performed
1979-10-31 Drill Stem Test Performed
1979-11-05 Lost Circulation Occurred
1979-12-05 Finished Drilling
1979-12-05 Lost Circulation Occurred
1979-12-17 Production Casing Operation Performed
1980-03-25 Perforation Treatment Performed - Jet Perforation
1980-03-25 Well Mode changed to Drilled and Cased
1980-03-27 Perforation Treatment Performed - Jet Perforation
1980-03-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-03-30 Perforation Treatment Performed - Jet Perforation
1980-07-12 Perforation Treatment Performed - Fractured
1990-09-29 Well Log Performed
1990-09-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-09-30 Plug Back Performed
1990-09-30 Well Mode changed to Abandoned
1990-10-01 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-03-25 Perforation 2941.50 2944.00 13
1980-03-25 Perforation 2945.00 2946.00 13
1980-03-25 Perforation 2947.00 2948.00 13
1980-03-27 Perforation 2900.50 2905.00 13
1980-03-29 Acid Treatment 2900.50 2905.00 0
1980-03-30 Perforation 2900.50 2905.00 13
1980-07-12 Fracture 2900.50 2905.00 0
1990-09-30 Packing Device Capped w/Cement 2911.00 2918.00 0
1990-09-30 Packing Device Capped w/Cement 2866.00 2875.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1979-08-25 Lost Circulation 98.00 98.00
1979-11-05 Lost Circulation 3368.00 3368.00
1979-12-05 Lost Circulation 3532.00 3532.00

For data sources see[5]

References