X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0646061312000

Well Details

Well ID: 0646061312000
Loading map...
Location: 00/12-13-064-06W6/0
Location Alias: 00/12-13-64-06 W6M
Location Alias 2: 00/12-13-064-06 W6/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 6
Range: 06
Section: 13
County/Municipality: Municipal District of Greenview No. 16
Well Name: LONG RUN HZ KAKWA 12-13-64-6
Operator Name: Long Run Exploration Ltd.
License Number: 0479605
License Date: 2016-06-03
License Status: Issued
Spud Date: 2016-12-28
Final Drill Date: 2017-01-10
Well Total Depth: 2973.00 m
Surface Hole Latitude: 54.541196
Surface Hole Longitude: -118.756006

For data sources see[1][2]

Well History

Date Event
2016-06-03 Obtained License
2016-12-29 Surface Casing Operation Performed
2016-12-31 Direction Drilling Operation Performed - Deviate
2016-12-31 Direction Drilling Operation Performed - Horizontal
2017-01-02 Intermediate Casing Operation Performed
2017-01-10 Finished Drilling
2017-01-10 Liner Casing Operation Performed
2017-01-10 Perforation Treatment Performed - Open-Hole Completion
2017-01-10 Well Log Performed
2017-01-10 Well Mode changed to Drilled and Cased
2017-01-11 Rig Released
2017-01-24 Perforation Treatment Performed - Multi-Stage Fracture
2017-02-07 Well Fluid changed to Gas
2017-02-07 Well Mode changed to Testing
2017-03-01 Well Began Production
2017-03-01 Well Fluid changed to Gas
2017-03-01 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-12-28 Bonanza Drilling Inc. 9 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-12-31 1419.80 Deviate (5 - 79 degrees)
2016-12-31 1743.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-01-10 Open Hole/Barefoot Completion 2965.70 2973.00 0
2017-01-24 Multi-Stage Fracture 2500.50 2501.00 0
2017-01-24 Multi-Stage Fracture 2455.10 2455.60 0
2017-01-24 Multi-Stage Fracture 2409.80 2410.30 0
2017-01-24 Multi-Stage Fracture 2350.90 2351.40 0
2017-01-24 Multi-Stage Fracture 2305.50 2306.00 0
2017-01-24 Multi-Stage Fracture 2246.60 2247.10 0
2017-01-24 Multi-Stage Fracture 2201.30 2201.80 0
2017-01-24 Multi-Stage Fracture 2142.40 2142.90 0
2017-01-24 Multi-Stage Fracture 2097.10 2097.60 0
2017-01-24 Multi-Stage Fracture 2038.20 2038.70 0
2017-01-24 Multi-Stage Fracture 2931.50 2932.40 0
2017-01-24 Multi-Stage Fracture 1992.90 1993.40 0
2017-01-24 Multi-Stage Fracture 1934.00 1934.50 0
2017-01-24 Multi-Stage Fracture 1888.70 1889.20 0
2017-01-24 Multi-Stage Fracture 2872.00 2872.50 0
2017-01-24 Multi-Stage Fracture 2813.20 2813.70 0
2017-01-24 Multi-Stage Fracture 2767.90 2768.40 0
2017-01-24 Multi-Stage Fracture 2709.00 2709.50 0
2017-01-24 Multi-Stage Fracture 2663.70 2664.20 0
2017-01-24 Multi-Stage Fracture 2604.80 2605.30 0
2017-01-24 Multi-Stage Fracture 2559.40 2559.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-01-24 2017-01-24 1,647 545 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 45.615 N/A
FRAC SAND. 20/40 WHITE (OTTAWA TYPE) Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 30.3631 N/A
Alpha 544 Baker Hughes Bactericide/Biocide 2.2-Dibromo-3-nitrilopropionamide 10222-01-2 100 0.0041 N/A
Dibromoacetonitrile 3252-43-5 100 0.0041 N/A
Polyethylene Glycol 25322-68-3 100 0.0041 N/A
Sodium Bromide 7647-15-6 100 0.0041 N/A
Water 7732-18-5 100 0.0041 N/A
GBW-41LW Baker Hughes Breaker Hydrogen Peroxide 7722-84-1 100 0.1372 N/A
Methanol 67-56-1 100 0.1372 N/A
Non-hazardous Not Available 100 0.1372 N/A
ClayMix Baker Hughes Clay Control Choline chloride 67-48-1 100 0.1001 N/A
Complex polyamine salt 138879-94-4 100 0.1001 N/A
Non-hazardous Not Available 100 0.1001 N/A
Water 7732-18-5 100 0.1001 N/A
D-3 Baker Hughes Demulsifier Ethoxylated alcohol. branched 78330-19-5 100 0.0356 N/A
Isopropanol 67-63-0 100 0.0356 N/A
Methanol 67-56-1 100 0.0356 N/A
Nitrogen Baker Hughes Energizing Fluid Nitrogen 7727-37-9 100 25.5706 N/A
FAW-30 Baker Hughes Friction Reducer Amine derivative 9842 100 0.4482 N/A
Glycerine 56-81-5 100 0.4482 N/A
MaxPerm-20A Baker Hughes Friction Reducer Non-hazardous 9014 100 0.2976 N/A
Oxyalkylated alcohol 9014 100 0.2976 N/A
Petroleum distillates 64742-47-8 100 0.2976 N/A
Polyacrylate 9014 100 0.2976 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-01-16 2017-01-25 Surface Water - Runoff 690

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 5938 0.0 0.0 0.0
2018 8545 0.0 0.0 0.0
2019 7960 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-01-11 No Incident Encountered 0.00 0.00
2017-01-29 No Incident Encountered 0.00 0.00

For data sources see[10]

References