X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0646041107000

Well Details

Well ID: 0646041107000
Loading map...
Location: 00/07-11-064-04W6/0
Location Alias: 00/07-11-64-04 W6M
Location Alias 2: 00/07-11-064-04 W6/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 6
Range: 04
Section: 11
County/Municipality: Municipal District of Greenview No. 16
Well Name: GULF AMOCO ET AL KAKWA 7-11-64-4
Operator Name: Gulf Canada Limited
License Number: 0074539
License Date: 1979-02-19
License Status: Re-Entered
Spud Date: 1979-02-27
Final Drill Date: 1979-05-14
Well Total Depth: 3062.00 m
Surface Hole Latitude: 54.520394
Surface Hole Longitude: -118.486368

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-02-19 Obtained License
1979-05-14 Finished Drilling
1979-05-31 Drill Stem Test Performed
1979-06-06 Liner Casing Operation Performed
1979-06-08 Well Mode changed to Drilled and Cased
1980-01-07 Perforation Treatment Performed - Jet Perforation
1980-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-02-17 Perforation Treatment Performed - Fractured
1980-02-23 Perforation Treatment Performed - Cement Squeeze
1980-03-16 Perforation Treatment Performed - Jet Perforation
1980-03-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-03-21 Perforation Treatment Performed - Cement Squeeze
1980-03-22 Perforation Treatment Performed - Jet Perforation
1980-03-23 Perforation Treatment Performed - Jet Perforation
1980-03-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-03-27 Perforation Treatment Performed - Fractured
1981-03-03 Perforation Treatment Performed - Cement Squeeze
1981-03-03 Well Abandoned
1981-03-03 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-01-07 Perforation 2727.00 2734.00 13
1980-03-23 Perforation 1997.00 1999.00 13
1980-03-23 Perforation 2004.00 2008.00 13
1980-03-24 Acid Treatment 1997.00 2051.00 0
1980-03-27 Fracture 1997.00 2051.00 0
1981-03-03 Cement Squeeze 1997.00 2051.00 0
1980-02-10 Acid Treatment 2727.00 2734.00 0
1980-02-17 Fracture 2727.00 2734.00 0
1980-02-23 Cement Squeeze 2727.00 2734.00 0
1980-03-16 Perforation 2470.00 2477.00 13
1980-03-18 Acid Treatment 2470.00 2477.00 0
1980-03-21 Cement Squeeze 2470.00 2477.00 0
1980-03-22 Perforation 2041.00 2045.00 13
1980-03-22 Perforation 2048.00 2051.00 13

For data sources see[4]



References