X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0646030401000

Well Details

Well ID: 0646030401000
Loading map...
Location: 00/01-04-064-03W6/0
Location Alias: 00/01-04-64-03 W6M
Location Alias 2: 00/01-04-064-03 W6/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 6
Range: 03
Section: 04
County/Municipality: Municipal District of Greenview No. 16
Well Name: STRATH KARR 1-4-64-3
Operator Name: Strath Resources Ltd.
License Number: 0385738
License Date: 2007-11-27
License Status: Suspension
Spud Date: 2007-12-30
Final Drill Date: 2008-01-17
Well Total Depth: 2720.00 m
Surface Hole Latitude: 54.505569
Surface Hole Longitude: -118.373750

For data sources see[1][2]

Well History

Date Event
2007-11-27 Obtained License
2008-01-01 Surface Casing Operation Performed
2008-01-03 Direction Drilling Operation Performed - Deviate
2008-01-17 Finished Drilling
2008-01-17 Well Log Performed
2008-01-17 Well Mode changed to Drilled and Cased
2008-01-21 Well Log Performed
2008-01-22 Well Log Performed
2008-01-24 Production Casing Operation Performed
2008-01-26 Rig Released
2008-02-02 Well Log Performed
2008-02-04 Well Log Performed
2008-02-05 Well Log Performed
2008-02-10 Perforation Treatment Performed - Jet Perforation
2008-02-10 Perforation Treatment Performed - Remedial Casing
2008-02-10 Well Log Performed
2008-02-11 Perforation Treatment Performed - Jet Perforation
2008-02-11 Perforation Treatment Performed - Remedial Casing
2008-02-11 Well Log Performed
2008-02-15 Perforation Treatment Performed - Jet Perforation
2008-02-16 Well Log Performed
2008-02-24 Well Log Performed
2008-02-25 Well Log Performed
2008-02-27 Perforation Treatment Performed - Jet Perforation
2008-02-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-02-28 Perforation Treatment Performed - Jet Perforation
2008-02-29 Perforation Treatment Performed - Jet Perforation
2008-02-29 Perforation Treatment Performed - Remedial Casing
2008-03-01 Perforation Treatment Performed - Jet Perforation
2008-03-01 Well Log Performed
2008-03-02 Perforation Treatment Performed - Remedial Casing
2008-03-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-03 Perforation Treatment Performed - Remedial Casing
2008-03-04 Perforation Treatment Performed - Jet Perforation
2008-03-05 Perforation Treatment Performed - Remedial Casing
2008-03-06 Perforation Treatment Performed - Remedial Casing
2008-03-06 Well Log Performed
2008-03-07 Perforation Treatment Performed - Jet Perforation
2008-03-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-10 Perforation Treatment Performed - Cement Plug
2008-03-10 Perforation Treatment Performed - Jet Perforation
2008-03-10 Perforation Treatment Performed - Remedial Casing
2008-03-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-12 Perforation Treatment Performed - Jet Perforation
2008-03-12 Perforation Treatment Performed - Remedial Casing
2008-03-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-13 Perforation Treatment Performed - Jet Perforation
2008-03-13 Perforation Treatment Performed - Remedial Casing
2008-03-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-14 Perforation Treatment Performed - Jet Perforation
2008-03-14 Perforation Treatment Performed - Remedial Casing
2008-03-14 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-01-03 1060.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-02-10 Perforation 2712.00 2713.00 20
2008-02-28 Perforation 2670.00 2671.00 17
2008-02-29 Remedial Casing Cementing 2670.00 2671.00 0
2008-02-29 Perforation 2654.50 2655.50 17
2008-03-01 Perforation 2599.00 2600.00 17
2008-03-02 Remedial Casing Cementing 2654.50 2655.50 0
2008-03-03 Remedial Casing Cementing 2599.00 2600.00 0
2008-03-03 Remedial Casing Cementing 2538.00 2541.00 0
2008-03-03 Packing Device Capped w/Cement 2313.60 2328.00 0
2008-03-04 Perforation 2333.00 2334.00 17
2008-03-05 Remedial Casing Cementing 2333.00 2334.00 0
2008-02-10 Perforation 2540.00 2541.00 20
2008-03-06 Remedial Casing Cementing 2242.00 2243.00 0
2008-03-07 Perforation 2060.00 2061.00 17
2008-03-07 Perforation 1961.00 1962.00 17
2008-03-09 Packing Device Capped w/Cement 2037.50 2055.00 0
2008-03-10 Remedial Casing Cementing 1961.00 1962.00 0
2008-03-10 Cement Plug 1932.00 1950.00 0
2008-03-10 Perforation 1645.00 1646.00 17
2008-03-12 Remedial Casing Cementing 1645.00 1646.00 0
2008-03-12 Packing Device Capped w/Cement 1625.00 1635.00 0
2008-03-12 Perforation 1535.00 1536.00 17
2008-02-10 Remedial Casing Cementing 2712.00 2713.00 0
2008-03-12 Remedial Casing Cementing 1535.00 1536.00 0
2008-03-12 Packing Device Capped w/Cement 1518.00 1527.00 0
2008-03-13 Perforation 745.00 746.00 17
2008-03-13 Remedial Casing Cementing 745.00 746.00 0
2008-03-13 Packing Device Capped w/Cement 725.00 735.00 0
2008-03-14 Perforation 498.00 499.00 17
2008-03-14 Remedial Casing Cementing 498.00 499.00 0
2008-03-14 Packing Device Capped w/Cement 479.50 493.00 0
2008-02-11 Perforation 2642.00 2643.00 17
2008-02-11 Remedial Casing Cementing 2642.00 2643.00 0
2008-02-15 Perforation 2538.00 2539.00 17
2008-02-15 Perforation 2242.00 2243.00 17
2008-02-27 Perforation 2696.00 2697.00 17
2008-02-28 Packing Device Capped w/Cement 2682.00 2690.00 0

For data sources see[5]



References