X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645242304000

Well Details

Well ID: 0645242304000
Loading map...
Location: 00/04-23-064-24W5/0
Location Alias: 00/04-23-64-24 W5M
Location Alias 2: 00/04-23-064-24 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 24
Section: 23
County/Municipality: Municipal District of Greenview No. 16
Well Name: TANGLE CREEK WAHIGAN 4-23-64-24
Operator Name: Tangle Creek Energy Ltd.
License Number: 0487781
License Date: 2018-01-23
License Status: Issued
Spud Date: 2018-02-14
Final Drill Date: 2018-02-27
Well Total Depth: 4533.00 m
Surface Hole Latitude: 54.548250
Surface Hole Longitude: -117.492048

For data sources see[1][2]

Well History

Date Event
2018-01-23 Obtained License
2018-02-15 Surface Casing Operation Performed
2018-02-17 Direction Drilling Operation Performed - Deviate
2018-02-19 Direction Drilling Operation Performed - Horizontal
2018-02-20 Intermediate Casing Operation Performed
2018-02-27 Finished Drilling
2018-02-27 Well Mode changed to Drilled and Cased
2018-03-01 Liner Casing Operation Performed
2018-03-02 Rig Released
2018-09-06 Well Log Performed
2018-10-03 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-04 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-05 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-06 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-19 Well Began Production
2018-10-19 Well Fluid changed to Crude Oil
2018-10-19 Well Mode changed to Gas Lift

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-02-14 Trinidad Drilling Ltd. 59 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-02-17 1945.40 Deviate (5 - 79 degrees)
2018-02-19 2369.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-10-03 Multi-Stage Fracture 4501.50 4501.60 0
2018-10-04 Multi-Stage Fracture 4098.00 4098.10 0
2018-10-04 Multi-Stage Fracture 4053.00 4053.10 0
2018-10-04 Multi-Stage Fracture 4008.20 4008.30 0
2018-10-04 Multi-Stage Fracture 3963.10 3963.20 0
2018-10-04 Multi-Stage Fracture 3918.10 3918.20 0
2018-10-04 Multi-Stage Fracture 3873.00 3873.10 0
2018-10-04 Multi-Stage Fracture 3828.00 3828.10 0
2018-10-04 Multi-Stage Fracture 3782.90 3783.00 0
2018-10-04 Multi-Stage Fracture 3737.90 3738.00 0
2018-10-04 Multi-Stage Fracture 3693.10 3693.20 0
2018-10-04 Multi-Stage Fracture 4456.50 4456.60 0
2018-10-05 Multi-Stage Fracture 3648.40 3648.50 0
2018-10-05 Multi-Stage Fracture 3603.50 3603.60 0
2018-10-05 Multi-Stage Fracture 3557.50 3557.60 0
2018-10-05 Multi-Stage Fracture 3513.80 3513.90 0
2018-10-05 Multi-Stage Fracture 3468.70 3468.80 0
2018-10-05 Multi-Stage Fracture 3424.60 3424.70 0
2018-10-05 Multi-Stage Fracture 3379.70 3379.80 0
2018-10-05 Multi-Stage Fracture 3335.30 3335.40 0
2018-10-05 Multi-Stage Fracture 3290.90 3291.00 0
2018-10-05 Multi-Stage Fracture 3245.90 3246.00 0
2018-10-04 Multi-Stage Fracture 4411.70 4411.80 0
2018-10-05 Multi-Stage Fracture 3200.90 3201.00 0
2018-10-05 Multi-Stage Fracture 3155.80 3155.90 0
2018-10-05 Multi-Stage Fracture 3111.00 3111.10 0
2018-10-05 Multi-Stage Fracture 3066.00 3066.10 0
2018-10-05 Multi-Stage Fracture 3021.10 3021.20 0
2018-10-05 Multi-Stage Fracture 2976.10 2976.20 0
2018-10-05 Multi-Stage Fracture 2931.10 2931.20 0
2018-10-05 Multi-Stage Fracture 2886.30 2886.40 0
2018-10-05 Multi-Stage Fracture 2841.40 2841.50 0
2018-10-06 Multi-Stage Fracture 2797.10 2797.20 0
2018-10-04 Multi-Stage Fracture 4367.30 4367.40 0
2018-10-06 Multi-Stage Fracture 2752.70 2752.80 0
2018-10-06 Multi-Stage Fracture 2707.70 2707.80 0
2018-10-06 Multi-Stage Fracture 2662.90 2663.00 0
2018-10-06 Multi-Stage Fracture 2617.90 2618.00 0
2018-10-06 Multi-Stage Fracture 2586.30 2586.40 0
2018-10-06 Multi-Stage Fracture 2462.80 2462.90 0
2018-10-06 Multi-Stage Fracture 2431.20 2431.30 0
2018-10-04 Multi-Stage Fracture 4322.30 4322.40 0
2018-10-04 Multi-Stage Fracture 4277.30 4277.40 0
2018-10-04 Multi-Stage Fracture 4232.50 4232.60 0
2018-10-04 Multi-Stage Fracture 4187.50 4187.60 0
2018-10-04 Multi-Stage Fracture 4142.50 4142.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-10-03 2018-10-06 2,256 0 N/A
2 2018-10-06 2018-10-06 2,256 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water (Including Mix Water Supplied by Client)* 7732-18-5 100 83.4651 N/A
Slickwater Schlumberger Quartz. Crystalline silica 14808-60-7 100 7.9369 N/A
Slickwater Schlumberger Energizing Fluid 1.2.4 Trimethylbenzene (impurity) 95-63-6 100 0 N/A
1-Propanaminium. N-(3-aminopropyl)-2-hydroxy-N.N-dimethyl-3
-
68139-30-0 100 0.0082 N/A
2-Propen-1-aminium. N.N-dimethyl-N-2-propen-1-yl-. chloride 26062-79-3 100 0 N/A
2-Propenamid (impurity) 79-06-1 100 0 N/A
Acetic acid (impurity) 64-19-7 100 0.0012 N/A
Acetic acid. potassium salt 127-08-2 100 0 N/A
Acetophenone 98-86-2 100 0 N/A
Acrylamide. 2-acrylamido-2-methylpropanesulfonic
acid. sodiu
38193-60-1 100 0.0145 N/A
Alcohol. C11-14. ethoxylated 78330-21-9 100 0 N/A
Alcohol. C9-C11. Ethoxylated 68439-46-3 100 0.0001 N/A
Alcohols. C10-16. ethoxylated 68002-97-1 100 0 N/A
Alcohols. C7-9-iso-. C8-rich. ethoxylated 78330-19-5 100 0 N/A
Alcohols. C9-11-iso-. C10-rich. ethoxylated 78330-20-8 100 0 N/A
Amines. dicoco alkylmethyl 61788-62-3 100 0 N/A
Amines. tallow alkyl. ethoxylated 61791-26-2 100 0 N/A
Ammonium sulfate 7783-20-2 100 0.0197 N/A
Benzenemethanaminium. N.N-dimethyl-N tetradecyl-. chloride 139-08-2 100 0 N/A
Benzenemethanaminium. N-hexadecylN.N dimethyl-.chloride 122-18-9 100 0 N/A
benzododecinium chloride 139-07-1 100 0 N/A
Cinnamaldehyde 104-55-2 100 0.0001 N/A
Copper(II) sulfate 7758-98-7 100 0 N/A
Decamethyl cyclopentasiloxane 541-02-6 100 0 N/A
Dicoco dimethyl quaternary ammonium chloride 61789-77-3 100 0 N/A
Dimethyl siloxanes and silicones 63148-62-9 100 0 N/A
Disodium hydroxyethylethylenediaminediacetate (impurity) 62099-15-4 100 0 N/A
Dodecamethylcyclohexasiloxane 540-97-6 100 0 N/A
Ethoxylated propoxylated 4-nonylphenol-formaldehyde resin 30846-35-6 100 0 N/A
Formaldehyde (impurity) 50-00-0 100 0 N/A
Glycine. N-[2-[bis(carboxymethyl)amino]ethyl]-N-(2-hydroxye
t
139-89-9 100 0.0016 N/A
Hydrochloric acid 7647-01-0 100 0.063 N/A
Methanol 67-56-1 100 0.0153 N/A
N-Coco. 1.3-diaminopropane di-acetate 61791-64-8 100 0.0028 N/A
Naphthalene (Impurity) 91-20-3 100 0 N/A
Nitrilotriacetic acid trisodium salt (Impurity) 5064-31-3 100 0 N/A
Octamethylcyclotetrasiloxane 556-67-2 100 0 N/A
Oxirane. Methyl-. polymer with Oxirane 11/6/9003 100 0.0001 N/A
Poly(oxy-1.2-ethanediyl).a-hydro-w-hydroxy-
Ethane-1.2-diol.
25322-68-3 100 0 N/A
Polyethylene glycol monohexyl ether 31726-34-8 100 0.0035 N/A
Polymer of 2-acrylamido-2-methylpropanesulfonic acid sodium 136793-29-8 100 0.0015 N/A
Potassium oleate 143-18-0 100 0 N/A
Propan-2-ol 67-63-0 100 0 N/A
Propane-1.2-diol 57-55-6 100 0.0005 N/A
Reaction product of: acetophenone.
formaldehyde. cyclohexyla
224635-63-6 100 0.0002 N/A
Silicon Dioxide 7631-86-9 100 0.0001 N/A
Siloxanes and silicones. dimethyl.
reaction products with si
67762-90-7 100 0 N/A
Sodium 1.4-bis[(2-ethylhexyl)oxy]-1.4-dioxobutane-2-sulfona
t
577-11-7 100 0.0026 N/A
Sodium chloride 7647-14-5 100 0.0012 N/A
Sodium Glycolate (impurity) 2836-32-0 100 0 N/A
Sodium hydroxide (impurity) 1310-73-2 100 0 N/A
Sodium sulfate 7757-82-6 100 0.0002 N/A
Solvent naphtha (petroleum). heavy arom. 64742-94-5 100 0 N/A
Tetrasodium ethylenediaminetetraacetate 64-02-8 100 0 N/A
Urea 57-13-6 100 0.0009 N/A
2 Slickwater Schlumberger Energizing Fluid Phenolic resin 9003-35-4 100 0.0664 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-11-03 2018-11-06 Oilfield Produced Water 8943

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 1756 0.0 0.0 0.0
2019 8587 0.0 0.0 0.0
2020 2168 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-03-02 No Incident Encountered 0.00 0.00
2018-10-15 No Incident Encountered 0.00 0.00

For data sources see[10]

References