If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0645200308002 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 00/08-03-064-20W5/2 | |
Location Alias: 00/08-03-64-20 W5M | |
Location Alias 2: 00/08-03-064-20 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 064 | |
Meridian: 5 | |
Range: 20 | |
Section: 03 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: TRILOGY KAYBOB 8-3-64-20 | |
Operator Name: Paramount Resources Ltd. | |
License Number: 0095299 | |
License Date: 1982-02-26 | |
License Status: Issued | |
Spud Date: 1982-03-04 | |
Final Drill Date: 1982-03-19 | |
Well Total Depth: 1885.00 m | |
Surface Hole Latitude: 54.507164 | |
Surface Hole Longitude: -116.930815 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1982-02-26 | Obtained License |
1982-03-12 | Drill Stem Test Performed |
1982-03-18 | Drill Stem Test Performed |
1982-03-19 | Finished Drilling |
1982-03-20 | Well Log Performed |
1982-03-21 | Drill Stem Test Performed |
1982-03-24 | Production Casing Operation Performed |
1982-03-24 | Rig Released |
1982-10-13 | Well Mode changed to Drilled and Cased |
1998-02-01 | Well Log Performed |
1998-02-03 | Perforation Treatment Performed - Jet Perforation |
1998-02-03 | Well Log Performed |
1998-02-08 | Perforation Treatment Performed - Fractured |
1999-02-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-02-18 | Plug Back Performed |
1999-02-18 | Well Log Performed |
1999-02-19 | Perforation Treatment Performed - Jet Perforation |
1999-02-21 | Perforation Treatment Performed - Fractured |
1999-03-27 | Well Began Production |
1999-03-27 | Well Fluid changed to Gas |
1999-03-27 | Well Mode changed to Flowing |
2002-12-01 | Well Fluid changed to Gas |
2002-12-01 | Well Mode changed to Pumping |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1998-02-03 | Perforation | 1565.50 | 1568.50 | 20 |
1998-02-08 | Fracture | 1565.50 | 1568.50 | 0 |
1999-02-18 | Packing Device Capped w/Cement | 1554.00 | 1562.00 | 0 |
1999-02-19 | Perforation | 1546.50 | 1549.00 | 17 |
1999-02-21 | Fracture | 1546.50 | 1549.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1998 | 4204 | 0.0 | 0.0 | 0.0 |
1999 | 6730 | 0.0 | 0.0 | 0.0 |
2000 | 8284 | 0.0 | 0.0 | 0.0 |
2001 | 8632 | 0.0 | 0.0 | 0.0 |
2002 | 8032 | 0.0 | 0.0 | 0.0 |
2003 | 8057 | 0.0 | 0.0 | 0.0 |
2004 | 8681 | 0.0 | 0.0 | 0.0 |
2005 | 8518 | 0.0 | 0.0 | 0.0 |
2006 | 8543 | 0.0 | 0.0 | 0.0 |
2007 | 8759 | 0.0 | 0.0 | 0.0 |
2008 | 8639 | 0.0 | 0.0 | 0.0 |
2009 | 8351 | 0.0 | 0.0 | 0.0 |
2010 | 8687 | 0.0 | 0.0 | 0.0 |
2011 | 8759 | 0.0 | 0.0 | 0.0 |
2012 | 8783 | 0.0 | 0.0 | 0.0 |
2013 | 8351 | 0.0 | 0.0 | 0.0 |
2014 | 6657 | 0.0 | 0.0 | 0.0 |
2015 | 4381 | 0.0 | 0.0 | 0.0 |
2016 | 4594 | 0.0 | 0.0 | 0.0 |
2017 | 4460 | 0.0 | 0.0 | 0.0 |
2018 | 5869 | 0.0 | 0.0 | 0.0 |
2019 | 4029 | 0.0 | 0.0 | 0.0 |
2020 | 1944 | 0.0 | 0.0 | 0.0 |
For data sources see[5]