X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645190908000

Well Details

Well ID: 0645190908000
Loading map...
Location: 00/08-09-064-19W5/0
Location Alias: 00/08-09-64-19 W5M
Location Alias 2: 00/08-09-064-19 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 19
Section: 09
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY BHLU 1 KAYBOB 8-9-64-19
Operator Name: Paramount Resources Ltd.
License Number: 0131683
License Date: 1988-01-26
License Status: Amended
Spud Date: 1988-01-26
Final Drill Date: 1988-03-04
Well Total Depth: 3050.00 m
Surface Hole Latitude: 54.521023
Surface Hole Longitude: -116.804415

For data sources see[1][2]

Well History

Date Event
1988-01-26 Obtained License
1988-01-30 Surface Casing Operation Performed
1988-02-06 Drill Stem Test Performed
1988-02-12 Direction Drilling Operation Performed - Deviate
1988-03-04 Finished Drilling
1988-03-04 Well Mode changed to Drilled and Cased
1988-03-05 Well Log Performed
1988-03-07 Well Log Performed
1988-03-09 Production Casing Operation Performed
1988-03-09 Rig Released
1988-03-11 Well Log Performed
1988-07-18 Perforation Treatment Performed - Jet Perforation
1988-07-18 Well Log Performed
1988-07-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-07-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-07-25 Well Began Production
1988-07-25 Well Fluid changed to Crude Oil
1988-07-25 Well Mode changed to Flowing
1988-08-09 Well Log Performed
1988-12-22 Perforation Treatment Performed - Jet Perforation
1991-01-29 Well Log Performed
1991-08-28 Well Log Performed
1995-03-23 Well Fluid changed to Crude Oil
1995-03-23 Well Mode changed to Suspended
1997-11-01 Well Fluid changed to Crude Oil
1997-11-01 Well Mode changed to Flowing
1998-07-01 Well Fluid changed to Crude Oil
1998-07-01 Well Mode changed to Suspended
2009-05-15 Perforation Treatment Performed - Cement Squeeze

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1988-02-12 2100.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-07-18 Perforation 2981.00 2991.00 11
1988-07-18 Perforation 2993.00 2994.00 14
1988-07-18 Perforation 2998.00 3002.00 12
1988-07-18 Perforation 3006.00 3007.50 13
1988-07-18 Perforation 3009.50 3013.50 12
1988-07-23 Acid Treatment 3006.00 3013.50 0
1988-07-24 Acid Treatment 2981.00 3002.00 0
1988-12-22 Perforation 2989.30 2990.00 13
2009-05-15 Cement Squeeze 2981.00 3013.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 378 0.0 0.0 0.0
1989 7960 0.0 0.0 0.0
1990 7708 0.0 0.0 0.0
1991 7036 0.0 0.0 0.0
1992 5429 0.0 0.0 0.0
1993 8636 0.0 0.0 0.0
1994 8359 0.0 0.0 0.0
1995 1925 0.0 0.0 0.0
1997 96 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-10-01 No Incident Encountered 0.00 0.00

For data sources see[7]

References