X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645190102020

Well Details

Well ID: 0645190102020
Loading map...
Location: 02/02-01-064-19W5/0
Location Alias: 02/02-01-64-19 W5M
Location Alias 2: 02/02-01-064-19 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 19
Section: 01
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY 102 HZ KAYBOB 2-1-64-19
Operator Name: Paramount Resources Ltd.
License Number: 0479623
License Date: 2016-06-07
License Status: Issued
Spud Date: 2016-08-18
Final Drill Date: 2016-09-19
Well Total Depth: 3441.00 m
Surface Hole Latitude: 54.517026
Surface Hole Longitude: -116.732167

For data sources see[1][2]

Well History

Date Event
2016-06-07 Obtained License
2016-08-19 Surface Casing Operation Performed
2016-09-14 Direction Drilling Operation Performed - Deviate
2016-09-17 Direction Drilling Operation Performed - Horizontal
2016-09-17 Intermediate Casing Operation Performed
2016-09-19 Finished Drilling
2016-09-19 Well Log Performed
2016-09-19 Well Mode changed to Drilled and Cased
2016-09-20 Liner Casing Operation Performed
2016-09-20 Well Log Performed
2016-09-21 Rig Released
2016-10-15 Perforation Treatment Performed - Multi-Stage Fracture
2016-10-15 Perforation Treatment Performed - Open-Hole Completion
2016-10-17 Well Began Production
2016-10-17 Well Fluid changed to Crude Oil
2016-10-17 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-09-14 Precision Drilling Corporation 391 N/A Drill To LD
2016-08-18 Precision Drilling Corporation 182 N/A Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-09-14 779.90 Deviate (5 - 79 degrees)
2016-09-17 2008.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-10-15 Open Hole/Barefoot Completion 3432.90 3441.00 0
2016-10-15 Multi-Stage Fracture 2864.80 2864.90 0
2016-10-15 Multi-Stage Fracture 2781.20 2781.30 0
2016-10-15 Multi-Stage Fracture 2708.70 2708.80 0
2016-10-15 Multi-Stage Fracture 2637.90 2638.00 0
2016-10-15 Multi-Stage Fracture 2567.80 2567.90 0
2016-10-15 Multi-Stage Fracture 2496.20 2496.30 0
2016-10-15 Multi-Stage Fracture 2425.10 2425.20 0
2016-10-15 Multi-Stage Fracture 2354.80 2354.90 0
2016-10-15 Multi-Stage Fracture 2286.10 2286.20 0
2016-10-15 Multi-Stage Fracture 2213.50 2213.60 0
2016-10-15 Multi-Stage Fracture 3417.60 3417.70 0
2016-10-15 Multi-Stage Fracture 2132.60 2132.70 0
2016-10-15 Multi-Stage Fracture 2063.80 2063.90 0
2016-10-15 Multi-Stage Fracture 2008.70 2008.80 0
2016-10-15 Multi-Stage Fracture 3366.70 3366.80 0
2016-10-15 Multi-Stage Fracture 3297.50 3297.60 0
2016-10-15 Multi-Stage Fracture 3226.10 3226.20 0
2016-10-15 Multi-Stage Fracture 3143.50 3143.60 0
2016-10-15 Multi-Stage Fracture 3074.30 3074.40 0
2016-10-15 Multi-Stage Fracture 3003.70 3003.80 0
2016-10-15 Multi-Stage Fracture 2935.10 2935.20 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-10-15 2016-10-15 1,839 1,449 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 6.1026 N/A
water Not Available 100 72.3698 N/A
Sand - Tier 2 (20/40) Trican silica crystalline 14808-60-7 100 21.1776 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0122 N/A
2-mercaptoethanol 60-24-2 100 0.0122 N/A
dibromoacetonitrile 3252-43-5 100 0.0122 N/A
non-hazardous ingredients Not Available 100 0.0122 N/A
sodium bromide 7647-15-6 100 0.0122 N/A
GBO-1 Trican Breaker sodium perborate tetrahydrate 10486-00-7 100 0.0169 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.0807 N/A
non-hazardous ingredients Not Available 100 0.0807 N/A
DF-2W Trican Defoamer non-hazardous ingredients Not Available 100 0.0037 N/A
propylene glycol 57-55-6 100 0.0037 N/A
GFR-5D Trican Friction Reducer anionic polyacrylamide Not Available 100 0.153 N/A
S-17W Trican Surfactant ethylene/propylene oxide polymer Not Available 100 0.0208 N/A
methanol 67-56-1 100 0.0208 N/A
water Not Available 100 0.0208 N/A
SS-7 Trican Surfactant aliphatic alcohol 9338 100 0.0622 N/A
aminofunctional polymer 9338 100 0.0622 N/A
distillates (petroleum). sweet medium 64741-86-2 100 0.0622 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-10-15 2016-10-15 Surface Water - Runoff 1579

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 789 0.0 0.0 0.0
2017 8452 0.0 0.0 0.0
2018 8561 0.0 0.0 0.0
2019 8450 0.0 0.0 0.0
2020 2173 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-09-21 No Incident Encountered 0.00 0.00
2016-10-19 No Incident Encountered 0.00 0.00

For data sources see[10]

References