If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0645181815000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.529584,"lon":-116.70474,"icon":""}]} |
| Location: 00/15-18-064-18W5/0 | |
| Location Alias: 00/15-18-64-18 W5M | |
| Location Alias 2: 00/15-18-064-18 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 064 | |
| Meridian: 5 | |
| Range: 18 | |
| Section: 18 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: TRILOGY HZ KAYBOB 15-18-64-18 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0437213 | |
| License Date: 2011-09-28 | |
| License Status: Suspension | |
| Spud Date: 2012-08-12 | |
| Final Drill Date: 2012-08-27 | |
| Well Total Depth: 3558.00 m | |
| Surface Hole Latitude: 54.529584 | |
| Surface Hole Longitude: -116.704740 |
| Date | Event |
|---|---|
| 2011-09-28 | Obtained License |
| 2012-08-15 | Surface Casing Operation Performed |
| 2012-08-16 | Direction Drilling Operation Performed - Deviate |
| 2012-08-20 | Direction Drilling Operation Performed - Horizontal |
| 2012-08-21 | Intermediate Casing Operation Performed |
| 2012-08-27 | Finished Drilling |
| 2012-08-27 | Well Log Performed |
| 2012-08-27 | Well Mode changed to Drilled and Cased |
| 2012-08-29 | Liner Casing Operation Performed |
| 2012-08-30 | Rig Released |
| 2012-09-05 | Well Log Performed |
| 2012-09-13 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-09-13 | Perforation Treatment Performed - Open-Hole Completion |
| 2012-09-17 | Well Began Production |
| 2012-09-17 | Well Fluid changed to Crude Oil |
| 2012-09-17 | Well Mode changed to Flowing |
| 2013-01-10 | Well Fluid changed to Crude Oil |
| 2013-01-10 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-08-12 | Precision Drilling Corporation | 225 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-08-16 | 656.70 | Deviate (5 - 79 degrees) |
| 2012-08-20 | 1972.10 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-09-13 | Open Hole/Barefoot Completion | 3553.00 | 3558.00 | 0 |
| 2012-09-13 | Multi-Stage Fracture | 2972.50 | 2972.60 | 0 |
| 2012-09-13 | Multi-Stage Fracture | 2897.80 | 2897.90 | 0 |
| 2012-09-13 | Multi-Stage Fracture | 2823.30 | 2823.40 | 0 |
| 2012-09-13 | Multi-Stage Fracture | 2750.10 | 2750.20 | 0 |
| 2012-09-13 | Multi-Stage Fracture | 2675.60 | 2675.70 | 0 |
| 2012-09-13 | Multi-Stage Fracture | 2601.00 | 2601.10 | 0 |
| 2012-09-13 | Multi-Stage Fracture | 2526.40 | 2526.50 | 0 |
| 2012-09-13 | Multi-Stage Fracture | 2452.20 | 2452.30 | 0 |
| 2012-09-13 | Multi-Stage Fracture | 2378.00 | 2378.10 | 0 |
| 2012-09-13 | Multi-Stage Fracture | 2303.70 | 2303.80 | 0 |
| 2012-09-13 | Multi-Stage Fracture | 3541.30 | 3541.40 | 0 |
| 2012-09-13 | Multi-Stage Fracture | 2229.30 | 2229.40 | 0 |
| 2012-09-13 | Multi-Stage Fracture | 2155.00 | 2155.10 | 0 |
| 2012-09-13 | Multi-Stage Fracture | 2082.10 | 2082.20 | 0 |
| 2012-09-13 | Multi-Stage Fracture | 2021.50 | 2021.60 | 0 |
| 2012-09-13 | Multi-Stage Fracture | 3492.70 | 3492.80 | 0 |
| 2012-09-13 | Multi-Stage Fracture | 3419.50 | 3419.60 | 0 |
| 2012-09-13 | Multi-Stage Fracture | 3344.80 | 3344.90 | 0 |
| 2012-09-13 | Multi-Stage Fracture | 3270.50 | 3270.60 | 0 |
| 2012-09-13 | Multi-Stage Fracture | 3195.80 | 3195.90 | 0 |
| 2012-09-13 | Multi-Stage Fracture | 3121.00 | 3121.10 | 0 |
| 2012-09-13 | Multi-Stage Fracture | 3047.20 | 3047.30 | 0 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 840 | 0.0 | 0.0 | 0.0 |
| 2013 | 5514 | 0.0 | 0.0 | 0.0 |
| 2014 | 6458 | 0.0 | 0.0 | 0.0 |
| 2015 | 4150 | 0.0 | 0.0 | 0.0 |
| 2018 | 1648 | 0.0 | 0.0 | 0.0 |
| 2019 | 270 | 0.0 | 0.0 | 0.0 |
| 2020 | 76 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-08-30 | No Incident Encountered | 0.00 | 0.00 |
| 2012-09-16 | No Incident Encountered | 0.00 | 0.00 |
| 2012-11-08 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]