If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0645181704020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.531251,"lon":-116.669568,"icon":""}]} |
| Location: 02/04-17-064-18W5/0 | |
| Location Alias: 02/04-17-64-18 W5M | |
| Location Alias 2: 02/04-17-064-18 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 064 | |
| Meridian: 5 | |
| Range: 18 | |
| Section: 17 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: TRILOGY 102 HZ KAYBOB 4-17-64-18 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0449899 | |
| License Date: 2012-11-08 | |
| License Status: Amended | |
| Spud Date: 2013-01-08 | |
| Final Drill Date: 2013-01-22 | |
| Well Total Depth: 3671.00 m | |
| Surface Hole Latitude: 54.531251 | |
| Surface Hole Longitude: -116.669568 |
| Date | Event |
|---|---|
| 2012-11-08 | Obtained License |
| 2013-01-10 | Surface Casing Operation Performed |
| 2013-01-12 | Direction Drilling Operation Performed - Deviate |
| 2013-01-17 | Intermediate Casing Operation Performed |
| 2013-01-18 | Direction Drilling Operation Performed - Horizontal |
| 2013-01-22 | Finished Drilling |
| 2013-01-22 | Well Log Performed |
| 2013-01-22 | Well Mode changed to Drilled and Cased |
| 2013-01-23 | Well Log Performed |
| 2013-01-24 | Liner Casing Operation Performed |
| 2013-01-25 | Rig Released |
| 2013-01-29 | Well Log Performed |
| 2013-02-02 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2013-02-02 | Perforation Treatment Performed - Open-Hole Completion |
| 2013-02-09 | Well Began Production |
| 2013-02-09 | Well Fluid changed to Crude Oil |
| 2013-02-09 | Well Mode changed to Flowing |
| 2013-02-22 | Well Fluid changed to Crude Oil |
| 2013-02-22 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2013-01-08 | Precision Drilling Corporation | 225 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2013-01-12 | 665.90 | Deviate (5 - 79 degrees) |
| 2013-01-18 | 2059.10 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2013-02-02 | Open Hole/Barefoot Completion | 3668.00 | 3671.00 | 0 |
| 2013-02-02 | Multi-Stage Fracture | 3081.40 | 3081.50 | 0 |
| 2013-02-02 | Multi-Stage Fracture | 3008.70 | 3008.80 | 0 |
| 2013-02-02 | Multi-Stage Fracture | 2936.00 | 2936.10 | 0 |
| 2013-02-02 | Multi-Stage Fracture | 2864.10 | 2864.20 | 0 |
| 2013-02-02 | Multi-Stage Fracture | 2791.00 | 2791.10 | 0 |
| 2013-02-02 | Multi-Stage Fracture | 2719.20 | 2719.30 | 0 |
| 2013-02-02 | Multi-Stage Fracture | 2631.10 | 2631.20 | 0 |
| 2013-02-02 | Multi-Stage Fracture | 2558.30 | 2558.40 | 0 |
| 2013-02-02 | Multi-Stage Fracture | 2484.90 | 2485.00 | 0 |
| 2013-02-02 | Multi-Stage Fracture | 2412.80 | 2412.90 | 0 |
| 2013-02-02 | Multi-Stage Fracture | 3645.20 | 3645.30 | 0 |
| 2013-02-02 | Multi-Stage Fracture | 2341.30 | 2341.40 | 0 |
| 2013-02-02 | Multi-Stage Fracture | 2268.00 | 2268.10 | 0 |
| 2013-02-02 | Multi-Stage Fracture | 2193.60 | 2193.70 | 0 |
| 2013-02-02 | Multi-Stage Fracture | 2120.30 | 2120.40 | 0 |
| 2013-02-02 | Multi-Stage Fracture | 2059.90 | 2060.00 | 0 |
| 2013-02-02 | Multi-Stage Fracture | 3597.00 | 3597.10 | 0 |
| 2013-02-02 | Multi-Stage Fracture | 3524.20 | 3524.30 | 0 |
| 2013-02-02 | Multi-Stage Fracture | 3450.40 | 3450.50 | 0 |
| 2013-02-02 | Multi-Stage Fracture | 3375.80 | 3375.90 | 0 |
| 2013-02-02 | Multi-Stage Fracture | 3301.10 | 3301.20 | 0 |
| 2013-02-02 | Multi-Stage Fracture | 3227.70 | 3227.80 | 0 |
| 2013-02-02 | Multi-Stage Fracture | 3154.30 | 3154.40 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2013-02-02 | 2013-02-02 | 1,834 | 0 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Oil | Not Available | 100 | 64.8597 | N/A | |||
| 20/40 WinnBay Sand (Domestic) | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 23.0283 | N/A | ||
| DHP-202 | Calfrac | Activator | Non-Hazardous Ingredients | Trade Secret | 100 | 0.6623 | N/A | |
| Sulfuric acid | 7664-93-9 | 100 | 0.6768 | N/A | ||||
| Sulfuric acid. iron(2+) salt (1:?) | 16547-58-3 | 100 | 0.6623 | N/A | ||||
| DHP-903 | Calfrac | Breaker | 1-Hexanol. 2-ethyl- | 104-76-7 | 100 | 0.4204 | N/A | |
| Ethanol. 2.2'-iminobis- | 111-42-2 | 100 | 0.4321 | N/A | ||||
| Fatty Amine #1 | 8842 | 100 | 0.4089 | N/A | ||||
| Fatty Amine #2 | 8842 | 100 | 0.4089 | N/A | ||||
| Magnesium oxide (MgO) | 1309-48-4 | 100 | 0.4117 | N/A | ||||
| Non-Hazardous Ingredients | Trade Secret | 100 | 0.4102 | N/A | ||||
| Nitrogen | Calfrac | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 10.2453 | N/A | |
| DHP-201 | Calfrac | Gelling Agent | 1-Decanol | 112-30-1 | 100 | 0.8188 | N/A | |
| 1-Octanol | 111-87-5 | 100 | 0.8188 | N/A | ||||
| Phosphoric acid. mixed decyl and Et and octyl esters | 68412-60-2 | 100 | 0.7994 | N/A |
For data sources see[7]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2013 | 6892 | 0.0 | 0.0 | 0.0 |
| 2014 | 6235 | 0.0 | 0.0 | 0.0 |
| 2015 | 8411 | 0.0 | 0.0 | 0.0 |
| 2016 | 7340 | 0.0 | 0.0 | 0.0 |
| 2017 | 3104 | 0.0 | 0.0 | 0.0 |
| 2018 | 668 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2013-01-26 | No Incident Encountered | 0.00 | 0.00 |
| 2013-02-06 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]