X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645181402002

Well Details

Well ID: 0645181402002
Loading map...
Location: 00/02-14-064-18W5/2
Location Alias: 00/02-14-64-18 W5M
Location Alias 2: 00/02-14-064-18 W5/02
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 18
Section: 14
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY KAYBOB 2-14-64-18
Operator Name: Paramount Resources Ltd.
License Number: 0025550
License Date: 1964-01-22
License Status: Suspension
Spud Date: 1964-01-24
Final Drill Date: 1964-02-29
Well Total Depth: 3011.70 m
Surface Hole Latitude: 54.532982
Surface Hole Longitude: -116.606434

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-01-22 Obtained License
1964-02-11 Drill Stem Test Performed
1964-02-15 Drill Stem Test Performed
1964-02-29 Finished Drilling
1964-02-29 Well Mode changed to Drilled and Cased
1964-03-01 Drill Stem Test Performed
1964-03-08 Production Casing Operation Performed
1995-09-23 Well Log Performed
1995-09-24 Well Log Performed
1995-09-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-09-25 Perforation Treatment Performed - Jet Perforation
1995-09-25 Well Log Performed
1995-09-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-09-26 Perforation Treatment Performed - Jet Perforation
1995-09-29 Well Log Performed
2000-02-15 Perforation Treatment Performed - Jet Perforation
2000-02-15 Well Log Performed
2000-02-19 Perforation Treatment Performed - Fractured
2000-04-06 Well Began Production
2000-04-06 Well Fluid changed to Gas
2000-04-06 Well Mode changed to Flowing
2002-01-18 Well Log Performed
2002-01-19 Well Log Performed
2002-01-20 Perforation Treatment Performed - Jet Perforation
2002-01-20 Well Log Performed
2003-06-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-06-19 Plug Back Performed
2003-06-19 Well Fluid changed to Gas
2003-06-19 Well Mode changed to Abandoned Zone
2003-06-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-06-20 Plug Back Performed
2003-06-21 Perforation Treatment Performed - Jet Perforation
2003-06-25 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-09-25 Perforation 1836.00 1836.50 28
2003-06-20 Packing Device Capped w/Cement 2287.00 2295.00 0
2003-06-21 Perforation 1817.00 1822.00 17
2003-06-25 Fracture 1817.00 1822.00 0
1995-09-25 Acid Treatment 1836.00 1836.50 0
1995-09-26 Packing Device Capped w/Cement 1833.00 1834.00 0
1995-09-26 Perforation 1816.00 1821.00 20
1995-09-26 Perforation 1813.50 1815.00 20
2000-02-15 Perforation 2953.50 2958.40 17
2000-02-19 Fracture 2953.50 2958.40 0
2002-01-20 Perforation 2301.50 2303.50 15
2003-06-19 Packing Device Capped w/Cement 2941.00 2949.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 3216 0.0 0.0 0.0
2001 785 0.0 0.0 0.0

For data sources see[5]

References