X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645181102020

Well Details

Well ID: 0645181102020
Loading map...
Location: 02/02-11-064-18W5/0
Location Alias: 02/02-11-64-18 W5M
Location Alias 2: 02/02-11-064-18 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 18
Section: 11
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY HZ 102 KAYBOB 2-11-64-18
Operator Name: Paramount Resources Ltd.
License Number: 0434787
License Date: 2011-07-04
License Status: Issued
Spud Date: 2011-08-12
Final Drill Date: 2011-08-29
Well Total Depth: 3577.00 m
Surface Hole Latitude: 54.530973
Surface Hole Longitude: -116.604624

For data sources see[1][2]

Well History

Date Event
2011-07-04 Obtained License
2011-07-12 Well Log Performed
2011-08-12 Well Log Performed
2011-08-16 Surface Casing Operation Performed
2011-08-18 Well Log Performed
2011-08-23 Direction Drilling Operation Performed - Horizontal
2011-08-24 Intermediate Casing Operation Performed
2011-08-29 Finished Drilling
2011-08-29 Well Mode changed to Drilled and Cased
2011-09-02 Liner Casing Operation Performed
2011-09-04 Rig Released
2011-09-09 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-09 Perforation Treatment Performed - Open-Hole Completion
2011-09-14 Well Log Performed
2011-09-27 Well Began Production
2011-09-27 Well Fluid changed to Crude Oil
2011-09-27 Well Mode changed to Flowing
2011-10-20 Well Fluid changed to Crude Oil
2011-10-20 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-08-23 1964.90 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-09 Open Hole/Barefoot Completion 3572.00 3577.00 0
2011-09-09 Multi-Stage Fracture 2978.50 2978.60 0
2011-09-09 Multi-Stage Fracture 2902.30 2902.40 0
2011-09-09 Multi-Stage Fracture 2826.50 2826.60 0
2011-09-09 Multi-Stage Fracture 2750.20 2750.30 0
2011-09-09 Multi-Stage Fracture 2673.00 2673.10 0
2011-09-09 Multi-Stage Fracture 2610.40 2610.50 0
2011-09-09 Multi-Stage Fracture 2534.60 2534.70 0
2011-09-09 Multi-Stage Fracture 2460.10 2460.20 0
2011-09-09 Multi-Stage Fracture 2385.50 2385.60 0
2011-09-09 Multi-Stage Fracture 2310.40 2310.50 0
2011-09-09 Multi-Stage Fracture 3562.60 3562.70 0
2011-09-09 Multi-Stage Fracture 2235.50 2235.60 0
2011-09-09 Multi-Stage Fracture 2161.50 2161.60 0
2011-09-09 Multi-Stage Fracture 2086.40 2086.50 0
2011-09-09 Multi-Stage Fracture 2025.00 2025.10 0
2011-09-09 Multi-Stage Fracture 3498.50 3498.60 0
2011-09-09 Multi-Stage Fracture 3421.70 3421.80 0
2011-09-09 Multi-Stage Fracture 3345.10 3345.20 0
2011-09-09 Multi-Stage Fracture 3282.40 3282.50 0
2011-09-09 Multi-Stage Fracture 3205.40 3205.50 0
2011-09-09 Multi-Stage Fracture 3130.00 3130.10 0
2011-09-09 Multi-Stage Fracture 3052.80 3052.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1114 0.0 0.0 0.0
2012 7195 0.0 0.0 0.0
2013 8274 0.0 0.0 0.0
2014 8058 0.0 0.0 0.0
2015 7829 0.0 0.0 0.0
2016 4546 0.0 0.0 0.0
2017 3432 0.0 0.0 0.0
2018 7906 0.0 0.0 0.0
2019 4890 0.0 0.0 0.0
2020 1291 0.0 0.0 0.0

For data sources see[6]

References