If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0645181004020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.530982,"lon":-116.641263,"icon":""}]} |
| Location: 02/04-10-064-18W5/0 | |
| Location Alias: 02/04-10-64-18 W5M | |
| Location Alias 2: 02/04-10-064-18 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 064 | |
| Meridian: 5 | |
| Range: 18 | |
| Section: 10 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: TRILOGY HZ 102 KAYBOB 4-10-64-18 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0440319 | |
| License Date: 2011-12-05 | |
| License Status: Issued | |
| Spud Date: 2012-02-13 | |
| Final Drill Date: 2012-02-26 | |
| Well Total Depth: 3606.00 m | |
| Surface Hole Latitude: 54.530982 | |
| Surface Hole Longitude: -116.641263 |
| Date | Event |
|---|---|
| 2011-12-05 | Obtained License |
| 2012-02-15 | Surface Casing Operation Performed |
| 2012-02-16 | Well Log Performed |
| 2012-02-20 | Direction Drilling Operation Performed - Horizontal |
| 2012-02-21 | Intermediate Casing Operation Performed |
| 2012-02-26 | Finished Drilling |
| 2012-02-26 | Well Log Performed |
| 2012-02-26 | Well Mode changed to Drilled and Cased |
| 2012-02-27 | Liner Casing Operation Performed |
| 2012-02-29 | Rig Released |
| 2012-03-08 | Well Log Performed |
| 2012-03-17 | Well Log Performed |
| 2012-06-15 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-06-15 | Perforation Treatment Performed - Open-Hole Completion |
| 2012-06-20 | Well Began Production |
| 2012-06-20 | Well Fluid changed to Crude Oil |
| 2012-06-20 | Well Mode changed to Flowing |
| 2012-07-15 | Well Fluid changed to Crude Oil |
| 2012-07-15 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-02-13 | Ensign Drilling Inc. | 45 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-02-20 | 1995.20 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-06-15 | Open Hole/Barefoot Completion | 3601.00 | 3606.00 | 0 |
| 2012-06-15 | Multi-Stage Fracture | 3000.20 | 3000.30 | 0 |
| 2012-06-15 | Multi-Stage Fracture | 2928.10 | 2928.20 | 0 |
| 2012-06-15 | Multi-Stage Fracture | 2856.50 | 2856.60 | 0 |
| 2012-06-15 | Multi-Stage Fracture | 2777.10 | 2777.20 | 0 |
| 2012-06-15 | Multi-Stage Fracture | 2702.40 | 2702.50 | 0 |
| 2012-06-15 | Multi-Stage Fracture | 2627.50 | 2627.60 | 0 |
| 2012-06-15 | Multi-Stage Fracture | 2553.00 | 2553.10 | 0 |
| 2012-06-15 | Multi-Stage Fracture | 2478.10 | 2478.20 | 0 |
| 2012-06-15 | Multi-Stage Fracture | 2414.60 | 2414.70 | 0 |
| 2012-06-15 | Multi-Stage Fracture | 2341.60 | 2341.70 | 0 |
| 2012-06-15 | Multi-Stage Fracture | 3577.50 | 3577.60 | 0 |
| 2012-06-15 | Multi-Stage Fracture | 2255.80 | 2255.90 | 0 |
| 2012-06-15 | Multi-Stage Fracture | 2188.10 | 2188.20 | 0 |
| 2012-06-15 | Multi-Stage Fracture | 2113.00 | 2113.10 | 0 |
| 2012-06-15 | Multi-Stage Fracture | 2053.40 | 2053.50 | 0 |
| 2012-06-15 | Multi-Stage Fracture | 3527.20 | 3527.30 | 0 |
| 2012-06-15 | Multi-Stage Fracture | 3451.70 | 3451.80 | 0 |
| 2012-06-15 | Multi-Stage Fracture | 3375.10 | 3375.20 | 0 |
| 2012-06-15 | Multi-Stage Fracture | 3302.10 | 3302.20 | 0 |
| 2012-06-15 | Multi-Stage Fracture | 3229.40 | 3229.50 | 0 |
| 2012-06-15 | Multi-Stage Fracture | 3157.40 | 3157.50 | 0 |
| 2012-06-15 | Multi-Stage Fracture | 3071.80 | 3071.90 | 0 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 3347 | 0.0 | 0.0 | 0.0 |
| 2013 | 6214 | 0.0 | 0.0 | 0.0 |
| 2014 | 8252 | 0.0 | 0.0 | 0.0 |
| 2015 | 8568 | 0.0 | 0.0 | 0.0 |
| 2016 | 8393 | 0.0 | 0.0 | 0.0 |
| 2017 | 8303 | 0.0 | 0.0 | 0.0 |
| 2018 | 8161 | 0.0 | 0.0 | 0.0 |
| 2019 | 6338 | 0.0 | 0.0 | 0.0 |
| 2020 | 970 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-06-19 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]