If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0645180803000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.534507,"lon":-116.69038,"icon":""}]} |
| Location: 00/03-08-064-18W5/0 | |
| Location Alias: 00/03-08-64-18 W5M | |
| Location Alias 2: 00/03-08-064-18 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 064 | |
| Meridian: 5 | |
| Range: 18 | |
| Section: 08 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: TRILOGY HZ KAYBOB 3-8-64-18 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0437161 | |
| License Date: 2011-09-26 | |
| License Status: Issued | |
| Spud Date: 2011-10-22 | |
| Final Drill Date: 2011-11-06 | |
| Well Total Depth: 3588.00 m | |
| Surface Hole Latitude: 54.534507 | |
| Surface Hole Longitude: -116.690380 |
| Date | Event |
|---|---|
| 2011-09-26 | Obtained License |
| 2011-10-24 | Surface Casing Operation Performed |
| 2011-10-30 | Direction Drilling Operation Performed - Horizontal |
| 2011-10-31 | Intermediate Casing Operation Performed |
| 2011-11-06 | Finished Drilling |
| 2011-11-06 | Well Mode changed to Drilled and Cased |
| 2011-11-07 | Well Log Performed |
| 2011-11-08 | Liner Casing Operation Performed |
| 2011-11-09 | Rig Released |
| 2012-01-02 | Well Log Performed |
| 2012-01-05 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-01-05 | Perforation Treatment Performed - Open-Hole Completion |
| 2012-01-22 | Well Began Production |
| 2012-01-22 | Well Fluid changed to Crude Oil |
| 2012-01-22 | Well Mode changed to Flowing |
| 2012-03-31 | Well Fluid changed to Crude Oil |
| 2012-03-31 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-10-30 | 1987.50 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-01-05 | Open Hole/Barefoot Completion | 3578.00 | 3588.00 | 0 |
| 2012-01-05 | Multi-Stage Fracture | 2990.50 | 3065.60 | 0 |
| 2012-01-05 | Multi-Stage Fracture | 2915.30 | 2990.40 | 0 |
| 2012-01-05 | Multi-Stage Fracture | 2840.80 | 2915.20 | 0 |
| 2012-01-05 | Multi-Stage Fracture | 2765.60 | 2840.70 | 0 |
| 2012-01-05 | Multi-Stage Fracture | 2690.90 | 2765.50 | 0 |
| 2012-01-05 | Multi-Stage Fracture | 2616.00 | 2690.80 | 0 |
| 2012-01-05 | Multi-Stage Fracture | 2541.50 | 2615.90 | 0 |
| 2012-01-05 | Multi-Stage Fracture | 2466.50 | 2541.40 | 0 |
| 2012-01-05 | Multi-Stage Fracture | 2391.70 | 2466.40 | 0 |
| 2012-01-05 | Multi-Stage Fracture | 2317.00 | 2391.60 | 0 |
| 2012-01-05 | Multi-Stage Fracture | 3568.70 | 3588.00 | 0 |
| 2012-01-05 | Multi-Stage Fracture | 2242.10 | 2316.90 | 0 |
| 2012-01-05 | Multi-Stage Fracture | 2167.30 | 2242.00 | 0 |
| 2012-01-05 | Multi-Stage Fracture | 2092.20 | 2167.20 | 0 |
| 2012-01-05 | Multi-Stage Fracture | 2040.80 | 2092.10 | 0 |
| 2012-01-05 | Multi-Stage Fracture | 3503.00 | 3568.60 | 0 |
| 2012-01-05 | Multi-Stage Fracture | 3428.00 | 3502.90 | 0 |
| 2012-01-05 | Multi-Stage Fracture | 3353.00 | 3427.90 | 0 |
| 2012-01-05 | Multi-Stage Fracture | 3278.80 | 3352.90 | 0 |
| 2012-01-05 | Multi-Stage Fracture | 3203.70 | 3278.70 | 0 |
| 2012-01-05 | Multi-Stage Fracture | 3140.20 | 3203.60 | 0 |
| 2012-01-05 | Multi-Stage Fracture | 3065.70 | 3140.10 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 6474 | 0.0 | 0.0 | 0.0 |
| 2013 | 7569 | 0.0 | 0.0 | 0.0 |
| 2014 | 8211 | 0.0 | 0.0 | 0.0 |
| 2015 | 7339 | 0.0 | 0.0 | 0.0 |
| 2016 | 5370 | 0.0 | 0.0 | 0.0 |
| 2017 | 8082 | 0.0 | 0.0 | 0.0 |
| 2018 | 7404 | 0.0 | 0.0 | 0.0 |
| 2019 | 7921 | 0.0 | 0.0 | 0.0 |
For data sources see[6]