If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0645180701000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.530057,"lon":-116.705331,"icon":""}]} |
| Location: 00/01-07-064-18W5/0 | |
| Location Alias: 00/01-07-64-18 W5M | |
| Location Alias 2: 00/01-07-064-18 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 064 | |
| Meridian: 5 | |
| Range: 18 | |
| Section: 07 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: TRILOGY KAYBOB 1-7-64-18 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0442635 | |
| License Date: 2012-01-11 | |
| License Status: Issued | |
| Spud Date: 2012-09-02 | |
| Final Drill Date: 2012-09-19 | |
| Well Total Depth: 3670.00 m | |
| Surface Hole Latitude: 54.530057 | |
| Surface Hole Longitude: -116.705331 |
| Date | Event |
|---|---|
| 2012-01-11 | Obtained License |
| 2012-09-04 | Surface Casing Operation Performed |
| 2012-09-06 | Direction Drilling Operation Performed - Deviate |
| 2012-09-11 | Direction Drilling Operation Performed - Horizontal |
| 2012-09-12 | Intermediate Casing Operation Performed |
| 2012-09-19 | Finished Drilling |
| 2012-09-19 | Well Log Performed |
| 2012-09-19 | Well Mode changed to Drilled and Cased |
| 2012-09-20 | Liner Casing Operation Performed |
| 2012-09-22 | Rig Released |
| 2012-09-27 | Well Log Performed |
| 2012-10-05 | Perforation Treatment Performed - Open-Hole Completion |
| 2012-10-08 | Well Began Production |
| 2012-10-08 | Well Fluid changed to Crude Oil |
| 2012-10-08 | Well Mode changed to Flowing |
| 2012-10-13 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2013-02-19 | Well Fluid changed to Crude Oil |
| 2013-02-19 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-09-02 | Precision Drilling Corporation | 225 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-09-06 | 657.20 | Deviate (5 - 79 degrees) |
| 2012-09-11 | 2048.70 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-10-05 | Open Hole/Barefoot Completion | 3665.00 | 3670.00 | 0 |
| 2012-10-13 | Multi-Stage Fracture | 3077.70 | 3077.80 | 0 |
| 2012-10-13 | Multi-Stage Fracture | 2997.30 | 2997.40 | 0 |
| 2012-10-13 | Multi-Stage Fracture | 2920.40 | 2920.50 | 0 |
| 2012-10-13 | Multi-Stage Fracture | 2848.80 | 2848.90 | 0 |
| 2012-10-13 | Multi-Stage Fracture | 2779.40 | 2779.50 | 0 |
| 2012-10-13 | Multi-Stage Fracture | 2709.20 | 2709.30 | 0 |
| 2012-10-13 | Multi-Stage Fracture | 2625.70 | 2625.80 | 0 |
| 2012-10-13 | Multi-Stage Fracture | 2556.80 | 2556.90 | 0 |
| 2012-10-13 | Multi-Stage Fracture | 2478.00 | 2478.10 | 0 |
| 2012-10-13 | Multi-Stage Fracture | 2407.00 | 2407.10 | 0 |
| 2012-10-13 | Multi-Stage Fracture | 3640.30 | 3640.40 | 0 |
| 2012-10-13 | Multi-Stage Fracture | 2336.50 | 2336.60 | 0 |
| 2012-10-13 | Multi-Stage Fracture | 2253.30 | 2253.40 | 0 |
| 2012-10-13 | Multi-Stage Fracture | 2180.90 | 2181.00 | 0 |
| 2012-10-13 | Multi-Stage Fracture | 2123.60 | 2123.70 | 0 |
| 2012-10-13 | Multi-Stage Fracture | 3592.30 | 3592.40 | 0 |
| 2012-10-13 | Multi-Stage Fracture | 3519.80 | 3519.90 | 0 |
| 2012-10-13 | Multi-Stage Fracture | 3449.00 | 3449.10 | 0 |
| 2012-10-13 | Multi-Stage Fracture | 3363.90 | 3364.00 | 0 |
| 2012-10-13 | Multi-Stage Fracture | 3297.90 | 3298.00 | 0 |
| 2012-10-13 | Multi-Stage Fracture | 3215.00 | 3215.10 | 0 |
| 2012-10-13 | Multi-Stage Fracture | 3149.50 | 3149.60 | 0 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 1075 | 0.0 | 0.0 | 0.0 |
| 2013 | 6773 | 0.0 | 0.0 | 0.0 |
| 2014 | 6474 | 0.0 | 0.0 | 0.0 |
| 2015 | 7323 | 0.0 | 0.0 | 0.0 |
| 2016 | 6558 | 0.0 | 0.0 | 0.0 |
| 2017 | 5259 | 0.0 | 0.0 | 0.0 |
| 2018 | 4062 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-09-22 | No Incident Encountered | 0.00 | 0.00 |
| 2012-10-13 | No Incident Encountered | 0.00 | 0.00 |
| 2012-11-24 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]