X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645180505002

Well Details

Well ID: 0645180505002
Loading map...
Location: 00/05-05-064-18W5/2
Location Alias: 00/05-05-64-18 W5M
Location Alias 2: 00/05-05-064-18 W5/02
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 18
Section: 05
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY ET AL KAYBOB 5-5-64-18
Operator Name: Paramount Resources Ltd.
License Number: 0013577
License Date: 1957-06-19
License Status: Suspension
Spud Date: 1957-06-28
Final Drill Date: 1957-09-14
Well Total Depth: 3034.30 m
Surface Hole Latitude: 54.507152
Surface Hole Longitude: -116.694649

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-06-19 Obtained License
1957-07-11 Drill Stem Test Performed
1957-07-12 Drill Stem Test Performed
1957-07-16 Drill Stem Test Performed
1957-07-19 Drill Stem Test Performed
1957-09-06 Drill Stem Test Performed
1957-09-07 Drill Stem Test Performed
1957-09-12 Drill Stem Test Performed
1957-09-14 Finished Drilling
1957-09-14 Well Mode changed to Drilled and Cased
1957-09-17 Drill Stem Test Performed
1957-09-21 Production Casing Operation Performed
1957-09-26 Perforation Treatment Performed - Jet Perforation
1957-10-08 Perforation Treatment Performed - Bullet Perforation
1957-10-08 Perforation Treatment Performed - Cement Squeeze
1957-10-13 Perforation Treatment Performed - Bullet Perforation
1957-10-13 Perforation Treatment Performed - Cement Squeeze
1957-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-10-18 Perforation Treatment Performed - Cement Plug
2000-03-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-03-30 Well Log Performed
2000-03-31 Perforation Treatment Performed - Jet Perforation
2000-04-01 Perforation Treatment Performed - Fractured
2000-05-13 Well Began Production
2000-05-13 Well Fluid changed to Gas
2000-05-13 Well Mode changed to Flowing
2002-01-01 Well Fluid changed to Gas
2002-01-01 Well Mode changed to Pumping
2013-03-26 Well Fluid changed to Gas
2013-03-26 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1957-09-26 Perforation 2514.60 2526.80 13
2000-04-01 Fracture 1750.00 1758.00 0
1957-10-08 Cement Squeeze 2514.60 2526.80 0
1957-10-08 Bullet Perforation 2500.90 2508.50 13
1957-10-13 Cement Squeeze 2500.90 2508.50 0
1957-10-13 Bullet Perforation 2472.50 2485.60 13
1957-10-16 Acid Treatment 2472.50 2485.60 0
1957-10-18 Cement Plug 2417.70 2456.70 0
2000-03-30 Packing Device Capped w/Cement 1842.00 1850.00 0
2000-03-31 Perforation 1750.00 1758.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 5166 0.0 0.0 0.0
2001 5620 0.0 0.0 0.0
2002 8325 0.0 0.0 0.0
2003 8306 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8367 0.0 0.0 0.0
2007 8711 0.0 0.0 0.0
2008 8763 0.0 0.0 0.0
2009 8399 0.0 0.0 0.0
2010 8358 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 888 0.0 0.0 0.0

For data sources see[5]

References