X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645180501020

Well Details

Well ID: 0645180501020
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Sorry, we have no imagery here.
Location: 02/01-05-064-18W5/0
Location Alias: 02/01-05-64-18 W5M
Location Alias 2: 02/01-05-064-18 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 18
Section: 05
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY 102 HZ KAYBOB 1-5-64-18
Operator Name: Paramount Resources Ltd.
License Number: 0485717
License Date: 2017-10-06
License Status: Amended
Spud Date: 2017-11-23
Final Drill Date: 2017-11-30
Well Total Depth: 3550.00 m
Surface Hole Latitude: 54.506568
Surface Hole Longitude: -116.698042

For data sources see[1][2]

Well History

Date Event
2017-10-06 Obtained License
2017-11-23 Surface Casing Operation Performed
2017-11-25 Direction Drilling Operation Performed - Deviate
2017-11-26 Direction Drilling Operation Performed - Horizontal
2017-11-26 Well Log Performed
2017-11-27 Intermediate Casing Operation Performed
2017-11-30 Finished Drilling
2017-11-30 Well Log Performed
2017-11-30 Well Mode changed to Drilled and Cased
2017-12-01 Liner Casing Operation Performed
2017-12-02 Rig Released
2017-12-11 Perforation Treatment Performed - Multi-Stage Fracture
2017-12-11 Perforation Treatment Performed - Open-Hole Completion
2017-12-12 Well Began Production
2017-12-12 Well Fluid changed to Crude Oil
2017-12-12 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-11-23 Precision Drilling Corporation 391 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-11-25 651.00 Deviate (5 - 79 degrees)
2017-11-26 1982.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-12-11 Open Hole/Barefoot Completion 3545.00 3550.00 0
2017-12-11 Multi-Stage Fracture 3090.10 3090.20 0
2017-12-11 Multi-Stage Fracture 3033.20 3033.30 0
2017-12-11 Multi-Stage Fracture 2978.30 2978.40 0
2017-12-11 Multi-Stage Fracture 2922.60 2922.70 0
2017-12-11 Multi-Stage Fracture 2868.00 2868.10 0
2017-12-11 Multi-Stage Fracture 2811.80 2811.90 0
2017-12-11 Multi-Stage Fracture 2756.50 2756.60 0
2017-12-11 Multi-Stage Fracture 2701.60 2701.70 0
2017-12-11 Multi-Stage Fracture 2647.00 2647.10 0
2017-12-11 Multi-Stage Fracture 2593.10 2593.20 0
2017-12-11 Multi-Stage Fracture 3522.70 3522.80 0
2017-12-11 Multi-Stage Fracture 2538.00 2538.10 0
2017-12-11 Multi-Stage Fracture 2483.20 2483.30 0
2017-12-11 Multi-Stage Fracture 2427.30 2427.40 0
2017-12-11 Multi-Stage Fracture 2372.10 2372.20 0
2017-12-11 Multi-Stage Fracture 2319.00 2319.10 0
2017-12-11 Multi-Stage Fracture 2265.00 2265.10 0
2017-12-11 Multi-Stage Fracture 2208.40 2208.50 0
2017-12-11 Multi-Stage Fracture 2149.80 2149.90 0
2017-12-11 Multi-Stage Fracture 2094.70 2094.80 0
2017-12-11 Multi-Stage Fracture 2038.70 2038.80 0
2017-12-11 Multi-Stage Fracture 3464.60 3464.70 0
2017-12-11 Multi-Stage Fracture 3409.80 3409.90 0
2017-12-11 Multi-Stage Fracture 3358.00 3358.10 0
2017-12-11 Multi-Stage Fracture 3305.50 3305.60 0
2017-12-11 Multi-Stage Fracture 3252.60 3252.70 0
2017-12-11 Multi-Stage Fracture 3201.60 3201.70 0
2017-12-11 Multi-Stage Fracture 3147.00 3147.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-12-11 2017-12-11 1,854 1,781 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 71.0663 N/A
20/40 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 22.6294 N/A
SaniFrac 8844 Calfrac Well Services Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.01 N/A
Acetonitrile. 2.2-dibromo 3252-43-5 100 0.01 N/A
Non-Hazardous Ingredients Trade Secret 100 0.01 N/A
Polyethylene glycol 25322-68-3 100 0.01 N/A
Sodium bromide 7647-15-6 100 0.01 N/A
DWP-690 Calfrac Breaker Hydrogen peroxide 7722-84-1 100 0.0707 N/A
Water 7732-18-5 100 0.0707 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.0618 N/A
DWP-959 Calfrac Demulsifier Methanol 67-56-1 100 0.0741 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0741 N/A
Nitrogen Calfrac Energizing Fluid Nitrogen 7727-37-9 100 5.7239 N/A
CalVisc Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.3375 N/A
DAP-902 Calfrac Scale Inhibitor Non-Hazardous Ingredients Trade Secret 100 0.0258 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-12-10 2017-12-11 Surface Water - Runoff 1783

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 47 0.0 0.0 0.0
2018 8120 0.0 0.0 0.0
2019 7627 0.0 0.0 0.0
2020 2175 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-12-02 No Incident Encountered 0.00 0.00
2017-12-15 No Incident Encountered 0.00 0.00

For data sources see[10]

References

BESbswy