If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0645180212000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.506192,"lon":-116.596522,"icon":""}]} |
| Location: 00/12-02-064-18W5/0 | |
| Location Alias: 00/12-02-64-18 W5M | |
| Location Alias 2: 00/12-02-064-18 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 064 | |
| Meridian: 5 | |
| Range: 18 | |
| Section: 02 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: TRILOGY HZ KAYBOB 12-2-64-18 | |
| Operator Name: Paramount Resources Ltd. | |
| License Number: 0436609 | |
| License Date: 2011-09-08 | |
| License Status: Issued | |
| Spud Date: 2011-09-22 | |
| Final Drill Date: 2011-10-14 | |
| Well Total Depth: 3737.00 m | |
| Surface Hole Latitude: 54.506192 | |
| Surface Hole Longitude: -116.596522 |
| Date | Event |
|---|---|
| 2011-09-08 | Obtained License |
| 2011-09-24 | Surface Casing Operation Performed |
| 2011-10-01 | Direction Drilling Operation Performed - Horizontal |
| 2011-10-06 | Intermediate Casing Operation Performed |
| 2011-10-14 | Finished Drilling |
| 2011-10-14 | Well Log Performed |
| 2011-10-14 | Well Mode changed to Drilled and Cased |
| 2011-10-18 | Liner Casing Operation Performed |
| 2011-10-19 | Rig Released |
| 2011-10-28 | Well Log Performed |
| 2011-11-09 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-11-09 | Perforation Treatment Performed - Open-Hole Completion |
| 2011-11-13 | Well Began Production |
| 2011-11-13 | Well Fluid changed to Crude Oil |
| 2011-11-13 | Well Mode changed to Flowing |
| 2011-12-04 | Well Log Performed |
| 2011-12-07 | Well Log Performed |
| 2011-12-13 | Well Fluid changed to Crude Oil |
| 2011-12-13 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-10-01 | 2090.70 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-11-09 | Open Hole/Barefoot Completion | 3732.80 | 3737.00 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 3135.50 | 3135.60 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 3060.50 | 3060.60 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 2985.60 | 2985.70 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 2910.60 | 2910.70 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 2835.70 | 2835.80 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 2760.70 | 2760.80 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 2685.60 | 2685.70 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 2608.30 | 2608.40 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 2533.00 | 2533.10 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 2457.80 | 2457.90 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 3712.30 | 3712.40 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 2382.70 | 2382.80 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 2305.50 | 2305.60 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 2230.50 | 2230.60 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 2179.00 | 2179.30 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 3658.10 | 3658.20 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 3583.30 | 3583.40 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 3509.30 | 3509.40 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 3434.30 | 3434.40 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 3359.10 | 3359.20 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 3284.20 | 3284.30 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 3209.70 | 3209.80 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 518 | 0.0 | 0.0 | 0.0 |
| 2012 | 6987 | 0.0 | 0.0 | 0.0 |
| 2013 | 8045 | 0.0 | 0.0 | 0.0 |
| 2014 | 5998 | 0.0 | 0.0 | 0.0 |
| 2015 | 8166 | 0.0 | 0.0 | 0.0 |
| 2016 | 3785 | 0.0 | 0.0 | 0.0 |
| 2017 | 3737 | 0.0 | 0.0 | 0.0 |
| 2018 | 4703 | 0.0 | 0.0 | 0.0 |
| 2019 | 6166 | 0.0 | 0.0 | 0.0 |
| 2020 | 2134 | 0.0 | 0.0 | 0.0 |
For data sources see[6]