X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645133602000

Well Details

Well ID: 0645133602000
Loading map...
Location: 00/02-36-064-13W5/0
Location Alias: 00/02-36-64-13 W5M
Location Alias 2: 00/02-36-064-13 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 13
Section: 36
County/Municipality: Big Lakes County
Well Name: 1976082 JUDYCK 2-36-64-13
Operator Name: Razor Energy Corp.
License Number: 0019670
License Date: 1960-09-12
License Status: Suspension
Spud Date: 1960-09-15
Final Drill Date: 1960-10-18
Well Total Depth: 2813.30 m
Surface Hole Latitude: 54.575906
Surface Hole Longitude: -115.825908

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-09-12 Obtained License
1960-10-18 Finished Drilling
1960-10-18 Well Mode changed to Drilled and Cased
1960-10-20 Production Casing Operation Performed
1960-10-22 Well Began Production
1960-10-22 Well Fluid changed to Crude Oil
1960-10-22 Well Mode changed to Flowing
1960-10-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-10-23 Perforation Treatment Performed - Bullet Perforation
1963-09-04 Well Fluid changed to Crude Oil
1963-09-04 Well Mode changed to Gas Lift
1972-12-29 Perforation Treatment Performed - Jet Perforation
1975-01-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-10-06 Perforation Treatment Performed - Jet Perforation
1981-10-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-06-21 Well Log Performed
1989-08-29 Perforation Treatment Performed - Jet Perforation
1989-08-30 Perforation Treatment Performed - Jet Perforation
1989-09-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-10-13 Well Began Injection
1989-10-13 Well Fluid changed to Water
1989-10-13 Well Type changed to Injection
1990-01-01 Well Fluid changed to Solvent
1990-01-01 Well Type changed to Injection
1992-03-17 Well Log Performed
1992-06-08 Well Log Performed
1996-12-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-12-07 Plug Back Performed
1996-12-07 Well Fluid changed to Solvent
1996-12-07 Well Log Performed
1996-12-07 Well Mode changed to Abandoned and Whipstocked
1996-12-07 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-10-23 Bullet Perforation 2749.30 2755.40 7
1989-08-30 Perforation 2755.40 2758.40 13
1989-09-01 Acid Treatment 2749.30 2801.20 0
1996-12-07 Packing Device Capped w/Cement 2662.00 2670.00 0
1960-10-23 Acid Treatment 2749.30 2755.40 0
1972-12-29 Perforation 2760.30 2764.50 7
1975-01-14 Acid Treatment 2760.30 2764.50 0
1981-10-06 Perforation 2749.30 2772.80 7
1981-10-07 Acid Treatment 2749.30 2772.80 0
1989-08-29 Perforation 2764.50 2772.80 7
1989-08-29 Perforation 2780.50 2790.10 13
1989-08-29 Perforation 2793.20 2801.20 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 480 0.0 0.0 0.0
1969 1320 0.0 0.0 0.0
1970 7818 0.0 0.0 0.0
1971 5455 0.0 0.0 0.0
1972 2034 0.0 0.0 0.0
1973 3443 0.0 0.0 0.0
1974 6356 0.0 0.0 0.0
1975 1166 0.0 0.0 0.0
1977 314 0.0 0.0 0.0
1981 2057 0.0 0.0 0.0
1982 8289 0.0 0.0 0.0
1983 8308 0.0 0.0 0.0
1984 8387 0.0 0.0 0.0
1985 7964 0.0 0.0 0.0
1986 6998 0.0 0.0 0.0
1987 8605 0.0 0.0 0.0
1988 8294 0.0 0.0 0.0
1989 5201 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0

For data sources see[5]

References