X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645132512000

Well Details

Well ID: 0645132512000
Loading map...
Location: 00/12-25-064-13W5/0
Location Alias: 00/12-25-64-13 W5M
Location Alias 2: 00/12-25-064-13 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 13
Section: 25
County/Municipality: Big Lakes County
Well Name: 1976082 VIRG 12-25-64-13
Operator Name: Razor Energy Corp.
License Number: 0019454
License Date: 1960-07-28
License Status: Suspension
Spud Date: 1960-08-02
Final Drill Date: 1960-08-30
Well Total Depth: 2834.00 m
Surface Hole Latitude: 54.568491
Surface Hole Longitude: -115.837821

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-07-28 Obtained License
1960-08-30 Finished Drilling
1960-08-30 Well Mode changed to Drilled and Cased
1960-09-01 Production Casing Operation Performed
1960-09-05 Perforation Treatment Performed - Jet Perforation
1960-09-10 Well Began Production
1960-09-10 Well Fluid changed to Crude Oil
1960-09-10 Well Mode changed to Flowing
1963-03-13 Perforation Treatment Performed - Selective Jet Perforations
1963-03-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-08-20 Well Fluid changed to Crude Oil
1963-08-20 Well Mode changed to Gas Lift
1982-07-11 Perforation Treatment Performed - Jet Perforation
1982-07-13 Perforation Treatment Performed - Fractured
1988-05-06 Perforation Treatment Performed - Jet Perforation
1988-05-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-08-15 Well Began Injection
1988-08-15 Well Fluid changed to Water
1988-08-15 Well Type changed to Injection
1990-01-01 Well Fluid changed to Solvent
1990-01-01 Well Type changed to Injection
1990-03-30 Perforation Treatment Performed - Cement Squeeze
1990-03-31 Perforation Treatment Performed - Cement Squeeze
1990-04-17 Perforation Treatment Performed - Jet Perforation
1990-04-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-04-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-05-27 Well Log Performed
1992-05-27 Well Log Performed
2001-03-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2015-09-01 Well Fluid changed to Water
2015-09-01 Well Type changed to Injection
2015-11-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-11-02 Perforation Treatment Performed - Cement Squeeze
2015-11-02 Plug Back Performed
2015-11-02 Well Fluid changed to Water
2015-11-02 Well Mode changed to Abandoned Zone
2015-11-02 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-09-05 Perforation 2792.00 2798.10 7
1963-03-13 Selective Jet Perforations 2777.60 2778.60 0
1963-03-13 Selective Jet Perforations 2779.50 2781.30 0
1963-03-13 Selective Jet Perforations 2783.10 2784.30 0
1963-03-13 Selective Jet Perforations 2786.20 2787.10 0
1963-03-13 Selective Jet Perforations 2788.90 2789.80 0
1963-03-13 Selective Jet Perforations 2790.70 2799.30 0
1963-03-13 Selective Jet Perforations 2799.90 2799.90 0
1963-03-14 Acid Treatment 2756.60 2799.90 0
1982-07-11 Perforation 2756.00 2760.60 7
1982-07-11 Perforation 2762.70 2763.60 7
1963-03-13 Selective Jet Perforations 2756.60 2757.80 0
1982-07-11 Perforation 2765.70 2773.10 7
1982-07-11 Perforation 2774.30 2775.50 7
1982-07-11 Perforation 2782.50 2784.30 7
1982-07-11 Perforation 2785.90 2787.70 7
1982-07-11 Perforation 2788.90 2790.70 7
1982-07-11 Perforation 2799.00 2800.50 7
1982-07-11 Perforation 2805.40 2809.60 7
1982-07-13 Fracture 2756.00 2809.60 0
1988-05-06 Perforation 2776.50 2780.10 13
1988-05-06 Perforation 2780.50 2782.20 13
1963-03-13 Selective Jet Perforations 2759.00 2760.30 0
1988-05-06 Perforation 2810.30 2814.50 13
1988-05-06 Perforation 2815.40 2816.50 13
1988-05-06 Perforation 2817.30 2819.00 13
1988-05-11 Acid Treatment 2756.60 2819.00 0
1990-03-30 Cement Squeeze 2756.00 2784.30 0
1990-03-31 Cement Squeeze 2756.00 2784.30 0
1990-04-17 Perforation 2756.00 2760.60 13
1990-04-17 Perforation 2762.70 2764.00 13
1990-04-17 Perforation 2765.70 2769.40 13
1990-04-22 Acid Treatment 2805.40 2819.40 0
1963-03-13 Selective Jet Perforations 2763.00 2763.60 0
1990-04-22 Acid Treatment 2785.90 2819.40 0
1990-04-26 Acid Treatment 2756.00 2819.00 0
2001-03-27 Acid Treatment 2786.20 2819.00 0
2015-11-02 Cement Squeeze 2756.00 2819.40 0
2015-11-02 Packing Device Capped w/Cement 2648.00 2667.30 0
1963-03-13 Selective Jet Perforations 2766.40 2767.00 0
1963-03-13 Selective Jet Perforations 2768.50 2769.10 0
1963-03-13 Selective Jet Perforations 2770.90 2772.50 0
1963-03-13 Selective Jet Perforations 2773.10 2774.60 0
1963-03-13 Selective Jet Perforations 2775.20 2776.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1975 908 0.0 0.0 0.0
1979 429 0.0 0.0 0.0
1982 3977 0.0 0.0 0.0
1983 8365 0.0 0.0 0.0
1984 8363 0.0 0.0 0.0
1985 5529 0.0 0.0 0.0
1986 6483 0.0 0.0 0.0
1987 2007 0.0 0.0 0.0
1988 2183 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-11-04 No Incident Encountered 0.00 0.00

For data sources see[6]

References