If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0645132512000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.568491,"lon":-115.837821,"icon":""}]} |
| Location: 00/12-25-064-13W5/0 | |
| Location Alias: 00/12-25-64-13 W5M | |
| Location Alias 2: 00/12-25-064-13 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 064 | |
| Meridian: 5 | |
| Range: 13 | |
| Section: 25 | |
| County/Municipality: Big Lakes County | |
| Well Name: 1976082 VIRG 12-25-64-13 | |
| Operator Name: Razor Energy Corp. | |
| License Number: 0019454 | |
| License Date: 1960-07-28 | |
| License Status: Suspension | |
| Spud Date: 1960-08-02 | |
| Final Drill Date: 1960-08-30 | |
| Well Total Depth: 2834.00 m | |
| Surface Hole Latitude: 54.568491 | |
| Surface Hole Longitude: -115.837821 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1960-07-28 | Obtained License |
| 1960-08-30 | Finished Drilling |
| 1960-08-30 | Well Mode changed to Drilled and Cased |
| 1960-09-01 | Production Casing Operation Performed |
| 1960-09-05 | Perforation Treatment Performed - Jet Perforation |
| 1960-09-10 | Well Began Production |
| 1960-09-10 | Well Fluid changed to Crude Oil |
| 1960-09-10 | Well Mode changed to Flowing |
| 1963-03-13 | Perforation Treatment Performed - Selective Jet Perforations |
| 1963-03-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1963-08-20 | Well Fluid changed to Crude Oil |
| 1963-08-20 | Well Mode changed to Gas Lift |
| 1982-07-11 | Perforation Treatment Performed - Jet Perforation |
| 1982-07-13 | Perforation Treatment Performed - Fractured |
| 1988-05-06 | Perforation Treatment Performed - Jet Perforation |
| 1988-05-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1988-08-15 | Well Began Injection |
| 1988-08-15 | Well Fluid changed to Water |
| 1988-08-15 | Well Type changed to Injection |
| 1990-01-01 | Well Fluid changed to Solvent |
| 1990-01-01 | Well Type changed to Injection |
| 1990-03-30 | Perforation Treatment Performed - Cement Squeeze |
| 1990-03-31 | Perforation Treatment Performed - Cement Squeeze |
| 1990-04-17 | Perforation Treatment Performed - Jet Perforation |
| 1990-04-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1990-04-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1991-05-27 | Well Log Performed |
| 1992-05-27 | Well Log Performed |
| 2001-03-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2015-09-01 | Well Fluid changed to Water |
| 2015-09-01 | Well Type changed to Injection |
| 2015-11-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2015-11-02 | Perforation Treatment Performed - Cement Squeeze |
| 2015-11-02 | Plug Back Performed |
| 2015-11-02 | Well Fluid changed to Water |
| 2015-11-02 | Well Mode changed to Abandoned Zone |
| 2015-11-02 | Well Type changed to Injection |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1960-09-05 | Perforation | 2792.00 | 2798.10 | 7 |
| 1963-03-13 | Selective Jet Perforations | 2777.60 | 2778.60 | 0 |
| 1963-03-13 | Selective Jet Perforations | 2779.50 | 2781.30 | 0 |
| 1963-03-13 | Selective Jet Perforations | 2783.10 | 2784.30 | 0 |
| 1963-03-13 | Selective Jet Perforations | 2786.20 | 2787.10 | 0 |
| 1963-03-13 | Selective Jet Perforations | 2788.90 | 2789.80 | 0 |
| 1963-03-13 | Selective Jet Perforations | 2790.70 | 2799.30 | 0 |
| 1963-03-13 | Selective Jet Perforations | 2799.90 | 2799.90 | 0 |
| 1963-03-14 | Acid Treatment | 2756.60 | 2799.90 | 0 |
| 1982-07-11 | Perforation | 2756.00 | 2760.60 | 7 |
| 1982-07-11 | Perforation | 2762.70 | 2763.60 | 7 |
| 1963-03-13 | Selective Jet Perforations | 2756.60 | 2757.80 | 0 |
| 1982-07-11 | Perforation | 2765.70 | 2773.10 | 7 |
| 1982-07-11 | Perforation | 2774.30 | 2775.50 | 7 |
| 1982-07-11 | Perforation | 2782.50 | 2784.30 | 7 |
| 1982-07-11 | Perforation | 2785.90 | 2787.70 | 7 |
| 1982-07-11 | Perforation | 2788.90 | 2790.70 | 7 |
| 1982-07-11 | Perforation | 2799.00 | 2800.50 | 7 |
| 1982-07-11 | Perforation | 2805.40 | 2809.60 | 7 |
| 1982-07-13 | Fracture | 2756.00 | 2809.60 | 0 |
| 1988-05-06 | Perforation | 2776.50 | 2780.10 | 13 |
| 1988-05-06 | Perforation | 2780.50 | 2782.20 | 13 |
| 1963-03-13 | Selective Jet Perforations | 2759.00 | 2760.30 | 0 |
| 1988-05-06 | Perforation | 2810.30 | 2814.50 | 13 |
| 1988-05-06 | Perforation | 2815.40 | 2816.50 | 13 |
| 1988-05-06 | Perforation | 2817.30 | 2819.00 | 13 |
| 1988-05-11 | Acid Treatment | 2756.60 | 2819.00 | 0 |
| 1990-03-30 | Cement Squeeze | 2756.00 | 2784.30 | 0 |
| 1990-03-31 | Cement Squeeze | 2756.00 | 2784.30 | 0 |
| 1990-04-17 | Perforation | 2756.00 | 2760.60 | 13 |
| 1990-04-17 | Perforation | 2762.70 | 2764.00 | 13 |
| 1990-04-17 | Perforation | 2765.70 | 2769.40 | 13 |
| 1990-04-22 | Acid Treatment | 2805.40 | 2819.40 | 0 |
| 1963-03-13 | Selective Jet Perforations | 2763.00 | 2763.60 | 0 |
| 1990-04-22 | Acid Treatment | 2785.90 | 2819.40 | 0 |
| 1990-04-26 | Acid Treatment | 2756.00 | 2819.00 | 0 |
| 2001-03-27 | Acid Treatment | 2786.20 | 2819.00 | 0 |
| 2015-11-02 | Cement Squeeze | 2756.00 | 2819.40 | 0 |
| 2015-11-02 | Packing Device Capped w/Cement | 2648.00 | 2667.30 | 0 |
| 1963-03-13 | Selective Jet Perforations | 2766.40 | 2767.00 | 0 |
| 1963-03-13 | Selective Jet Perforations | 2768.50 | 2769.10 | 0 |
| 1963-03-13 | Selective Jet Perforations | 2770.90 | 2772.50 | 0 |
| 1963-03-13 | Selective Jet Perforations | 2773.10 | 2774.60 | 0 |
| 1963-03-13 | Selective Jet Perforations | 2775.20 | 2776.40 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
| 1962 | 0 | 0.0 | 0.0 | 0.0 |
| 1963 | 0 | 0.0 | 0.0 | 0.0 |
| 1964 | 0 | 0.0 | 0.0 | 0.0 |
| 1965 | 0 | 0.0 | 0.0 | 0.0 |
| 1966 | 0 | 0.0 | 0.0 | 0.0 |
| 1975 | 908 | 0.0 | 0.0 | 0.0 |
| 1979 | 429 | 0.0 | 0.0 | 0.0 |
| 1982 | 3977 | 0.0 | 0.0 | 0.0 |
| 1983 | 8365 | 0.0 | 0.0 | 0.0 |
| 1984 | 8363 | 0.0 | 0.0 | 0.0 |
| 1985 | 5529 | 0.0 | 0.0 | 0.0 |
| 1986 | 6483 | 0.0 | 0.0 | 0.0 |
| 1987 | 2007 | 0.0 | 0.0 | 0.0 |
| 1988 | 2183 | 0.0 | 0.0 | 0.0 |
| 1989 | 0 | 0.0 | 0.0 | 0.0 |
| 1990 | 0 | 0.0 | 0.0 | 0.0 |
| 1991 | 0 | 0.0 | 0.0 | 0.0 |
| 1992 | 0 | 0.0 | 0.0 | 0.0 |
| 1993 | 0 | 0.0 | 0.0 | 0.0 |
| 1994 | 0 | 0.0 | 0.0 | 0.0 |
| 1995 | 0 | 0.0 | 0.0 | 0.0 |
| 1996 | 0 | 0.0 | 0.0 | 0.0 |
| 1997 | 0 | 0.0 | 0.0 | 0.0 |
| 1998 | 0 | 0.0 | 0.0 | 0.0 |
| 1999 | 0 | 0.0 | 0.0 | 0.0 |
| 2000 | 0 | 0.0 | 0.0 | 0.0 |
| 2001 | 0 | 0.0 | 0.0 | 0.0 |
| 2002 | 0 | 0.0 | 0.0 | 0.0 |
| 2003 | 0 | 0.0 | 0.0 | 0.0 |
| 2004 | 0 | 0.0 | 0.0 | 0.0 |
| 2005 | 0 | 0.0 | 0.0 | 0.0 |
| 2006 | 0 | 0.0 | 0.0 | 0.0 |
| 2007 | 0 | 0.0 | 0.0 | 0.0 |
| 2008 | 0 | 0.0 | 0.0 | 0.0 |
| 2009 | 0 | 0.0 | 0.0 | 0.0 |
| 2010 | 0 | 0.0 | 0.0 | 0.0 |
| 2011 | 0 | 0.0 | 0.0 | 0.0 |
| 2012 | 0 | 0.0 | 0.0 | 0.0 |
| 2013 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2015-11-04 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]