X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645131710003

Well Details

Well ID: 0645131710003
Loading map...
Location: 00/10-17-064-13W5/3
Location Alias: 00/10-17-64-13 W5M
Location Alias 2: 00/10-17-064-13 W5/03
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 13
Section: 17
County/Municipality: Big Lakes County
Well Name: TALISMAN VIRG 10-17-64-13
Operator Name: Paramount Resources Ltd.
License Number: 0023503
License Date: 1962-12-13
License Status: Suspension
Spud Date: 1962-12-12
Final Drill Date: 1963-01-21
Well Total Depth: 3258.60 m
Surface Hole Latitude: 54.539929
Surface Hole Longitude: -115.925736

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-12-13 Obtained License
1963-01-21 Finished Drilling
1963-01-21 Production Casing Operation Performed
1963-01-25 Perforation Treatment Performed - Selective Jet Perforations
1963-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-06-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-09-05 Perforation Treatment Performed - Cement Squeeze
1963-09-08 Perforation Treatment Performed - Jet Perforation
1963-09-08 Well Log Performed
1963-12-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-12-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-09-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-09-14 Perforation Treatment Performed - Jet Perforation
1982-09-25 Well Mode changed to Drilled and Cased
1983-07-09 Well Began Production
1983-07-09 Well Fluid changed to Gas
1983-07-09 Well Mode changed to Flowing
1985-10-01 Well Fluid changed to Gas
1985-10-01 Well Mode changed to Suspended
1999-07-15 Well Fluid changed to Gas
1999-07-15 Well Mode changed to Flowing
1999-09-21 Well Log Performed
1999-09-22 Well Log Performed
1999-09-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-09-23 Perforation Treatment Performed - Jet Perforation
1999-09-28 Well Log Performed
1999-09-30 Perforation Treatment Performed - Jet Perforation
1999-10-01 Perforation Treatment Performed - Remedial Casing
1999-10-02 Well Log Performed
1999-10-03 Perforation Treatment Performed - Jet Perforation
1999-10-06 Perforation Treatment Performed - Jet Perforation
1999-10-10 Perforation Treatment Performed - Remedial Casing
2003-03-01 Well Fluid changed to Gas
2003-03-01 Well Mode changed to Suspended
2004-01-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-01-07 Perforation Treatment Performed - Jet Perforation
2004-01-08 Perforation Treatment Performed - Remedial Casing
2004-01-20 Well Log Performed
2004-01-23 Perforation Treatment Performed - Jet Perforation
2004-01-24 Perforation Treatment Performed - Cement Squeeze
2004-01-24 Perforation Treatment Performed - Remedial Casing
2004-02-03 Perforation Treatment Performed - Jet Perforation
2004-02-05 Perforation Treatment Performed - Remedial Casing
2004-02-07 Perforation Treatment Performed - Jet Perforation
2004-02-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-02-20 Perforation Treatment Performed - Jet Perforation
2004-02-21 Perforation Treatment Performed - Remedial Casing
2004-02-24 Perforation Treatment Performed - Remedial Casing
2004-02-29 Perforation Treatment Performed - Jet Perforation
2004-03-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-03-04 Perforation Treatment Performed - Jet Perforation
2004-03-05 Perforation Treatment Performed - Remedial Casing
2004-03-10 Perforation Treatment Performed - Jet Perforation
2004-03-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-03-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-03-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-08-11 Perforation Treatment Performed - Cement Squeeze
2004-08-11 Perforation Treatment Performed - Jet Perforation
2004-08-11 Plug Back Performed
2004-08-12 Perforation Treatment Performed - Jet Perforation
2004-08-12 Perforation Treatment Performed - Remedial Casing
2004-08-17 Perforation Treatment Performed - Jet Perforation
2004-08-17 Well Log Performed
2004-08-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-08-21 Perforation Treatment Performed - Jet Perforation
2004-08-21 Well Log Performed
2004-08-22 Perforation Treatment Performed - Remedial Casing
2004-09-06 Production Casing Operation Performed
2004-09-08 Perforation Treatment Performed - Jet Perforation
2004-09-08 Well Log Performed
2004-09-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-11-01 Well Began Injection
2004-11-01 Well Fluid changed to Acid Gas
2004-11-01 Well Type changed to Disposal
2014-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2015-04-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2015-05-10 Perforation Treatment Performed - Jet Perforation
2015-05-26 Perforation Treatment Performed - Chemical Squeeze
2015-05-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2015-08-02 Well Fluid changed to Acid Gas
2015-08-02 Well Mode changed to Suspended
2015-08-02 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-01-25 Selective Jet Perforations 2921.50 2925.50 0
1963-12-02 Acid Treatment 2921.20 2943.10 0
1963-12-20 Acid Treatment 2921.20 2943.10 0
1982-09-13 Packing Device Capped w/Cement 2908.00 2908.00 0
1982-09-14 Perforation 1899.50 1904.40 13
1999-09-23 Packing Device Capped w/Cement 1998.00 2006.00 0
1999-09-23 Perforation 1952.00 1952.60 78
1999-09-30 Perforation 1948.30 1949.00 78
1999-10-01 Remedial Casing Cementing 1948.30 1952.60 0
1999-10-03 Perforation 1899.50 1904.00 17
1999-10-06 Perforation 1746.00 1752.00 17
1963-01-25 Selective Jet Perforations 2941.90 2946.50 0
1999-10-10 Remedial Casing Cementing 1746.00 1752.00 0
2004-01-05 Acid Treatment 1899.50 1904.40 0
2004-01-07 Perforation 1906.00 1906.30 13
2004-01-08 Remedial Casing Cementing 1906.00 1906.30 0
2004-01-23 Perforation 1893.00 1893.30 13
2004-01-24 Remedial Casing Cementing 1893.00 1893.30 0
2004-01-24 Cement Squeeze 1899.50 1904.40 0
2004-02-03 Perforation 1907.00 1907.20 13
2004-02-05 Remedial Casing Cementing 1907.00 1907.20 0
2004-02-07 Perforation 1899.50 1904.00 13
1963-01-25 Selective Jet Perforations 2950.50 2952.90 0
2004-02-08 Acid Treatment 1899.50 1904.00 0
2004-02-20 Perforation 1775.00 1775.30 13
2004-02-20 Perforation 1893.00 1893.30 13
2004-02-21 Remedial Casing Cementing 1893.00 1893.30 0
2004-02-24 Remedial Casing Cementing 1775.00 1775.30 0
2004-02-29 Perforation 1899.50 1904.00 13
2004-03-01 Acid Treatment 1899.50 1904.00 0
2004-03-04 Perforation 1889.50 1889.80 13
2004-03-04 Perforation 1896.50 1896.80 13
2004-03-05 Remedial Casing Cementing 1889.50 1896.80 0
1963-01-26 Acid Treatment 2921.50 2952.90 0
2004-03-10 Perforation 1899.50 1904.00 13
2004-03-11 Acid Treatment 1899.50 1904.00 0
2004-03-14 Acid Treatment 1899.50 1904.00 0
2004-03-24 Acid Treatment 1899.50 1904.00 0
2004-08-11 Cement Squeeze 1899.50 1904.00 0
2004-08-11 Perforation 406.00 406.60 99
2004-08-11 Perforation 580.00 581.00 20
2004-08-12 Perforation 500.00 500.30 99
2004-08-12 Remedial Casing Cementing 406.00 581.00 0
2004-08-17 Perforation 530.00 530.30 99
1963-06-29 Acid Treatment 2921.50 2952.90 0
2004-08-17 Perforation 560.00 560.30 99
2004-08-21 Perforation 530.00 530.30 99
2004-08-21 Perforation 560.00 560.30 99
2004-08-21 Acid Treatment 530.00 560.30 0
2004-08-22 Remedial Casing Cementing 530.00 560.30 0
2004-09-08 Perforation 1899.50 1904.00 20
2004-09-10 Acid Treatment 1899.50 1904.00 0
2014-02-12 Acid Treatment 1899.50 1904.00 0
2015-04-23 Acid Treatment 1899.50 1904.00 0
2015-05-10 Perforation 1900.00 1904.00 13
1963-09-05 Cement Squeeze 2941.90 2952.90 0
2015-05-26 Chemical Squeeze 1899.50 1904.00 0
2015-05-27 Acid Treatment 1899.50 1904.00 0
1963-09-08 Perforation 2925.20 2926.70 7
1963-09-08 Perforation 2941.00 2943.10 7
1963-09-08 Perforation 2921.20 2922.70 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 2442 0.0 0.0 0.0
1984 4739 0.0 0.0 0.0
1985 1661 0.0 0.0 0.0
1999 1070 0.0 0.0 0.0
2000 8507 0.0 0.0 0.0
2001 971 0.0 0.0 0.0
2002 1 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-02-12 No Incident Encountered 0.00 0.00
2015-04-23 No Incident Encountered 0.00 0.00
2015-05-28 No Incident Encountered 0.00 0.00

For data sources see[6]

References