X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645111112000

Well Details

Well ID: 0645111112000
Loading map...
Location: 00/12-11-064-11W5/0
Location Alias: 00/12-11-64-11 W5M
Location Alias 2: 00/12-11-064-11 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 11
Section: 11
County/Municipality: Big Lakes County
Well Name: ACCEL JUDYCK 12-11-64-11
Operator Name: ACCEL Energy Canada Limited
License Number: 0019121
License Date: 1960-06-01
License Status: Abandoned
Spud Date: 1960-07-08
Final Drill Date: 1960-08-06
Well Total Depth: 2706.60 m
Surface Hole Latitude: 54.525396
Surface Hole Longitude: -115.560980

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-06-01 Obtained License
1960-07-08 Lost Circulation Occurred
1960-08-06 Finished Drilling
1960-08-06 Well Mode changed to Drilled and Cased
1960-08-07 Production Casing Operation Performed
1960-08-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-08-17 Perforation Treatment Performed - Jet Perforation
1960-08-20 Perforation Treatment Performed - Cement Squeeze
1960-08-25 Perforation Treatment Performed - Bullet Perforation
1960-08-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-09-13 Well Began Production
1960-09-13 Well Fluid changed to Crude Oil
1960-09-13 Well Mode changed to Flowing
1960-10-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1960-10-26 Perforation Treatment Performed - Jet Perforation
1960-10-27 Perforation Treatment Performed - Acid Wash - No Pressure
1962-10-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-06-17 Perforation Treatment Performed - Jet Perforation
1976-06-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-11-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-11-25 Well Fluid changed to Crude Oil
1980-11-25 Well Mode changed to Pumping
1996-10-12 Well Log Performed
2002-06-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-06-04 Plug Back Performed
2002-06-04 Well Fluid changed to Crude Oil
2002-06-04 Well Mode changed to Abandoned Zone
2002-06-07 Perforation Treatment Performed - Cement Squeeze
2002-06-07 Perforation Treatment Performed - Jet Perforation
2002-06-07 Plug Back Performed
2002-07-03 Well Abandoned
2002-07-03 Well Fluid changed to Crude Oil
2002-07-03 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-08-17 Perforation 2681.60 2684.70 3
1976-06-17 Perforation 2633.50 2639.30 3
1976-06-19 Acid Treatment 2633.50 2639.30 0
1980-11-06 Acid Treatment 2633.50 2639.30 0
2002-06-04 Packing Device Capped w/Cement 2602.30 2620.00 0
2002-06-07 Perforation 575.00 575.30 14
2002-06-07 Cement Squeeze 575.00 575.30 0
1960-08-17 Acid Treatment 2681.60 2684.70 0
1960-08-20 Cement Squeeze 2681.60 2684.70 0
1960-08-25 Bullet Perforation 2682.80 2685.90 7
1960-08-26 Acid Treatment 2682.80 2685.90 0
1960-10-26 Packing Device Capped w/Cement 2679.20 2679.20 0
1960-10-26 Perforation 2640.80 2646.90 3
1960-10-27 Acid Wash 2640.80 2646.90 0
1962-10-28 Acid Treatment 2640.80 2646.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7833 0.0 0.0 0.0
1968 7686 0.0 0.0 0.0
1969 7445 0.0 0.0 0.0
1970 8350 0.0 0.0 0.0
1971 7887 0.0 0.0 0.0
1972 6578 0.0 0.0 0.0
1973 7691 0.0 0.0 0.0
1974 8005 0.0 0.0 0.0
1975 6962 0.0 0.0 0.0
1976 8356 0.0 0.0 0.0
1977 8560 0.0 0.0 0.0
1978 7945 0.0 0.0 0.0
1979 3588 0.0 0.0 0.0
1980 698 0.0 0.0 0.0
1981 8294 0.0 0.0 0.0
1982 7702 0.0 0.0 0.0
1983 658 0.0 0.0 0.0
1984 7115 0.0 0.0 0.0
1985 8189 0.0 0.0 0.0
1986 8122 0.0 0.0 0.0
1987 8539 0.0 0.0 0.0
1988 8703 0.0 0.0 0.0
1989 7930 0.0 0.0 0.0
1990 8216 0.0 0.0 0.0
1991 7971 0.0 0.0 0.0
1992 6893 0.0 0.0 0.0
1993 2798 0.0 0.0 0.0
1994 8026 0.0 0.0 0.0
1995 8613 0.0 0.0 0.0
1996 7792 0.0 0.0 0.0
1997 8617 0.0 0.0 0.0
1998 8628 0.0 0.0 0.0
1999 8713 0.0 0.0 0.0
2000 8742 0.0 0.0 0.0
2001 8686 0.0 0.0 0.0
2002 3634 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1960-07-08 Lost Circulation 91.40 91.40

For data sources see[6]

References