X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645111010000

Well Details

Well ID: 0645111010000
Loading map...
Location: 00/10-10-064-11W5/0
Location Alias: 00/10-10-64-11 W5M
Location Alias 2: 00/10-10-064-11 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 11
Section: 10
County/Municipality: Big Lakes County
Well Name: ACCEL JUDYCK 10-10-64-11
Operator Name: ACCEL Energy Canada Limited
License Number: 0018225
License Date: 1959-12-01
License Status: Suspension
Spud Date: 1959-12-03
Final Drill Date: 1960-01-16
Well Total Depth: 2752.30 m
Surface Hole Latitude: 54.525189
Surface Hole Longitude: -115.573398

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-12-01 Obtained License
1960-01-16 Finished Drilling
1960-01-16 Well Mode changed to Drilled and Cased
1960-01-19 Production Casing Operation Performed
1960-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-01-20 Perforation Treatment Performed - Jet Perforation
1960-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-01-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1960-01-22 Perforation Treatment Performed - Jet Perforation
1960-02-13 Well Began Production
1960-02-13 Well Fluid changed to Crude Oil
1960-02-13 Well Mode changed to Flowing
1967-05-24 Perforation Treatment Performed - Jet Perforation
1967-05-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-05-26 Well Fluid changed to Crude Oil
1967-05-26 Well Mode changed to Flowing
1970-08-19 Perforation Treatment Performed - Acid Wash - No Pressure
1970-08-23 Perforation Treatment Performed - Cement Squeeze
1970-08-28 Perforation Treatment Performed - Jet Perforation
1972-08-29 Perforation Treatment Performed - Cement Squeeze
1972-08-31 Perforation Treatment Performed - Cement Squeeze
1972-08-31 Well Fluid changed to Crude Oil
1972-08-31 Well Mode changed to Flowing
1972-09-02 Perforation Treatment Performed - Cement Squeeze
1972-09-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-09-14 Perforation Treatment Performed - Jet Perforation
1974-06-10 Well Fluid changed to Crude Oil
1974-06-10 Well Mode changed to Pumping
1981-03-05 Perforation Treatment Performed - Cement Squeeze
1987-01-15 Well Log Performed
1987-01-17 Well Log Performed
2002-08-02 Well Log Performed
2007-11-11 Well Log Performed
2016-12-01 Well Fluid changed to Crude Oil
2016-12-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-01-20 Perforation 2699.30 2704.50 3
1970-08-23 Cement Squeeze 1415.50 1418.20 0
1970-08-28 Perforation 1415.50 1418.20 7
1972-08-29 Cement Squeeze 1415.50 1418.20 0
1972-08-31 Cement Squeeze 1415.50 1418.20 0
1972-09-02 Cement Squeeze 1415.50 1418.20 0
1972-09-14 Perforation 2629.80 2642.60 7
1972-09-14 Perforation 2648.70 2651.20 7
1972-09-14 Perforation 2654.80 2655.70 7
1972-09-14 Perforation 2657.60 2658.80 7
1972-09-14 Perforation 2661.50 2664.60 7
1960-01-20 Acid Treatment 2699.30 2704.50 0
1972-09-14 Acid Treatment 2629.80 2664.60 0
1981-03-05 Cement Squeeze 1415.50 1418.20 0
1960-01-22 Packing Device Capped w/Cement 2692.90 2692.90 0
1960-01-22 Perforation 2668.20 2671.30 3
1960-01-22 Perforation 2673.10 2677.10 3
1960-01-22 Acid Treatment 2668.20 2677.10 0
1967-05-24 Perforation 1415.50 1418.20 7
1967-05-26 Acid Treatment 1415.50 1418.20 0
1970-08-19 Acid Wash 1415.50 1418.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 3380 0.0 0.0 0.0
1972 1410 0.0 0.0 0.0
1973 8222 0.0 0.0 0.0
1974 4570 0.0 0.0 0.0
1975 2121 0.0 0.0 0.0
1976 5746 0.0 0.0 0.0
1977 6536 0.0 0.0 0.0
1978 3037 0.0 0.0 0.0
1979 6734 0.0 0.0 0.0
1980 7543 0.0 0.0 0.0
1981 6807 0.0 0.0 0.0
1982 7453 0.0 0.0 0.0
1983 8614 0.0 0.0 0.0
1984 8416 0.0 0.0 0.0
1985 8061 0.0 0.0 0.0
1986 8627 0.0 0.0 0.0
1987 8334 0.0 0.0 0.0
1988 8574 0.0 0.0 0.0
1989 8417 0.0 0.0 0.0
1990 8540 0.0 0.0 0.0
1991 7551 0.0 0.0 0.0
1992 7252 0.0 0.0 0.0
1993 3654 0.0 0.0 0.0
1994 8464 0.0 0.0 0.0
1995 8725 0.0 0.0 0.0
1996 8545 0.0 0.0 0.0
1997 8567 0.0 0.0 0.0
1998 8628 0.0 0.0 0.0
1999 8691 0.0 0.0 0.0
2000 8582 0.0 0.0 0.0
2001 8640 0.0 0.0 0.0
2002 8314 0.0 0.0 0.0
2003 8695 0.0 0.0 0.0
2004 8500 0.0 0.0 0.0
2005 8685 0.0 0.0 0.0
2006 8704 0.0 0.0 0.0
2007 8466 0.0 0.0 0.0
2008 8766 0.0 0.0 0.0
2009 8138 0.0 0.0 0.0
2010 8735 0.0 0.0 0.0
2011 8457 0.0 0.0 0.0
2012 8660 0.0 0.0 0.0
2013 8278 0.0 0.0 0.0
2014 8592 0.0 0.0 0.0
2015 8397 0.0 0.0 0.0
2016 5796 0.0 0.0 0.0

For data sources see[5]

References