X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645110110000

Well Details

Well ID: 0645110110000
Loading map...
Location: 00/10-01-064-11W5/0
Location Alias: 00/10-01-64-11 W5M
Location Alias 2: 00/10-01-064-11 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 11
Section: 01
County/Municipality: Big Lakes County
Well Name: ACCEL JUDYCK 10-1-64-11
Operator Name: ACCEL Energy Canada Limited
License Number: 0019064
License Date: 1960-05-19
License Status: Abandoned
Spud Date: 1960-08-19
Final Drill Date: 1960-09-18
Well Total Depth: 2660.90 m
Surface Hole Latitude: 54.510250
Surface Hole Longitude: -115.523433

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-05-19 Obtained License
1960-09-18 Finished Drilling
1960-09-18 Well Mode changed to Drilled and Cased
1960-09-20 Production Casing Operation Performed
1960-09-29 Perforation Treatment Performed - Jet Perforation
1960-10-05 Well Began Production
1960-10-05 Well Fluid changed to Crude Oil
1960-10-05 Well Mode changed to Flowing
1960-10-06 Perforation Treatment Performed - Acid Wash - No Pressure
1960-10-07 Perforation Treatment Performed - Acid Wash - No Pressure
1960-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-03-10 Perforation Treatment Performed - Jet Perforation
1972-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-07-03 Perforation Treatment Performed - Jet Perforation
1975-07-04 Perforation Treatment Performed - Jet Perforation
1975-07-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-12-15 Perforation Treatment Performed - Jet Perforation
1980-12-16 Perforation Treatment Performed - Jet Perforation
1980-12-19 Perforation Treatment Performed - Fractured
1980-12-21 Perforation Treatment Performed - Fractured
1981-12-01 Well Fluid changed to Crude Oil
1981-12-01 Well Mode changed to Suspended
1986-11-25 Well Log Performed
1987-03-21 Well Log Performed
1987-04-15 Well Log Performed
1987-12-13 Well Log Performed
1988-08-05 Well Log Performed
1991-05-31 Well Log Performed
1994-03-31 Perforation Treatment Performed - Cement Squeeze
1994-03-31 Plug Back Performed
1994-08-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-08-14 Plug Back Performed
1994-08-14 Well Abandoned
1994-08-14 Well Fluid changed to Crude Oil
1994-08-14 Well Mode changed to Abandoned
1994-08-15 Perforation Treatment Performed - Selective Jet Perforations
1994-08-16 Perforation Treatment Performed - Cement Plug
1994-08-16 Perforation Treatment Performed - Remedial Casing
1997-04-18 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-09-29 Perforation 2631.30 2635.60 3
1975-07-03 Perforation 2584.10 2586.80 3
1975-07-03 Perforation 2587.80 2590.20 3
1975-07-03 Perforation 2590.80 2591.70 3
1975-07-04 Perforation 2601.20 2603.60 3
1975-07-04 Perforation 2604.20 2608.50 3
1975-07-05 Acid Treatment 2584.10 2596.90 0
1975-07-05 Acid Treatment 2601.20 2624.30 0
1980-12-15 Perforation 2607.60 2630.40 7
1980-12-16 Perforation 2601.20 2604.20 7
1980-12-16 Perforation 2587.40 2593.80 7
1960-09-29 Perforation 2591.70 2596.90 3
1980-12-16 Perforation 2582.30 2585.30 7
1980-12-19 Fracture 2587.40 2630.40 0
1980-12-21 Fracture 2582.30 2590.20 0
1994-03-31 Cement Squeeze 2582.30 2635.60 0
1994-08-14 Packing Device Capped w/Cement 2565.20 2575.20 0
1994-08-15 Selective Jet Perforations 313.00 313.00 6
1994-08-16 Remedial Casing Cementing 313.00 313.00 0
1994-08-16 Cement Plug 94.00 313.00 0
1960-10-06 Acid Wash 2591.70 2596.90 0
1960-10-07 Acid Wash 2591.70 2596.90 0
1960-10-19 Acid Treatment 2591.40 2596.90 0
1972-03-10 Perforation 2622.50 2624.30 3
1972-03-10 Perforation 2616.40 2619.10 3
1972-03-10 Perforation 2612.40 2613.70 3
1972-03-12 Acid Treatment 2612.40 2624.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1968 1379 0.0 0.0 0.0
1969 352 0.0 0.0 0.0
1972 6297 0.0 0.0 0.0
1973 7457 0.0 0.0 0.0
1975 4155 0.0 0.0 0.0
1976 8675 0.0 0.0 0.0
1977 3326 0.0 0.0 0.0
1978 6496 0.0 0.0 0.0

For data sources see[5]

References