X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0645103616000

Well Details

Well ID: 0645103616000
Loading map...
Location: 00/16-36-064-10W5/0
Location Alias: 00/16-36-64-10 W5M
Location Alias 2: 00/16-36-064-10 W5/00
Country: Canada
Province: Alberta
Township: 064
Meridian: 5
Range: 10
Section: 36
County/Municipality: Big Lakes County
Well Name: CPEC SWANHS 16-36-64-10
Operator Name: Crescent Point Energy Corp.
License Number: 0109399
License Date: 1984-09-20
License Status: Issued
Spud Date: 1984-09-26
Final Drill Date: 1984-10-12
Well Total Depth: 2492.00 m
Surface Hole Latitude: 54.586083
Surface Hole Longitude: -115.366360

For data sources see[1][2]

Well History

Date Event
1984-09-20 Obtained License
1984-09-26 Lost Circulation Occurred
1984-09-28 Surface Casing Operation Performed
1984-10-12 Finished Drilling
1984-10-12 Well Log Performed
1984-10-12 Well Mode changed to Drilled and Cased
1984-10-15 Drill Stem Test Performed
1984-10-16 Drill Stem Test Performed
1984-10-17 Drill Stem Test Performed
1984-10-20 Production Casing Operation Performed
1984-10-20 Rig Released
1984-12-14 Well Log Performed
1984-12-18 Perforation Treatment Performed - Jet Perforation
1984-12-18 Well Began Production
1984-12-18 Well Fluid changed to Crude Oil
1984-12-18 Well Mode changed to Pumping
1985-03-18 Well Log Performed
1985-03-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-03-19 Plug Back Performed
1985-03-19 Well Fluid changed to Crude Oil
1985-03-19 Well Mode changed to Abandoned Zone
1985-03-20 Well Log Performed
1985-03-21 Perforation Treatment Performed - Jet Perforation
1985-03-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-08-29 Perforation Treatment Performed - Fractured
2019-02-07 Well Log Performed
2019-02-08 Well Log Performed
2019-02-10 Well Log Performed
2019-03-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-03-12 Perforation Treatment Performed - Jet Perforation
2019-03-12 Plug Back Performed
2019-03-13 Perforation Treatment Performed - Jet Perforation
2019-03-14 Perforation Treatment Performed - Jet Perforation
2019-03-14 Well Log Performed
2019-03-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-03-21 Well Log Performed
2020-03-09 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-12-18 Perforation 2473.00 2477.00 13
2019-03-12 Perforation 1816.00 1821.00 17
2019-03-13 Perforation 1812.00 1816.00 2
2019-03-13 Perforation 1752.00 1757.00 17
2019-03-13 Perforation 1747.00 1752.00 17
2019-03-13 Perforation 1742.00 1747.00 17
2019-03-13 Perforation 1737.00 1742.00 17
2019-03-14 Perforation 1726.50 1731.50 17
2019-03-14 Perforation 1707.00 1712.00 17
2019-03-14 Perforation 1702.00 1707.00 17
2019-03-14 Perforation 1666.00 1670.00 17
1985-03-19 Packing Device Capped w/Cement 2459.00 2467.00 0
2019-03-20 Acid Treatment 1666.00 1830.00 0
2020-03-09 Acid Treatment 1666.00 1830.00 0
1985-03-21 Perforation 2424.00 2426.50 13
1985-03-21 Perforation 2427.00 2430.50 13
1985-03-22 Acid Treatment 2424.00 2430.50 0
1990-08-29 Fracture 2424.00 2430.50 0
2019-03-12 Packing Device Capped w/Cement 2403.30 2411.30 0
2019-03-12 Perforation 1826.00 1830.00 17
2019-03-12 Perforation 1823.00 1826.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 96 0.0 0.0 0.0
1985 865 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1984-09-26 Lost Circulation 24.00 24.00
2019-02-21 No Incident Encountered 0.00 0.00
2019-04-07 No Incident Encountered 0.00 0.00
2020-03-09 No Incident Encountered 0.00 0.00

For data sources see[6]

References